Over running engineering works in trent valley

Status
Not open for further replies.

MKB

Member
Joined
15 Oct 2008
Messages
666
Really?! You're seriously trying to pull a 'Citation needed' on weekdays being busier than weekends?

Yes, because, as I said, it doesn't accord with what I see myself on this line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MKB

Member
Joined
15 Oct 2008
Messages
666
WCML has longer two track blocks over weekends and the schedule 4 compensation would be much higher during the week. Watford was originally going to be a week until the compensation worked out at an eye watering amount.

So the reason it can't happen is because the government has mandated a higher level of compensation for TOCs in the week? Surely that needs to change then in future franchise agreements?
 

MKB

Member
Joined
15 Oct 2008
Messages
666
So the weekday morning and evening peaks don't exist?

Certainly in the morning, "peak" means peak fare and not peak volume. I've been surprised at how light some of the "peak" services have been when I travel then.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
Regarding the possibility of big and extended closures, I recall that the route between Stoke-on-Trent and Stockport via Macclesfield was closed for 17 weeks during the summer of 2003 for engineering works.

I believe that this plan of works also dovetailed neatly onto the very minor electrification project between Kidsgrove and Crewe via Alsager, so as to allow electric trains to be diverted.

Have any line closures for engineering works during the summer similar to the 2003 one been considered any further? In my own view, this would allow quite a lot of work to be done.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,721
Location
Scotland
Certainly in the morning, "peak" means peak fare and not peak volume. I've been surprised at how light some of the "peak" services have been when I travel then.
Maybe where you are. I've been on many services that were well past full and standing.
 

MKB

Member
Joined
15 Oct 2008
Messages
666
Maybe where you are. I've been on many services that were well past full and standing.

As have I, but on Saturdays and Sundays. Maybe I'm just lucky, but I rarely encounter it on weekdays. Most of my experience is on the Liverpool, Manchester and Coventry routes to/from Euston.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,721
So the reason it can't happen is because the government has mandated a higher level of compensation for TOCs in the week? Surely that needs to change then in future franchise agreements?

No, it is because on the WCML we have agreed 2 track timetables for longer on the weekend than mid week therefore we get more "free" time.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,489
Location
Powys
As have I, but on Saturdays and Sundays. Maybe I'm just lucky, but I rarely encounter it on weekdays. Most of my experience is on the Liverpool, Manchester and Coventry routes to/from Euston.

I regularly use the Birmingham trains from Euston, on various days, and I have always found that the trains after 1600 on a Friday are much busier than the equivalent trains on other days.
 

bnsf734

Member
Joined
15 Oct 2007
Messages
649
Location
Nuneaton
Are the Fast lines still closed today (29/12)?

I travelled from Nuneaton to Liverpool today and the fast lines were still out of use tonight when I returned.

Interestingly this morning we left on the 08:15 London Midland stopper from platform 3 at Nuneaton whilst a Virgin pendelino went past on platform 2. Once clear we left and crossed over. As we approached the bridge a southbound class 66 hauled container train went past us on the down fast line. So I have now seen the reversible signalling in action.

I am not sure why the fast lines are still out? Any ideas anybody.
 

tcm1106

Member
Joined
4 Jan 2010
Messages
286
Location
UK
We had two bridge replacements between Rugby and Nuneaton on the LEC2.
The one near Hartshill which was done using SPMTs. The second was bridge 9 over the Oxford Canal near Cathiron Lane, Rugby, which was done with road cranes. This was the job affected by sustained high wind speeds.
The overrun was caused primarily by the programme slipping due to the postponed lifts and the effect that this had on subsequent tamping shifts.
 

bnsf734

Member
Joined
15 Oct 2007
Messages
649
Location
Nuneaton
Thank you for the extra information. I wasn't aware of the other job and things make sense now.

A quick look on Realtimetrains shows trains losing time around Nuneaton so are the fast lines still out?
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Have any line closures for engineering works during the summer similar to the 2003 one been considered any further? In my own view, this would allow quite a lot of work to be done.

The considerable blockades at Lincoln, Nottingham and Wigan were all done over the summer months.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,721
Location
Scotland
The considerable blockades at Lincoln, Nottingham and Wigan were all done over the summer months.
A bit further north - Winchburgh Tunnel and Queen Street remodelling were extended projects which require complete blocks - both done in the 'light half' of the year.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,721
Unless it has changed recently it clashes with an Oxford block and XC are disputing them.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
If it can ever get over the final hurdle, Derby will be a large blockade too.

Unless it has changed recently it clashes with an Oxford block and XC are disputing them.

Derby as a Blockade seems sensible as there are alternative 'local' routes avoiding Derby, the main issue being Etches Park.

Oxford must be more difficult as it will almost certainly require the WCML to be open for freight traffic running between Reading and the Northwest diverting via GWML and WCML. I guess XC think they cannot resource the two blocks at the same time with either sufficient buses or trains.

Blocks between Glasgow and Edinburgh I would suggest are easier as there are alternative routes that can be used by through passengers with only local flows affected.
 

MichaelAMW

Member
Joined
18 Jun 2010
Messages
1,021
A Derby block doesn't stop XC as they can go Stenson - Sheet Stores - Trent East - Toton - Clay Cross. More time, obviously, but otherwise OK. Maybe route knowledge is the problem. If there's a capacity issue with that it would be at Trent East, I would imagine, particularly with all the crossovers being 30 mph. On the other hand, they divert via Leicester on Sunday sometimes, so that's another option, again with a substantial time penalty.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,721
Doesn't stop them no, but it means two sets of buses for Derby passengers if Oxford is blocked too.
 

ScouserGirl

Member
Joined
28 Dec 2015
Messages
219
Just the usual incomptent forward planning.

No doubt I will get marooned at Lancaster for over an hour later this morning. I only get up to see relations for the day once or twice a year, and every time the railway mucks it up.

Then why don't you find an alternative way to travel if the railway always kicks up your travel plans
 

itsonlyme

Member
Joined
24 Jul 2012
Messages
105
ScouserGirl

As I said earlier "First as a pensioner who now longer drives, and lives in a town, Crewe, with no north bound coach services it's either use the train or don't travel. The only realistic alternative rail route is via Manchester where you are also dammed with engineering work."
 

ScouserGirl

Member
Joined
28 Dec 2015
Messages
219
ScouserGirl

As I said earlier "First as a pensioner who now longer drives, and lives in a town, Crewe, with no north bound coach services it's either use the train or don't travel. The only realistic alternative rail route is via Manchester where you are also dammed with engineering work."

Then plan traveling around
the works instead of traveling when they happen when you know there will be disruption..
 

itsonlyme

Member
Joined
24 Jul 2012
Messages
105
So I should plan to travel on a Sunday!, or travel in the working week when the people I want to see are at work.

They day I travelled would have had no disruption if the works had finished to time.

.........Back to my original grumble
 