All trains going via west Midlands this morning

Only going to Coventry myself so should be ok.

0800 Manchester is combined with 0803 Birmingham

0703 and 0723 cancelled

Trying the 0743 ......
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bnsf734

Member
Joined
15 Oct 2007
Messages
648
Location
Nuneaton
They have been replacing an underbridge at Hartshill, just north of Nuneaton. Work started at close of service on Chrstmas Eve and has been ongoing since. According to the London Midland website disruption is expected until 1200. Buses are replacing trains between Rugby and Stafford.
 
Last edited:

itsonlyme

Member
Joined
24 Jul 2012
Messages
105
Just the usual incomptent forward planning.

No doubt I will get marooned at Lancaster for over an hour later this morning. I only get up to see relations for the day once or twice a year, and every time the railway mucks it up.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,689
Location
Scotland
No doubt I will get marooned at Lancaster for over an hour later this morning. I only get up to see relations for the day once or twice a year, and every time the railway mucks it up.
Just the usual incomptent forward planning. :roll:
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,922
Location
Mold, Clwyd
They have been replacing an underbridge at Hartshill, just north of Nuneaton. Work started at close of service on Chrstmas Eve and has been ongoing since. According to the London Midland website disruption is expected until 1200. Buses are replacing trains between Rugby and Stafford.

This after "breaking the record" for track relaying in the Trent Valley over Christmas (2146 yards in a day).
https://pbs.twimg.com/media/C0izjmgXgAANWpd.jpg:large
(From NR BHM twitter feed).

I can see some trains are doing the Grand Junction diversion losing only 27 minutes en route, so not too bad (unless you live in the Trent Valley).
 

HLE

Established Member
Joined
27 Dec 2013
Messages
1,421
Opposite end of Nuneaton where the track laying record was set, that looked to be south of Attleborough on the bend before Bulkington.

The issue what's causing it, is what's mentioned above - the overbridge in Hartshill which is outside Nuneaton, about 5/10 miles from where the new track was laid.
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,103
Location
Near where the 3 ridings meet
Just the usual incomptent forward planning. :roll:

Have they given a reason for the delay?
There are many factors that could cause an overun, not all come under the control of those involved in the work.

The only guaranteed way of not creating a potential delay is not to do the work but that would create problems at a later date.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,689
Location
Scotland
Have they given a reason for the delay?
There are many factors that could cause an overun, not all come under the control of those involved in the work.

The only guaranteed way of not creating a potential delay is not to do the work but that would create problems at a later date.
I agree totally. My comment was aimed at itsonlyme who says that the railway always lets him down at this time of year, yet continues to attempt to travel by train rather than make alternative arrangements.
 
Last edited:

dviner

Member
Joined
7 Oct 2010
Messages
246
Just the usual incompetent forward planning.

Would you care to expand on that? You make it sound like you're "in the know", so I'm sure that the wider audience will be interested in what went wrong.
 

broadgage

Member
Joined
11 Aug 2012
Messages
1,094
Location
Somerset
High winds seems a probable reason for delay if the work involved lifting bridge sections by crane.
Anyone know if this was the case ?
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,203
They have been replacing an underbridge at Hartshill, just north of Nuneaton. Work started at close of service on Chrstmas Eve and has been ongoing since. According to the London Midland website disruption is expected until 1200. Buses are replacing trains between Rugby and Stafford.

Do we know for certain it is the Hartshill bridge that is the issue?
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
Just the usual incomptent forward planning.

No doubt I will get marooned at Lancaster for over an hour later this morning. I only get up to see relations for the day once or twice a year, and every time the railway mucks it up.

Gosh!
You must be such an expert since there are no details quoted as to why this has happened!!
:roll::roll:
Still, any excuse to blame the railway.
 

