I'm surprised there isn't a case for them to be reformed into 4-car and 2-car subfleets??
The big concern is peak hour capacity, however there a number of off peak services/diagrams that could be run with 185's. However the problem is that there wouldn't be enough work for all 22 units.
However I do agree that by releasing 159's for use elsewhere would be good, as there's many more places that they would be useful.
Even if they had been 4 car sets they would've had a better chance of finding somewhere or proposing a more logical idea easier. It blows me away that someone thought that 280 odd seats on a commuter journey through one of England's busiest route (let alone the North), which was probably operated by 4 or 5 Mk(X) coaches before hand.
I would second that would make the climb over Copy Pit and out of Leeds a bit quicker, indeed this is a true Trans Pennine route
Although, as has already been posted, Blackpool-York is getting new rolling stock.
However the Manchester-Todmorden-Burnley-Blackburn service isn't and it crosses the Pennine watershed twice on its way from Manchester to East Lancs via Yorkshire!
I'm not sure that the state of the Copy Pit line and its susceptibility to subsidence would cope with the weight of the 185s though.
This is why I suggested running them around as 6 cars with ASDO, put a couple on Weymouth as single sets too and that's a huge capacity boost on the Pompey Cardiff through Bristol where it's needed as well as on the hampshire end, massively reduces dwell times and then much desired 1589**s become available as is or as 2 coach units.
If you reformed a 185 wouldn't it affect toilet facilities? I'd assume the universal coach is in the centre car?
Nottingham-Leeds-Settle-Carlisle-Glasgow for me 2 x 3-car formations. Tough gradients on S&C, units have first class. Go for it!
Ignoring whether that's mechanically possible, if you were to refit them with an all standard class interior you wouldn't get more than 120 seats on a 2 car set, while you'd get around 270 seats on a 4 car set. Where would you use 2 car trains with 120 seats, noting that's a reduction in seating capacity over a 2 car 156, 158 or 175?
I would suggest that somewhere that during the peaks had demand for about 200 seats in a few peak services but required about 100 most of the rest of the time.
Just because a single unit doesn't provide the required capacity, it doesn't mean that a pair of 2 coach units wouldn't be suitable. The main reason it doesn't happen much now is that there is a shortage of DMU's. If the 185's are going spare with little need for them, then they may get used differently from the norm now.
But are there enough services for it to be a good idea to reform 185s given how many 2 car 170s are already available?
I would like to ask a question from an engineering point of view... How hard would it be for part of a 185 coach to be converted to a mini food bar?
Because their capacity isn't small enough already?![]()
I would like to ask a question from an engineering point of view... How hard would it be for part of a 185 coach to be converted to a mini food bar?
Given that the most 2 car versions that would be created (assuming 4 car versions are the cause of the shorter version) is 11. As such it is hardly great numbers, and it could well be that the TOC that takes them on doesn't have 170's (although there are only a few TOC's for whom that would apply).
It would be a trade off for the ROSCO and the TOC to make.
It could even be that the two coach units sure sit idle, add it is better to lease 11 x 4 coach units rather than not lease any.
But then it's likely another batch of 185s will be released once Hull is wired and logically the second batch will go to the same TOC as the first.
But then it's likely another batch of 185s will be released once Hull is wired and logically the second batch will go to the same TOC as the first.
I would like to ask a question from an engineering point of view... How hard would it be for part of a 185 coach to be converted to a mini food bar?
In seriousness, when the other part of the class become available
I'd throw my hat in the Northern ring too. Middlesbrough - Carlisle is one obvious option, but aren't Northrn also going to be operating Leeds - Scarborough at some point? And as 185s run up and down there now that would be a second option for them too. And what about the S&C, are there many MU differentials on that line? Could 185s operate within 158 timings there too, if so the S&C would be another option.
I'm not sure that there has ever been a reduction in seats per hour over the pennines since BR removed the Griddle Car from the original Trans-Pennine sets. Currently there are 15 cars per hour in each direction between Leeds and Manchester and that goes up to 21 at one point during the evening peak.
--- old post above --- --- new post below ---
Another point on this. The 1tph LHCS was replaced initially by 2tph Sprinters - but only as an interim until 158s were available. This was never a response to declining patronage - but an initiative to reduce costs and increase patronage. 158s were always crossing the pennines better than hourly.
I seriously can't believe no one has considered them on the great western/former Wessex area, especially with ASDO beacons. There is lots of suitable routes for them with some reasonable gradients. They could displace the 158s up north where they'd be suited.
I'm surprised there isn't a case for them to be reformed into 4-car and 2-car subfleets??
Ignoring whether that's mechanically possible, if you were to refit them with an all standard class interior you wouldn't get more than 120 seats on a 2 car set, while you'd get around 270 seats on a 4 car set. Where would you use 2 car trains with 120 seats, noting that's a reduction in seating capacity over a 2 car 156, 158 or 175?
the Manchester-Todmorden-Burnley-Blackburn service isn't and it crosses the Pennine watershed twice on its way from Manchester to East Lancs via Yorkshire!
Skipton-Colne
Nottingham-Leeds-Settle-Carlisle-Glasgow
D-stock
We don't know if the entire 185 fleet will ever be released from TPE. There are no plans to electrify the entire South TPE route and unlike North TPE there won't be any benefit from introducing new 125mph stock.

I only need "442s" and I've got Forum Bingo![]()

The south TPE route will receive the class 68 hauled sets when the north route is fully electrified. Should be about 2025ish if we're lucky![]()
No, you're still missing Okehampton...
![]()
![]()
![]()
I only need "442s" and I've got Forum Bingo![]()

The S&C would suit them - the problem is that there's just not enough DMUs required for the current bi-hourly timetable for them to make much of a dint in the stockpile of 185s.
If you are going to have 185s at Leeds to form services to Blackpool and to Manchester Victoria via the Calder Valley then a handful more would be great for the S&C, but it's never going to be busy enough to require more than a handful of DMUs on its own
I don't know how you are defining the watershed, but I wonder whether the "South TPE" line through the Hope Valley doesn't actually cross the Pennines?
The Pennine Way starts/ends north of the line at Edale Station, so does South TPE actually cross the Pennines?