It's great news whatever the case. Hopefully for the December timetable, we will be able to get 8 car services running all weekend (especially Sunday) which will benefit all users on the line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

petersi

Member
Joined
24 Apr 2012
Messages
453
It's great news whatever the case. Hopefully for the December timetable, we will be able to get 8 car services running all weekend (especially Sunday) which will benefit all users on the line.


As I understand the plan is for the 387 to be on the fast Cambridge services from may. So this would require that all the stoppers would be class 700 from December. they are only lengthening the platforms in the down direction so up trains require SDO
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
Contractors are on-site at Foxton and Shepreth, laying concrete footings (spotted today from a passing train). Nothing at Meldreth yet.
 
Last edited:

philjo

Established Member
Joined
9 Jun 2009
Messages
3,018
There are engineering works closing the line for the next couple of weekends - it is buses replacing trains between Letchworth and Cambridge all day Saturday and Sunday this weekend and I think the following Sunday. so there should be some activity this weekend.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
d35e03b53ab89ef8dbda545e5fb57fc1.jpg


Works at Foxton today.


Sent from my iPhone using Tapatalk
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
More details about the works here: http://www.thameslinkprogramme.co.u...er-trains-three-south-cambridgeshire-stations

Interestingly it explains that Meldreth station platform is being lengthened by 20m to provide better access for the disabled. Given that the London-bound platform is inaccessible except via steps (either over the footbridge or up from the path across the field), I guess any disabled users wanting to go south must go all the way to Cambridge and back again. The local rail user group has been campaigning for a ramp from the London platform for years.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
More details about the works here: http://www.thameslinkprogramme.co.u...er-trains-three-south-cambridgeshire-stations

Interestingly it explains that Meldreth station platform is being lengthened by 20m to provide better access for the disabled. Given that the London-bound platform is inaccessible except via steps (either over the footbridge or up from the path across the field), I guess any disabled users wanting to go south must go all the way to Cambridge and back again. The local rail user group has been campaigning for a ramp from the London platform for years.

You could go to Shepreth or Foxton and cross via the Level Crossing at either. Still not ideal of course.

Going to Meldreth from Cambridge would be a faff - you'd have to head to Royston then cross via the road bridge and car parks to head back.
 

mervyn72

Member
Joined
23 Jul 2015
Messages
192
So just got a letter through the door from Network Rail. Apparently they have tested the new trains and the disabled access section fits in the current platforms so Meldreth will now NOT have any work done to it.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
So just got a letter through the door from Network Rail. Apparently they have tested the new trains and the disabled access section fits in the current platforms so Meldreth will now NOT have any work done to it.

Appears to be confirmed by the official page, which has been edited to no longer mention Meldreth: http://www.thameslinkprogramme.co.uk/villageplatforms

Our engineers are carrying out platform extensions at two stations in South Cambridgeshire. The two stations are Shepreth and Foxton
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
The concrete was being poured for the platform bases at Foxton today - I saw the cement mixer filling the formwork as I passed on my way to work.

At Shepreth things are further advanced - the concrete bases have been cast, and there's blockwork going in for ducts or drains.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
Concrete platform decks have been installed at both Foxton and Shepreth over the weekend - looks much more like a station now...
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
Foxton today.

c44acb1c0f14ee0f66dd04d6e7224cbc.jpg


Electrical conduit appears to be complete, now waiting on drainage, surfacing, fences and lighting. Shepreth is slightly further ahead, they've got base tarmac down on the platform there.


Sent from my iPhone using Tapatalk
 
Last edited:

adamedwards

Member
Joined
4 Apr 2016
Messages
796
Very pleased to see this. The sooner GN is all 8 car on anything Kings Cross the better. Making people stand on Sats and Suns does not make the trains look good T optional travellers.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
surprised at the mirror? Presumably this means they plan at least short term to have 8x365s call there? The 387s and 700s have in-can DOO.
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
surprised at the mirror? Presumably this means they plan at least short term to have 8x365s call there? The 387s and 700s have in-can DOO.

The mirror is the existing one for 4 cars, not a new one.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
Foxton now has tarmac, and the drainage looks finished.

Still waiting on a fence and lighting though. I guess the fence will go up last so as to preserve the access for the contractors.

ea6bd915ea88ac4c1885adaac4e8b35b.jpg
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
I guessed wrongly - fencing is now partially installed at both Shepreth and Foxton.

This is Foxton today.

7e5f14c4873be3fa11b4e657524c3b22.jpg


ad6db3bba92e5480381221fae96d9cef.jpg



Sent from my iPhone using Tapatalk
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,012
4759ae20d1041623c5e83c986c41b646.jpg


Lamp posts have been installed at Foxton. Looks like some of the existing ones are being resited, too - presumably to improve lighting for the train's cameras.
 
