Whistler40145
Established Member
Would they not be more suitable e.g Waterloo to Exeter St David's or Cardiff/Bristol to Portsmouth Harbour/Brighton services?
Sent from my SM-G920F using Tapatalk
Sent from my SM-G920F using Tapatalk
Would they not be more suitable e.g Waterloo to Exeter St David's or Cardiff/Bristol to Portsmouth Harbour/Brighton services?
Sent from my SM-G920F using Tapatalk
Plus, the air con does actually function on the 185s (most of the time!)
Just because the ITT for the new SWT franchise say it can use 185's in its bid does not mean either bidder will !!!!!!!!!!!!!!!
The ITT for the TPX franchise said it could use loco hauled 442's and the winning bidder chose new build.
Take the recent award in Anglia into account, that new build is the way to go.
As the SWT franchise is a two horse race, the winning will obviously be the one that outbids the other, I doubt any Northern England cast off's will be included in either bid.
If I was bidding ALL the 455's AND 456's would go AND would use BI MODE for Waterloo to Exeter ect, something along the lines of a Stadler Flirt or similar.
Depending on what it would do to the acceleration curve and top speed, it could be possible to build two new coaches to insert into the 185's, both with electric motors and one with a paragraph well. In that way you could create a bimodal unit. It would be able to run at 100 mph on this rail (with future provision for running off of OHLE) although with the weight of the original coaches it may not be quite as nippy as a straight EMU, but then the diesel engines could give a little push when starting off. It could probably be able to keep up with the 159's beyond Basingstoke when running on its engines.
Outside of Northern / TPE the most likely will probably be SWT, AGA or Scotrail as all three have experience with electric Desiros
If the 185s are to remain based in Manchester, could Arriva Trains Wales take some under their wing and use them on Manchester Piccadilly to Cardiff and Manchester Piccadilly to North Wales Coast services?
If the 185s are to remain based in Manchester, could Arriva Trains Wales take some under their wing and use them on Manchester Piccadilly to Cardiff and Manchester Piccadilly to North Wales Coast services?
Sent from my SM-G920F using Tapatalk


No, this is a silly idea, Siemens have moved on with their Desiro product and are very unlikely to want to build a small order of specialist carriages that are compatible with a product that is currently 10 years old and a design that's at least 15 years old. Not only that, transforming them into bi-modes is a technical challenge that is simply not going to happen. The 185s will definitely remain as DMUs, they are also very likely to be linked to the current depot in Manchester, which means either remaining with TPE (unlikely), transferring to Northern (more likely), or North Wales (possible ), or EMT (perhaps a slightly better option than Northern) or VECT to help release some Voyagers (unlikely) or XC to help release some Voyagers (unlikely). Moving them anywhere else means a new or modernised facility will be required for a small fleet, new maintenance staff and starting fresh with train crew on a small fleet, all barriers that are reduced by keeping the fleet based in Manchester.
Any idea when these units will be free?
Just so we don't run around in circles here, just to clarify where we've discussed as far as TOCs are concerned:
Transpennine Express
Northern
South West Trains
East Midlands Trains
Greater Anglia
Great Western Railway
Arriva Trains Wales
Scotrail
Cross Country
Note: I have a feeling I'll regret posting this "attempted" check list of discussed proposals, but hey-ho, there's always the 'edit' tool.![]()
Of the three (Wales, Scotland or Cross Country), as I suggested recently, if they can be cleared for 110mph running then XC could provide them with some additional capacity prior to the 222's becoming available. Potentially on routes (Manchester to Bristol and extensions) where not running at 125mph probably would not have too much of an impact.
Assuming XC has at least one spare HST whilst the others work, then 9 (with one spare) would be enough to do a straight replace the HST's, although with only 60% of the capacity. However, all 21 (with 3 spares) would be enough to release 9 22x's. That would be enough to replace HST's with pairs of 22x's with one unit spare.
If XC were to run some of the outer end of the doubled up services (185's or 22x's) as single units, then there could be capacity to strengthen some other services (especially through the core). That would enable the HST's to be withdrawn from service before the 2020 deadline whilst giving some capacity enhancements earlier than waiting for the 222's which may not be available until circa 2023.
Where's XC's current main maintenance depot?
Central Rivers near Burton-on-Trent, but that is run by Bombardier and only deals with classes 220-222.
Where's XC's current main maintenance depot?
Not 222s, surely ? Voyagers only, 222s are known as Meridians.
I don't see the greatest of cases for XC to have 185s replace the Voyagers or HSTs (even the 170s) apart from maintenance wise. Just come to my mind, if the Wales & Borders franchise was stripped of it's Manchester to Wales service then maybe the 185s could fill that missing gap under XC, in turn replacing the 170s to be used on Stansted Airport services and the majority of Nottingham to Cardiff services. Works out maintenance wise and fits in with other proposals to cut Manchester from Wales & Borders.
Apart from that, I can't really see how 185s at XC would work otherwise - not in a stock replacement situation anyway.
A pair of 185's, although would require more staff, would have 338 seats (308 standard and 30 first class) compared with 200 (174 standard and 26 first class) in the 220's and 250 (174 standard and 26 first class) in the 221's.
By my maths, there's about 8 diagrams which currently run Manchester to Bristol with a few extensions to Exeter, Cardiff and Paignton. To run that you would need 16 of the 21 units, with 2 of the remaining 5 needed as spare units. That leaves you with 3 units, which would be enough to more (about 2 a day with 2x185's or 4 a day as a single 185) services to Paignton.
In doing so that provides extra capacity between Paignton and Bristol in the form of new services and extra capacity between Bristol and Manchester through more seats.
That leaves 8 x 22x's which you can either use as a direct replacement for the HST's (bearing in mind that at least 1 would likely be spare anyway) by running them as pairs.
Alternatively, the released 22x's could be used to strengthen services. For instance, if you release 220's you could then use them to run as a second unit on all the services between Reading and York or all of the services between Derby/Banbury and Derby/Cheltenham.
In reality, it is likely that it would be combination of the two. Of course there could be a real step change in capacity if a few of the ICWC 221's were also to become available as well.
Ah I see the logic now. I'm trying hard not to balance logic over personal wishes lol. As much as I dislike the Voyagers I do find them more comfortable than the 185s, and I prefer the 'express layout' as well. I just can't imagine a pair of 185s in XC livery working 4hour+ journeys (albeit practically 2 point to point journeys running conjoining from a commuter point of view), and the HSTs being replaced by the displaced Voyagers!
Also, with the route between Manchester and Birmingham New Street peaking at 125mph, how does this work journey time wise? Do Voyagers normally operate at the speed limit or 110mph due to the TASS being disabled on XC units? The 185s aren't capable of more than 100mph ( a case re-gearing for 110 maybe?) so would how would Speed-Acceleration balance up along the route in a case of Voyager vs 185?
Knowing how TOCs go about business now a days I wouldn't be surprised if the XC argument for 185s was killed stone dead through the "although would require more staff" statement - probably best to not provoke anyone on this matter *Cough* - DOO - *Cough*
If Liverpool to Norwich wasn't under EMT and was with XC then both Liverpool to Norwich and Birmingham to Stansted Airport could go over to 185s, thus making 170s available for extra services or provide double units on Nottingham to Cardiff services.