xotGD
Established Member
- Joined
- 4 Feb 2017
- Messages
- 7,875
There must be a few platforms at Leeds that never see a 91 or an emu. The east facing bays and P16/17. (Actually, are these all wired?)
Is it just them services or are the 380s being used throughout the day ?
All platforms at Leeds are wired (prior to the rebuild, 12 (now 15) wasn't, and I recall an incident where a MkIV set was routed in there with predictable results!) and although I've never seen anything electric in 17, I have seen a Doncaster service use 16 after coming off the depot. Never seen 7 used by an electric but 14 used to regularly have a 321 stabled OOS in.There must be a few platforms at Leeds that never see a 91 or an emu. The east facing bays and P16/17. (Actually, are these all wired?)
Changed since my commuting days on WA when the Graham road curve was almost mothballedOverground do use it as an emergency turnback siding during disruption.
If so they are operating tonight?AFAIK its 380s that are doing these services, they are due to start proper on the E + G this month I think.
I don't know if they do test the wires in any of Newcastle's bay platforms or not (I've never seen anything other than DMUs and 67s in the bays); though I'd be surprised if the wires for platforms 5 and 6 weren't tested, seeing that there is always the possibility of them being used for electric freight trains (on the rare occasions when electric locos are actually used on freight through Newcastle)Do they test the wires to check they are working ?
I don't know if they do test the wires in any of Newcastle's bay platforms or not (I've never seen anything other than DMUs and 67s in the bays); though I'd be surprised if the wires for platforms 5 and 6 weren't tested, seeing that there is always the possibility of them being used for electric freight trains (on the rare occasions when electric locos are actually used on freight through Newcastle)
Does anything use the electrified Stamford down line, north of Peterborough?
In years gone by, occasional East Coast services calling at Peterborough were booked via the Down Slow/Stamford to be overtaken. Don't think it has anything booked at the moment.
If so they are operating tonight?
I want to try 380 on E + G but not at that time
Although not lines as such; platform 1 and platforms 5 to 12 at Newcastle are electrified, but never used by electric trains
Many years ago on returning late at night on a 225 from London we arrived on platform 5/6 due to engineering work. We had to exit via the buffet door.I don't know if they do test the wires in any of Newcastle's bay platforms or not (I've never seen anything other than DMUs and 67s in the bays); though I'd be surprised if the wires for platforms 5 and 6 weren't tested, seeing that there is always the possibility of them being used for electric freight trains (on the rare occasions when electric locos are actually used on freight through Newcastle)
RTT reckons the shunt from Chathill uses Craghill Loop, (near Belford) that looks like it has four track gantries (but perhaps they're not wired?), but the services interwork with Metrocentre and Hexham in the current timetable. That'll be the main reason DMUs must be used in the present timetable.The Chathill services are electrified throughout for the part where passenger trains run but I think there is a siding which the trains use to turn round which isn't electrified..
Would VTEC crew sign the avoiding lines at York?Doesn't 1E01 use the York avoiding lines sometimes? It's not normally booked for this in fairness.
I've only been over them once in the down direction with a few other forum members on a railtour. It was a vtec driver, though i'm not sure what the rules are and how they differ with railtours.Would VTEC crew sign the avoiding lines at York?
The sidings North of Westgate (Wrenthorpe loop) were used to store brand new 333s en route to Neville Hill, though whether they ran under their own power is another matter. Crippled IC225 sets have been put in there in the past, too. The wires are energised though, which unfortunately led to a local youth being killed when climbing on hoppers which were parked there a few years ago.A few more:
Wired siding just north of Northallerton station.
Sidings north of Wakefield Westgate
Line from Low Fell Yard towards Norwood Junction (used in the past for electric locos to run round sets of parcels / mail vans)
Leeds avoiding curve.
Are the south-facing bays at Doncaster wired?
Doesn't 1E01 use the York avoiding lines sometimes? It's not normally booked for this in fairness.
The wires serving Haymarket Platform 0 haven't been used in a long time, and I imagine those above 1 and 2 don't see regular usage either.
Not at the moment. A proportion of trains from the Linlithgow direction use the crossovers West of Haymarket to come in by the Fife lines, because of congestion on the others, but I don't think that Bathgate trains ever come in that way, although they could.
There are, indeed. Looking at a weekday timetable it looks like at least two dozen services that operate to/from electrified destinations which call at Platforms 1 or 2.This is just one example and I'm quite sure there are plenty of other times the wires are used.
I appreciate your research.