Presumably 501 stayed put at Derby again (surely the 30+ faults discovered on November 28 should have been fixed by now). Although a few days ago a member of the southernrailway Yahoo Group mentioned it might be dragged this week and certainly not yesterday.
Interestingly, someone on uk.railway reckons that FCC should keeps its hands off the 377/2s and should be able to cope with shortformed KO0 services until the 377/5s arrive as the West London Line services suffer relatively worse overcrowding (apparently). Can't remember which thread though.
Oh, and Roger Ford of Modern Railways reckons the KO0 services will start with 14 377s (note that no sub-class is specified), which contradicts what we've heard elsewhere.
The sheer fact is no new rolling stock for KO0 means no KO0. Basically without the new trains we're talking about replacing full packed 6 car trains with 4 car services. Dangerous and ultimately the public will hit the roof as that is no improvement and I doubt eith DfT, FCC or SouthEastern would be willing to endure that.
Note as well Farringdon was running late (tho Im not sure if this is still the case) and that will have an impact on LU.
Thinking about it I can't see why some of the DV 375/6 CANT be used. If you only serve the major stations on the Bedford to Brighton route there are train dispatchers at these stations
So Im talking, Bedford, Luton, Luton Airport Parkway, St Pancras (can be done), Farringdon (can be done), City Thameslink (dispatching is coming back here soon), Blackfriars, London Bridge, East Croydon, Three Bridges, Haywards Heath and Brighton.
As for the Kent services, do 375/6 serve the routes the Networkers do? If they aren't allowed to run then maybe the Networkers would have to stay for now.