• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

ECML delays 9/11

Status
Not open for further replies.

SaveECRewards

Member
Joined
22 Jan 2015
Messages
737
There appears to be a train broken down outside of Doncaster blocking other trains going north. Can anyone provide any other info?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SaveECRewards

Member
Joined
22 Jan 2015
Messages
737
1S09 is broken down just after Shaftholme jn north of Doncaster. The rescue engine has arrived to bring it back to Doncaster.
Thanks for confirming which one has broken down. I'm curious as to why this has taken so long to deal with, it seems additional issues were found when the rescue locomotive arrived. Any ideas?
 

TMLB UK

Member
Joined
10 May 2010
Messages
272
Location
UK
Looks like they are sending a Leeds train around you on the slow. Literally ran out of places to loop trains heading to york now.

This is quite unusual.
 

gavin

Member
Joined
25 Dec 2006
Messages
1,006
Broken down train is heading to Doncaster NB line will be reopened very shortly
 

gavin

Member
Joined
25 Dec 2006
Messages
1,006
1S10 (0930 London Kings Cross - Edinburgh) now on the move to inspect the line where 1S09 broke down services held south of Donny should be starting to move shortly
 
Last edited:

Tracked

Established Member
Joined
30 May 2011
Messages
1,337
Location
53.5440°N 1.1510°W
Agreed 1S09 the failed train appears to be moving back towards Doncaster

It's been quite a while, I was on the 10:00 EDB-KGX to Doncaster, we passed by at about 12:55 and a DBS 67 was already attached, so that's about 3 hours for a train that failed 10 minutes from Doncaster (where I assume the 67's been?).

A couple of years ago I was on a train that failed at Alnmouth one Sunday, was only an hour late into Doncaster, which included a drag from a pair of 66's and 15 min's at Newcastle.
 

GW43125

Established Member
Joined
8 Dec 2014
Messages
2,310
Thanks for confirming which one has broken down. I'm curious as to why this has taken so long to deal with, it seems additional issues were found when the rescue locomotive arrived. Any ideas?

If it's taken a while to move after the loco has attached, that may suggest there's an air and/or other brake issue preventing movement. In which case, you're a bit stuffed.
 

Class315

Member
Joined
9 Feb 2008
Messages
329
South of the main disruption, 1S23 15:30 London King’s Cross - Glasgow Central has come to a stand just south of the platform at Stevenage, with all services using the down slow from Woolmer Green to Hitchin.
 

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,398
If it's taken a while to move after the loco has attached, that may suggest there's an air and/or other brake issue preventing movement. In which case, you're a bit stuffed.

Wasn’t it an air brake problem caused by vandalism that affected the Kings Cross to Glasgow service yesterday?

I’m sure it was around the Doncaster or York area as well. Possibly related in some way?
 

gavin

Member
Joined
25 Dec 2006
Messages
1,006
VT 1S23 London Kings Cross - Glasgow Central has broken down at Stevenage all NB services will pass on the slow line minor delays
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,879
Location
UK
Can admin create a new forum for ECML delays as they're a daily occurrence at the moment!
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,006
Location
Yellabelly Country
Had a text from the Mem. She advises the problem with 1S09 was a main res pipe fault. That explains the hissing air leak upon arrival back at Doncaster.

Seemingly this is the second time, that i am aware of, that problems between the failed train and rescue loco have occurred in the last week or so with VTEC.
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
The problem with the 1S09 breakdown was actually that although the fitter and rescue loco were deployed in good time, the fitter and driver had to make multiple different repairs to a badly damaged brake system before there was enough air pressure achieved to continue. There wasn’t really just one area of damage, but that fact was discovered after a substantial amount of time.

I don’t know precisely why the brake pipes (etc.) suffered quite so badly, but it adequately explains why another train had to examine the line.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,343
And now, for the 2nd day in a row, 1S23 the 15:30 Kings Cross - Glasgow is now at a stand with a fault in the Stevenage area.
 
Status
Not open for further replies.

Top