• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Trivia: Electrified lines with no electric services

Status
Not open for further replies.

jfowkes

Established Member
Joined
20 Jul 2017
Messages
1,268
Bedford platforms 1a and 4 must not see many EMUs, or the track between 3 and 4.

Is 1a used for stabling though maybe?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Bedford platforms 1a and 4 must not see many EMUs, or the track between 3 and 4.

Is 1a used for stabling though maybe?

Given all EMUs serving Bedford are (for now) at least 8 car in length, I think they'll be too long for 1A.

Platform 4 and the Up Fast Line are not electrified.
 

DanTrain

Member
Joined
9 Jul 2017
Messages
753
Location
Sheffield
Does anything electric use the EMT platforms at St Pancras? Or are there occasional Thameslink trains in there? Corby 387s will soon change this anyway
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,796
Location
West of Andover
Does anything electric use the EMT platforms at St Pancras? Or are there occasional Thameslink trains in there? Corby 387s will soon change this anyway

Occasional use of platform 1 at St Pancras by 700s when the core is closed for engineering. I've never seen them use other platforms in the high level.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Occasional use of platform 1 at St Pancras by 700s when the core is closed for engineering. I've never seen them use other platforms in the high level.
At some point during the rebuild (pre-Eurostar transfer/HS1 I believe), Thameslink ran a limited service to St Pancras high level using 319s and the hired Moorgate 317s... but used what are now the South Eastern platforms.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,283
At some point during the rebuild (pre-Eurostar transfer/HS1 I believe), Thameslink ran a limited service to St Pancras high level using 319s and the hired Moorgate 317s... but used what are now the South Eastern platforms.
Thameslink operated as two separate north and south sections between Sept 2004 and March 2005 while the box for the new low level station was built around the closed line. As you suggest, this was well before the HS1 services started, in November 2007.
 
Status
Not open for further replies.

Top