As the title says, are there electrified lines where only diesel trains run?

My suggestions are the York avoiding lines and the freight lines south of Doncaster.

Are these correct? Any others?

I imagine that there are also specific platforms that are electrified but are only served by diesels - bay platforms in particular at places like Carlisle.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
As the title says, are there electrified lines where only diesel trains run?

My suggestions are the York avoiding lines and the freight lines south of Doncaster.

Are these correct? Any others?

I imagine that there are also specific platforms that are electrified but are only served by diesels - bay platforms in particular at places like Carlisle.

I don't think Hazel Grove sees (m)any electric services nowadays.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
One per day only I think in either morning or evening peak.

Ordsall Chord South to West will be diesel only for a while.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
For the time being, blockade notwithstanding, I don't think there's any passenger services to or from Seven Sisters that pass through Tottenham South
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
The lengthy sectiom of dead end wires on the curve between Farington Jn and Lostock Hall Jn (for loco changes) see virtually no use. As does the similar overrun on the Barrow route at Carnforth via the Goods Loop (and the part wired Up platform at Carnforth itself).
 

Harbornite

Established Member
Joined
7 May 2016
Messages
3,627
Lymington branch often sees a dmu subbing for an emu.

The Lymington branch doesn't really meet the criteria of this thread as it has regular electric services on weekends. Having said that, all the weekday services are booked for a DMU.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Although not lines as such; platform 1 and platforms 5 to 12 at Newcastle are electrified, but never used by electric trains
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,254
When the WCML electrification was done starting in the North-West, there was a very considerable amount of wiring that never saw use. Someone once calculated that the amount of wire in Basford Hall yard, where no train locos entered and all the shunting was done by diesel shunters, was sufficient to wire from Crewe to Kidsgrove. The same was true of Speke Junction, Edge Hill, and other yards. Junctions with diesel lines had enormous run-offs compared to nowadays. Elements of all this are still there.

A lot of the platforms at Paddington were wired when the Heathrow Express started but never used by electric services until now; likewise all four tracks were done on the GW main line but for the first 10 years only the Heathrow services on the Mains were electric, and wiring on the Reliefs was unused
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
When the WCML electrification was done starting in the North-West, there was a very considerable amount of wiring that never saw use. Someone once calculated that the amount of wire in Basford Hall yard, where no train locos entered and all the shunting was done by diesel shunters, was sufficient to wire from Crewe to Kidsgrove. The same was true of Speke Junction, Edge Hill, and other yards. Junctions with diesel lines had enormous run-offs compared to nowadays. Elements of all this are still there.
This is clearly a reference to the original 1960s electrification south from Liverpool and Manchester. By the time Weaver Junction to Glasgow was done in the 1970s they'd discovered rationalisation. Track layouts were simplified and only necessary bits were wired.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,163
Location
Wilmslow
Reading West Curve will be a candidate when energised (January?) - the 'Electric Spine' is a distant memory now. Maybe some ECS workings to and from the depot however?
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Stechford Aston

Doesn't the ECS for the morning Birmingham International-Euston (c. 0740?) go that way?

When the WCML electrification was done starting in the North-West, there was a very considerable amount of wiring that never saw use. Someone once calculated that the amount of wire in Basford Hall yard, where no train locos entered and all the shunting was done by diesel shunters, was sufficient to wire from Crewe to Kidsgrove. The same was true of Speke Junction, Edge Hill, and other yards. Junctions with diesel lines had enormous run-offs compared to nowadays. Elements of all this are still there.

A lot of the platforms at Paddington were wired when the Heathrow Express started but never used by electric services until now; likewise all four tracks were done on the GW main line but for the first 10 years only the Heathrow services on the Mains were electric, and wiring on the Reliefs was unused

On the Woodhead electrification, I wonder if the wires up to the Goods shed entrance at Broadbottom ever saw use (where an overhead mast can still be seen in situ)?
 

topydre

Member
Joined
2 Jan 2012
Messages
212
Newhaven - Newhaven Marine
Folkestone Harbour branch

(Well, no passenger electric trains in revenue service at any rate)
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,746
Location
Glasgow
No electric trains use Glasgow Queen Street and it is electrified however electric trains are due to run from Queen St later next year
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,170
Does anything use the electrified Stamford down line, north of Peterborough?
 

Scotrail84

On Moderation
Joined
5 Jul 2010
Messages
2,977
No electric trains use Glasgow Queen Street and it is electrified however electric trains are due to run from Queen St later next year


There is a 10 week trail now for a Friday only 00:10 Edb-Glq and 01:10 Glq-Edb service using 380s, in fact a 380 ran into queen street last friday on a test service I believe.
 

Scotrail84

On Moderation
Joined
5 Jul 2010
Messages
2,977
The platform at Newcraighall sees no booked electric services, the through road into millerhill yard may see occasional use by electric traction just now but when the depot is built the 385s will live there.
 

PeterC

Established Member
Joined
29 Sep 2014
Messages
4,771
For the time being, blockade notwithstanding, I don't think there's any passenger services to or from Seven Sisters that pass through Tottenham South
I thought that, before the blockades, there was a solitary parliamentary going that way. I have also seen it used as an emergency turnback and there was a suggestion that some additional services could be turned there on a regular basis. I don't know of that is just on hold for the duration of the GOBLIN works or if the idea has been dropped.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Does anything use the electrified Stamford down line, north of Peterborough?

In years gone by, occasional East Coast services calling at Peterborough were booked via the Down Slow/Stamford to be overtaken. Don't think it has anything booked at the moment.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
In years gone by, occasional East Coast services calling at Peterborough were booked via the Down Slow/Stamford to be overtaken. Don't think it has anything booked at the moment.

Indeed they were. Although the ones I saw do it were HSTs.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,264
There is a 10 week trail now for a Friday only 00:10 Edb-Glq and 01:10 Glq-Edb service using 380s, in fact a 380 ran into queen street last friday on a test service I believe.

Is it just them services or are the 380s being used throughout the day ?
 