Do we know what services will be restored then? Or is this with Southern (lack of train crew means they cannot use it?!)Indeed, 50 days to go.
Do we know what services will be restored then? Or is this with Southern (lack of train crew means they cannot use it?!)Indeed, 50 days to go.
Hmm surely there is more capacity though? Or are they just playing it safe with same number of trains?Almost all Southern / Thameslink services leaving London Bridge heading towards New Cross Gate after Dec 27th will use it.
The timetable appears to be the same though.
Hmm surely there is more capacity though? Or are they just playing it safe with same number of trains?
Tbh generally this year it has been okay in the area of London bridge (compared to last year), although we have had reduced service anyway and generally a few trains cancelled in the peak anyway which I guess helped with the congestion.
I would say personally May 2015 timetable but I guess you have the numbers.It's been ok at London Bridge (on the 'Central' side) in terms of operation since February 2015.
Yes, there is more capacity on the approaches to London Bridge.
Indeed, 50 days to go.
Was just hoping it would be earlier as iam impatient! No word on what southern/thameslink drivers are going to get in terms of a briefing. Its one of those where there is not enough to give a driver a days course and its possibly too much to just put on a paper brief!
I think the signallers on the London Bridge link, the signallers in the neighbouring boxes, the drivers and most of all the poor suffering travelling public are all looking forward to that line opening.
£5 says there'll be a signalling problem in the first 48 hours.
Almost all Southern / Thameslink services leaving London Bridge heading towards New Cross Gate after Dec 27th will use it.
The timetable appears to be the same though.
At present no Southern driver signs it
So after the 27th it will only be open to the Southern Slow and Thameslink\Southern fast lines and not South Eastern right?
So after the 27th it will only be open to the Southern Slow and Thameslink\Southern fast lines and not South Eastern right? Trains on the southeastrn line to Charing Cross seem to be annoyingly crawling into London Bridge recently which is a pain when you're standing on a full non airconditioned train.
Oh OK. Thanks for the info. So does this mean that potentially there could be Thameslink trains running on the South Eastern route to Dartford, Sidcup, Orpington etc? Or is there not enough capacity to do so?
I guess it all depends on how things go with the potential franchise takeover by TFL and whether or not they will allow sharing on those routes if they do takeover southeastern routes as suggested.
Yeh i think it will make a huge improvement. Up trains using the 50mph (*40mph in places) reversible and down trains using the 50mph Down slow.... no conflicts with the lines to/from South Bermondsey either.

You shouldn't have 2 trains booked to leave London Bridge at the same time, and then follow the same path. It's impossible. They are normally booked a few minutes apart for a reason, or one gets waiting time somewhere. But that's ridiculous.
As far as I'm aware no line names are changing from what they currently are
I'll be suprised if trains will use the Sussex rev in the up direction
(They currently don't, but of course the layout is different now!)
I wasn't suggesting two trains booked at the same time to depart but it is currently possible for two to depart simultaneously if one is running late....one is then held for the other further down, sometimes just prior to Bricklayers Arms, to let the other past.
My question is under the new set up, would it be possible to still have two simultaneous departures and either hold the second train further down on 8/9 awaiting a path onto the Down Sussex Slow (via dive under) OR will signallers still have the option to send a second down train via the Sussex Reversible and onto the Down Sussex Fast? (e.g. hypothetically - sending a Caterham stopper via the DSS dive under and a Brighton/Horsham via the Sussex Reversible).
Which suggests it will still be possible to send a second down train onto the Down Sussex Fast via the existing Sussex Reversible route?
Yes X 3
I wasn't suggesting two trains booked at the same time to depart but it is currently possible for two to depart simultaneously if one is running late....one is then held for the other further down, sometimes just prior to Bricklayers Arms, to let the other past.
My question is under the new set up, would it be possible to still have two simultaneous departures and either hold the second train further down on 8/9 awaiting a path onto the Down Sussex Slow (via dive under) OR will signallers still have the option to send a second down train via the Sussex Reversible and onto the Down Sussex Fast? (e.g. hypothetically - sending a Caterham stopper via the DSS dive under and a Brighton/Horsham via the Sussex Reversible).
Which suggests it will still be possible to send a second down train onto the Down Sussex Fast via the existing Sussex Reversible route?
Is that a typo on your part? Up trains use the Sussex Reversible every day...
The only time 2 trains leaving together (+/-1min) should really happen is in exactly the same circumstances as it happened (and was timetabled) before the rebuild started:
1 train goes via South Bermondsey the other via New Cross Gate.
Longer term (post 2018) P14/15 effectively go over to via South Bermondsey use and P10-13 to via New Cross Gate use and with the approaches to 10-13 as they will be you will stop lots of Up trains approaching and entering the station by departing 2 from 10-13 at the same time which really kills overall station capacity so it probably won't ever happen unless things have gone very wrong but it is still better to get everything out on the Down Sussex Slow if heading to New Cross Gate especially from Jan 18. Just because you can do something doesn't mean it is sensible!
(Is line 10 bi-di between Abbey Street and Spa Road? If it is up only then no chance at all of 2 leaving from 10-13 at the same time.)
Interesting thread.
I've read through and looked at the new diagrams. I think I've got my brain around it. I've concluded the following, but would be grateful if previous posters could correct me if I've erred in my understanding:
- All trains (slow and fast? ) leaving London Bridge Low Level (i.e. Southern) in the Down direction will be routed onto what is currently 8 Down/9 Reversible...which with main aspect only on TL4013 at Spa Road will become the Down Sussex Slow and use the dive under to connect at Bricklayers Arms Junction ?
- Currently if two trains leave simultaneously in the down direction, one invariably gets held either on the Sussex Reversible or the Bermondsey Reversible just before Bricklayers Arms junction to let the other past. If all Down trains are now to be routed onto the new Down Sussex Slow dive under, how does this affect simultaneous departures from London Bridge? Will there still be the option to send a 2nd Down train via the Sussex/Bermondsey Reversible, or will 2nd departure be held further back on 8/9 awaiting to join the DSS dive under? I hope that makes sense!
- Southern trains on the Up Sussex Fast after New Cross Gate will be routed onto what is currently the Sussex Reversible? (to be renamed?)
- Southern trains on the Up Sussex Slow after New Cross Gate will be routed either via the Bermondsey Reversible or the Up Bermondsey Spur?
- Or will all slow/fast Up trains use a combination of the Sussex/Bermondsey Reversible depending on what other trains are heading for South Bermondsey at that time?
These are questions, not statements![]()
What is being discussed above seems to be only an interim possibility for just over a year, because once the Thameslink lines are in normal use then it will cause major conflicts to send down trains to the Southern via the current route.
Apologies if most regulars had already sussed this out...
Looking at my diagrams (that could be out of date), once you leave London Bridge platforms 10-15 if you not routed onto line No9 at the staion throat then you have no choice but use the ladder at Brick Layers Arms Jcn against the flow of traffic as I can't find any other points between lines 10 and 9 to get you accross. Thus making line 9/Down Sussex Slow the most important piece of railway infrastructure leaving London Bridege (Sussex Side) once the Thameslink master plan kicks off in December 2018. I would of thought a crossover at Spa Road would of been a good back up (unless there is one which is missing from my diagram).
(Now expecting to get shot down in flames from those in the know lmao)
Yes noted, I wasn't envisaging timetabled everyday occurrences, more like a get of jail card.
After Brunswick Court you can only go left to right (8>9>10>11) in the down direction, not the other way around. So if you're not routed onto 9 Rev at TL4119 on the first gantry out of the station then you can't get there.