Just been reading the latest Roger Ford 'Informed Sources' preview email. One item in there is:
As an engineer, it does seem a slightly odd situation to have ended up in, after 50+ years of 25kV overhead electrification in the UK - any comments from people who understand the technical reasons for this ?
(Please, no 'Brexit' related political comments - there are other threads for that).
Mindless regulation threatens electrification
In 1956, British Railways Chief Electrical Engineer Mr S.B Warder made a bold and far sighted decision. The pre-war Weir committee had recommended 1,500 Volt direct current electrification as the future standard. But with the French pioneering high voltage alternating current electrification for the re-equipment of their war-torn network, BR decided to follow suite for the electrification schemes proposed in the 1955 Modernisation Plan.
But high voltage had a particular drawback for a network built to a smaller loading gauge than continental railways. Electricity has an insatiable desire to return to earth, and the higher the voltage the greater the ability to arc to the nearest earthed object.
To calculate clearances for the 25kV OHL BR took the International Union of Railways standard of 320mm as its starting point and soon discovered that raising bridges to provide this clearance would be prohibitively expensive. Reducing the voltage to 6.25kV where raising a bridge was unaffordable caused the early problems with ac electric trains.
In a series of tests, in conjunction with Her Majestys Chief Inspector Officer of Railways, Brigadier C A Langley, Stanley Warder investigated the possibility of reducing clearances. The final test in Crewe tunnel confirmed that with a 50mm air gap 25kV would not flash over, even when subjected to the full blast from a steam locomotive chimney.
As a result, in August 1962, new reduced standards, were authorised, permitting clearances of 200mm at particularly difficult locations. This cut the cost of clearance works on the London-Liverpool/Manchester project by around 7%,
Two decades later, on the East Coast Main Line electrification, 200mm had become the new Normal minimum clearance with a Reduced minimum of 150mm. Railtracks revised electrification Group Standard published in 2001 increased the Normal minimum to 270mm while retaining the BR clearances as Reduced amd Special Reduced.
Today
Three decades on and clearances are causing major problems. On 21 September this year the Scottish Parliaments Rural Economy & Connectivity Committee took evidence from the ScotRail Alliance. Ahead of the hearing ORR provided the Committee with its latest review of the Scots electrification projects and one of the main reasons for schemes running late and over budget was the late identification of the scope necessary to achieve a safe and sustainable railway through compliance with legal obligations and European standards.
By now I hope you can see the reason for my historical introduction. For compliance scope read electrification clearances. ORR claims that this scope is important as it affects the ability to run a safe and sustainable railway.
As you might imagine, the relevant European Technical Specifications for Interoperability (TSI) have something to say about electrification clearances. Until 2015 the UK had a National exemption from the relevant European Energy (ENE) TSI.
However, when the relevant Network Rail standard (GL/RT1210) was reissued in April 2015 the requirements of the ENE TSI came into force under the UKs interoperability legislation raising the normal minimum clearance to 370mm which is being applied retrospectively to on-going schemes.
This is how ScotRail Alliance Chief Executive Phil Verster explained what happened next to the September 21 hearing.
Network Rail attempted to keep costs down by saying that the new specification is really high and asking whether it could risk assess things in order to get a derogation and therefore not to have to comply. Last year, when all the shenanigans started and the cost issues became really clear, it became obvious to the ScotRail Alliance and to me that if we did not comply with the standards the ORR would not sign off the line to go live: if we had continued to debate the matter, we would have got late into the programme and built the railway only for the ORR to say that we could not run anything on it.
Trapped in a three way bind between the Economic and Safety regulators and Transport Scotland, in March this year Phil instructed the EGIP Project team Stop the debate and move to the new standard. The railway will have hundreds of years of life into the future, so fix this now.
And its not just tunnels and bridges. The distance between any live part of the OHLE or pantograph and any place a person might stand has also been increased from 2.75m to 3.5m (11ft. Having received a policy statement from ORR Ill return to this requirement in a future column.
Risk
So how have we come to the situation where, after more than 50 years since those tests in Crewe, with the progressive reduction in clearances making electrification within our smaller loading gauge affordable, we are now back, not just to the clearances in UIC606 but another 50cm on top?
Why did not Network Rail see it coming and gain derogations to continue with the clearances in GL/RT1210 on the grounds that electrification has an excellent safety record and we dont have the air-space of mainland European Railways? One Informed Source suggested that Network Rail could not mount a challenge because the records justifying historic clearances had disappeared in the sell-off of the British Rail engineering offices under privatisation.
What makes me genuinely angry about this ludicrous situation is that after the struggle to get electrification back on the agenda, and many readers signed up to my petition on the Number 10 website, the pass has been sold.
And that includes ALARP (As Low As Reasonably Practical) seemingly going out of the window. Interestingly, when I started a Twitter debate over the cost of the new clearances, I came under fire on the grounds that I was arguing for the UK to be less safe than Europe, just to make electrification more affordable.
But this assumes that the Government will authorise electrification at any price. Which they wont. And funding for the next Control Period is getting ever tighter.
I would risk a modest bet on Swansea not getting electric trains in Control Period 6 (2019-2024. And given slightly better odds make it a double with Trans-Pennine electrification.
Meanwhile, I would be grateful if any reader can provide a reference for a passenger on a platform being electrocuted by contact or flashover with 25kV ac OHLE or a pantograph.
As an engineer, it does seem a slightly odd situation to have ended up in, after 50+ years of 25kV overhead electrification in the UK - any comments from people who understand the technical reasons for this ?
(Please, no 'Brexit' related political comments - there are other threads for that).