OwlMan

Established Member
Joined
25 Jun 2008
Messages
3,206
Do we know for certain it is the Hartshill bridge that is the issue?
yes see http://www.coventrytelegraph.net/news/local-news/trains-cancelled-after-engineering-works-12377251

............Overunning engineering works in Nuneaton have caused delays for train passengers across the country today.
Trains have been cancelled after bad weather yesterday stopped engineers being able to finish work at a railway bridge on time.
Engineers have been working to completely replace the low bridge in Woodford Lane, Mancetter , which has been damaged after being hit by several lorries in recent weeks..................
 

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,398
Location
Dover
On the 1246 Euston to Crewe which as we passing Wembley was announced to be terminating at Rugby. Now at Milton Keynes where we've been waiting 20 minutes.
 

roversfan2001

Established Member
Joined
19 Feb 2016
Messages
1,666
Location
Lancashire
Will this run over to tomorrow morning? I'm travelling down to Euston on the 0823 CRE-EUS (0747 from LIV) and could do with it being on time.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,689
Location
Scotland
Will this run over to tomorrow morning? I'm travelling down to Euston on the 0823 CRE-EUS (0747 from LIV) and could do with it being on time.
While crystal balls are in short supply, the weather in the area doesn't look bad at all so I'd be surprised if they don't get things finished today.

Edit: Looks like they're done. :)
 

roversfan2001

Established Member
Joined
19 Feb 2016
Messages
1,666
Location
Lancashire
While crystal balls are in short supply, the weather in the area doesn't look bad at all so I'd be surprised if they don't get things finished today.

I've just read the Virgin website and that says all lines are now open again so hopefully that's the answer to my question sorted. :)
 

roversfan2001

Established Member
Joined
19 Feb 2016
Messages
1,666
Location
Lancashire
One thing that happens every time things like this happen is that the sheer stupidity of the general public comes out on Twitter. Obviously they won't know as much as people on this forum but when someone thinks Manchester to London is run by a company with East Coast in their name I can't help but despair.

Anyway, that's slightly off topic. Glad to see the Network Rail team have rectified the overrun problem swiftly. :)

Sent from my HTC Desire 530 using Tapatalk
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,689
Location
Scotland
Obviously they won't know as much as people on this forum but when someone thinks Manchester to London is run by a company with East Coast in their name I can't help but despair.
To defend the 'normals', Virgin have made a point of using common 'Virgin Trains' branding for both the east and west coast operations.
 

roversfan2001

Established Member
Joined
19 Feb 2016
Messages
1,666
Location
Lancashire
To defend the 'normals', Virgin have made a point of using common 'Virgin Trains' branding for both the east and west coast operations.
They also make the separate Twitter accounts clearly separate in name. One thing they could do is add 'West Coast' or 'WC' in the name. It's easy to get confused for the Scotland to London services if you don't look at calling points etc. but Manchester?

Sent from my HTC Desire 530 using Tapatalk
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,334
Location
Reading
They also make the separate Twitter accounts clearly separate in name. One thing they could do is add 'West Coast' or 'WC' in the name. It's easy to get confused for the Scotland to London services if you don't look at calling points etc. but Manchester?

Sent from my HTC Desire 530 using Tapatalk

One has to ask oneself 'How did people manage when everything was BR?'

Maybe 'social media' has made people stupid?
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,331
Location
Herts
Obviously the diversions via Coventry - Stechford - Soho - Wolverhampton would at least keep the longer distance services going with delays and extended journeys.

A now retired workmate told me with horror of a desperate winter possession when bridge D40 on what was then LT which carries the District and Piccadilly lines over the WR main line was planned to be replaced - it all went horribly wrong as once the old bridge went out the new one took longer than planned to go back in - and about 3 train loads of critically needed ballast froze into the wagons and had to be taken out by the shovel full involving much bad language.

Of course - who remembers Rugby a few years ago......?
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
I can remember Rugby being leading story on BBC News on the day it happened and remaining in bulletins for a few days thereafter. Not the best advertisement for Network Rail was that one.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,203
Have network rail resintated the 2 slow lines first?

Might it not have been better to have reinstated one slow and one fast given the bidirectional facility on the fast lines?
 