Not sure if I have mis-understood something somewhere but which platforms are to be capable of 11 car Pendolino operation?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fowler9

Established Member
Joined
29 Oct 2013
Messages
8,380
Location
Liverpool
Not sure if I have mis-understood something somewhere but which platforms are to be capable of 11 car Pendolino operation?
As far as I know it is going to remain platform 7 and possibly 9. 6 & 8 are now permanently gone at that length. No other platform in the 1 to 6 area can be stretched to that length.
 

louis97

Established Member
Joined
14 May 2008
Messages
2,150
Location
Derby
Not sure if I have mis-understood something somewhere but which platforms are to be capable of 11 car Pendolino operation?

The new platforms 6, 9 and 10 (the current 7, 8 and 9) will be capable, with platform lengths of 270, 270 and 267 metres.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
The new platforms 6, 9 and 10 (the current 7, 8 and 9) will be capable, with platform lengths of 270, 270 and 267 metres.

How is platform 9 (new) going to fit a 11 car pendo if the track for the new 7 & 8 have encroached onto the existing platform? It's not possible for both 6&9 to be 270m
 

louis97

Established Member
Joined
14 May 2008
Messages
2,150
Location
Derby
How is platform 9 (new) going to fit a 11 car pendo if the track for the new 7 & 8 have encroached onto the existing platform? It's not possible for both 6&9 to be 270m

I'm just quoting what both the Train Planning Rules and the Signalling Scheme Plans say.

Worth noting that there will only be a single track running into new platforms 7 and 8 from the throat with the point work to take you into either being further into the station. New platforms 7 and 8 are both only 156 metres long.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Just looked at the new setup. I can't see how an 11 can go in. The platform has been cut back too much to fit one in.
 

fowler9

Established Member
Joined
29 Oct 2013
Messages
8,380
Location
Liverpool
Just looked at the new setup. I can't see how an 11 can go in. The platform has been cut back too much to fit one in.
Can't the original 8/new 9 be extended? I think it was just shortened to allow construction work to be done. The new platforms 7 & 8 join up with the old 7. I really am mixing my platform numbers up now, ha ha.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Can't the original 8/new 9 be extended? I think it was just shortened to allow construction work to be done. The new platforms 7 & 8 join up with the old 7. I really am mixing my platform numbers up now, ha ha.

Judging by the signal base that has been put in, the cab of an 11 car would be virtually underneath it, so I would think not.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,202
There is a 2015 presentation (which has been quoted before) online here:
https://www.slideshare.net/merseyrailways/merseytravel-committee-presentation-dec-2014

Thank you for linking that. It certainly makes it more clear what is proposed.

I still don't quite see the point of gaining 2 platforms and losing two others. Moreover the goal of "wider platforms and safer train access" seems to be negated.

A big driver seems to be getting Pendolini into the slow line side "during perturbation" but, for the times this happens, could they not just use the ladders to reach the fast l
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Thank you for linking that. It certainly makes it more clear what is proposed.

I still don't quite see the point of gaining 2 platforms and losing two others. Moreover the goal of "wider platforms and safer train access" seems to be negated.

A big driver seems to be getting Pendolini into the slow line side "during perturbation" but, for the times this happens, could they not just use the ladders to reach the fast l

There's only one platform being lost. (old platform 1) not 2.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There's an item about the recent project in the new issue of Rail magazine (#839, pp. 24-25). It says
During the first nine days, attention focused on work to enable Platforms 1 and 2 to open for temporary bi-directional operation, which was achieved on October 9.

I'm having difficulty understanding how terminal platforms can work other than bi-directionally.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Platform access not limited to entering from the up and leaving on the down lines or vice versa.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
There's an item about the recent project in the new issue of Rail magazine (#839, pp. 24-25). It says


I'm having difficulty understanding how terminal platforms can work other than bi-directionally.

It must mean allowing access to the WCML. During the partial closure Platforms 1 and 2 only had services to Manchester via Chat Moss, I think only using one or two tracks to Edge Hill. Very poor choice of words though!
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,201
Platform access not limited to entering from the up and leaving on the down lines or vice versa.