Last edited:

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,896
Location
UK
I do love how they've just buried the mirror in the Tarmac :lol:

If Network Rail isn't fitting any more platform monitors/cameras, I assume there's another mirror to go in at the far end of the platform? Otherwise what happens when a 365 turns up and there might not be a dispatcher in the daytime?
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,377
Location
Hertfordshire / Teesdale
If Network Rail isn't fitting any more platform monitors/cameras, I assume there's another mirror to go in at the far end of the platform? Otherwise what happens when a 365 turns up and there might not be a dispatcher in the daytime?

One presumes the idea is an 8-car 365 simply won't turn up there. The whole thing strikes me as a little half-hearted, although I can understand someone is attempting to achieve value for money. The work is evidently more about avoiding issues associated with level crossings than anything else.

(As an aside, at work over the weekend there was a lot of moaning about people having been unable to board 4-car services on the way up to London. I'm not sure if things may have been made worse by VTEC being up the wall - whilst it's normal for the stopping services to be hard to board by Hatfield it's certainly not normal for people to be being left behind as far back as Sandy! I gave up using GN at weekends ages ago - evidently the right judgement...)
 
Last edited:

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,141
One presumes the idea is an 8-car 365 simply won't turn up there. The whole thing strikes me as a little half-hearted, although I can understand someone is attempting to achieve value for money. The work is evidently more about avoiding issues associated with level crossings than anything else.

(As an aside, at work over the weekend there was a lot of moaning about people having been unable to board 4-car services on the way up to London. I'm not sure if things may have been made worse by VTEC being up the wall - whilst it's normal for the stopping services to be hard to board by Hatfield it's certainly not normal for people to be being left behind as far back as Sandy! I gave up using GN at weekends ages ago - evidently the right judgement...)

I don't know about the 4-car stopping service but on Sunday I caught the 1104 from Stevenage which was an 8-car 365. I boarded in the rear most carriage and it was proper wedged - far busier then we see in the morning peak.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,896
Location
UK
One presumes the idea is an 8-car 365 simply won't turn up there. The whole thing strikes me as a little half-hearted, although I can understand someone is attempting to achieve value for money.

Seems short sighted if any incident means swapping a unit and sending an 8-car 365 that will then have to skip the station if there's no dispatch staff there.

I guess if they're not installing monitors, they're not going to want to install mirrors either - given they're not considered safe in hours of darkness. I don't know if this is a firm ruling or just the DfT saving money because it believes the future is coach mounted cameras.

Which makes things a bit of a mess when GN isn't going to be running 100% of trains with in-cab monitors until the last 365s go (and of course the 313s but that's not relevant here).

As people have probably noticed, if a 387 has an in-cab DOO monitor fault then it skips stations without dispatchers available in the daytime.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,377
Location
Hertfordshire / Teesdale
Seems short sighted if any incident means swapping a unit and sending an 8-car 365 that will then have to skip the station if there's no dispatch staff there.

I guess if they're not installing monitors, they're not going to want to install mirrors either - given they're not considered safe in hours of darkness. I don't know if this is a firm ruling or just the DfT saving money because it believes the future is coach mounted cameras.

Which makes things a bit of a mess when GN isn't going to be running 100% of trains with in-cab monitors until the last 365s go (and of course the 313s but that's not relevant here).

As people have probably noticed, if a 387 has an in-cab DOO monitor fault then it skips stations without dispatchers available in the daytime.

The platforms should have been lengthened to 8 cars ages ago really, but we are where we are.

If an 8-car 365 ends up there, presumably it would have to skip Meldreth anyway, and if on an up service then it would have to skip all three.

The whole situation is a bit of a mess, but it comes down to money, and evidently no one considers it good value for money to extend all six platforms.

Same goes for the 8-car platforms at the likes of Potters Bar, Hatfield, Welwyn GC, Welwyn North and Knebworth I suppose, although a couple of these would be quite expensive to do for various reasons.

Much of GN's capacity issue could simply have been resolved by running as many 12-car trains as possible along with extending the suburban platforms at King's Cross. At least this would avoid the chronic unreliability associated with Thameslink.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Much of GN's capacity issue could simply have been resolved by running as many 12-car trains as possible along with extending the suburban platforms at King's Cross. At least this would avoid the chronic unreliability associated with Thameslink.

"Lengthening the Suburban Platforms" as a concept was killed off by the redevelopment of Kings Cross; there's no space to extend towards the tunnels.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,896
Location
UK
Same goes for the 8-car platforms at the likes of Potters Bar, Hatfield, Welwyn GC, Welwyn North and Knebworth I suppose, although a couple of these would be quite expensive to do for various reasons.

There's going to be quite a bit of money spent on some of the above stations for various things, but platform lengthening isn't part of the work.

I suppose a much cheaper way to improve capacity is to run more 8 car services off peak and weekends, and on Sunday to run 2tph instead of 1.
 
Status
Not open for further replies.

Top