Up_Tilt_390
Member
- Joined
- 10 Oct 2015
- Messages
- 923
In regards to it's technical and operational side, the Pendolino is a great train because of how well it's able to complete up to around 1,300 miles per day, usually without issue as far as I'm aware. But from a passenger perspective, they're not exactly the best received trains, primarily due to luggage space and window size.
It's no secret that I love these trains (look at my username if you can't see it), but I have to acknowledge some of it's issues. But unfortunately, these issues might just be a result of the inevitable compromise to building a tilting train on one of, if not the most restrictive loading gauge in the world.
The need to house the Pendolino tilting technology meant that the carriage floor of the 390 has to placed higher, but because of the restrictive loading gauge we cannot make the roof higher, resulting in a smaller body which in turn results in smaller windows and having to place some things such as the air conditioning on the roof, which might just squeeze the roof down further and result in less luggage space.
On the European mainland this isn't a problem. The Pendolinos there have more room to play with, thus the trains can be slighter taller to house the requirements such as standard window size and luggage racks, and thus more space. Yes, the APT when it was in development seemed to have normal sized windows and luggage space, but that was a different tilting system that operated from the bottom rather than the centre I believe (correct me if I am wrong).
So given that many of you are far more knowledgeable than I am, do you think the problems that the Pendolinos face were an inevitability, or could you have worked around them while still retaining some of the essential requirements? Discuss further below if you can.
It's no secret that I love these trains (look at my username if you can't see it), but I have to acknowledge some of it's issues. But unfortunately, these issues might just be a result of the inevitable compromise to building a tilting train on one of, if not the most restrictive loading gauge in the world.
The need to house the Pendolino tilting technology meant that the carriage floor of the 390 has to placed higher, but because of the restrictive loading gauge we cannot make the roof higher, resulting in a smaller body which in turn results in smaller windows and having to place some things such as the air conditioning on the roof, which might just squeeze the roof down further and result in less luggage space.
On the European mainland this isn't a problem. The Pendolinos there have more room to play with, thus the trains can be slighter taller to house the requirements such as standard window size and luggage racks, and thus more space. Yes, the APT when it was in development seemed to have normal sized windows and luggage space, but that was a different tilting system that operated from the bottom rather than the centre I believe (correct me if I am wrong).
So given that many of you are far more knowledgeable than I am, do you think the problems that the Pendolinos face were an inevitability, or could you have worked around them while still retaining some of the essential requirements? Discuss further below if you can.