I'm sure there was an Up Chat Moss train leaving on what I'd regard as the Down Slow the other day - is that now practice?
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
No, what th
It must mean allowing access to the WCML. During the partial closure Platforms 1 and 2 only had services to Manchester via Chat Moss, I think only using one or two tracks to Edge Hill. Very poor choice of words though!

No, what actually was done, was to enable trains to run on the up slow in both directions from edge hill. The L.O.S. was bagged up and a couple of signals either put in or bagged up to enable bi di working on the up slow. LS53 had a route indicator put on. It's all been covered up now until required again during the next block.

Trains can go out on the down slow out of Lime St. They then get another signal to put them on the up.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
Another new feature I noticed this week was a couple of substantial metal ladders fixed to the cutting walls on the route up to Edge Hill.
Maybe these are for emergency use or easier engineering access.
Can't say I'd fancy climbing up vertically for 15 meters or so!
Where the two new platforms are being built the team were wheeling large tubs of ready mixed concrete across the concourse and through the security gates.
You do see some odd things in construction these days.
 

PDG1949

Member
Joined
21 May 2014
Messages
323
Location
St. Helens, Merseyside
It must mean allowing access to the WCML. During the partial closure Platforms 1 and 2 only had services to Manchester via Chat Moss, I think only using one or two tracks to Edge Hill. Very poor choice of words though!

Agreed - there's no two ways about it ......................
 

xtradj

Member
Joined
24 Jul 2006
Messages
547
Platform 6 and 9 will close this Xmas to be remodelled

The current platform 8 will become platform 9

The newly built platform will open as platform 8

Will the current platform 7 (virgin) become platform 6 for now?

Reason I ask this is the new platform 8 surely is also a new platform 7 as two lines were built? I thought two new platforms were built not one?

https://www.networkrail.co.uk/running-the-railway/our-routes/lnw/liverpool-city-region-upgrade/

No mention of a platform 7 here so I’m confused?
 

nw-sparks

Member
Joined
10 Oct 2013
Messages
272
Location
Liverpool
Old 7 will definitely become new 6 at some stage, but I don't know when they are going to renumber it.

As you say, the two new platforms will be 7 and 8 but we're only getting 8 at Christmas for some reason. This may be a signalling constraint, they will want to minimise changes to the 1940s interlocking.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
As well as several sets of new ladders fixed on the Lime St cutting walls, I noticed a larger installation which might be a new access lift, against one of the tunnel portals.
The city end of the cutting/tunnels also now has bright new lighting, with temporary lights at the Edge Hill end.
It can't be easy working in the near dark down there in the restricted space.
 

notlob.divad

Established Member
Joined
19 Jan 2016
Messages
1,609
Platform 6 and 9 will close this Xmas to be remodelled

Not just 6 and 9, it is a whole station blockade again. Virgin, TPE and LM terminating at South Parkway again. Northern at Hunts Cross and Huyton.
 

PDG1949

Member
Joined
21 May 2014
Messages
323
Location
St. Helens, Merseyside
Platform 6 and 9 will close this Xmas to be remodelled

The current platform 8 will become platform 9

The newly built platform will open as platform 8

Will the current platform 7 (virgin) become platform 6 for now?

Reason I ask this is the new platform 8 surely is also a new platform 7 as two lines were built? I thought two new platforms were built not one?

https://www.networkrail.co.uk/running-the-railway/our-routes/lnw/liverpool-city-region-upgrade/

No mention of a platform 7 here so I’m confused?

Surely if Platform 1 is to disappear later next year, won't they have to re-number again ?
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Mystified as I am why the north shed must lose a platform under remodelling (bearing in mind that the elimination of defunct carriage roads will presumably provide a lot of space to play with, and even taking into account the curvature of the rracks leading into it), I would have thought that the new, extra-wide platform 1 could most sensibly be used for Transpennine services via the Chat Moss and (when Glasgow services begin) Wigan lines. The sheddy bits alongside could then be repurposed as new waiting rooms and retail units.
 