Whistler40145
Established Member
You could run two sets of 185s to Skipton and split, one going forward to Glasgow and the other going to Morecambe and Lancaster.
If the 185s are overpowered for most routes.
Where suggestion had been made in past times for reducing a Class 185 unit to two coaches, surely one of those coaches would still have most of its capacity taken up by the first class section.
Where suggestion had been made in past times for reducing a Class 185 unit to two coaches, surely one of those coaches would still have most of its capacity taken up by the first class section.
Seats and partitions can be swapped easily, it'd take maybe a day per unit.
At which depot are all these replacement seat units and partitions stored and how many of them are there.
Have any similar seat unit and partition replacements as that proposed taken place in recent times and if so, when? Is it certain that the task could be carried out in a period of 24 hours?
I'm sure a place will be found for them, which will then start a cascade. I do like the idea of using them for improving the quality of Welsh express services, allowing a cascade which would kick out Class 150s to be used for other purposes or even scrapped - the quality is certainly up to it. With 2 x 3-car you could even do something radical like increasing services by way of portion working - for instance something like hourly Manchester Airport to Llandudno *and* Holyhead, and the same to/from Cardiff, or even reinstating through working to Birmingham via the WCML.
Their being overpowered is not a major issue which has already been solved in software. If two engines are too much, just modify the software to turn off two at a time in rotation instead of one.
Of course the other option is they stay with TPE and perhaps before long we'll have a half hourly South TPE service which will utilise some. They may even be needed on the North East TPE routes if the 5-car trains prove to be too short during the peak hours, in a similar way that they're still working to Scotland at the weekend currently.
I'm sure many have; many units have had seats replaced. But in any case it was a figure of speech; if it took 2 days per unit it'd still be feasible. The point was that it is not a major rebuild job as the seats are on tracks.
The big question is - not where they could go - but who can afford them ?
Almost anyone as once they are off lease the ROSCO lease cost will drop like a stone until they are leased out again as having 22 units sat in warm storage is not a good business model
Why not? Porterbrook has already pulled publicity stunts scrapping mk3's with a hire-'em-or-lose-'em attitude....
... or even converting them to bi-mode.
Nobody will be scrapping 10 year old DMUs. If the 185s need modifications to fit a new role, they will be modified - significant rebuild projects like the SWT Junipers really are not out of the question - that could include reforming, adding gangways etc, and could involve removing engines, changing engines etc or even converting them to bi-mode. They have another 20 years at least of service in them, if not more.
The second lesson is that the largely single-track railway has been predictably plagued by unreliability due to inadequate infrastructure and the poorly-performing Class 158 trains. The proportion of right-time arrivals at Tweedbank has never reached 70 per cent across any one week since late last October, and across August, right-time trains at Edinburgh Waverley dropped to an average of below 30 per cent (as did Tweedbank arrivals).
Would they be any good on the Borders line?
An article in "The Scotsman" today notes that the 158s are performing badly on the route with "right time" arrivals dropping as low as 30% for Waverley arrivals in August.
http://www.scotsman.com/news/opinio...ges-to-derail-borders-success-story-1-4221851
I think its the grunt and reliability rather than acceleration angle being suggested there.
Being a new line there shouldnt be any weak structures right?