MatthewRead
On Moderation
Not anymore they aren't!South Eastern may get more than just a few.....
Not anymore they aren't!South Eastern may get more than just a few.....
This may be an incredibly naive and stupid thing to ask, but has the scrap metal from any trains been used to create new ones? I know there are lots of jokes on the forum about turning old trains into things like Coke cans, but, providing there isn't too much corrosion or rust on the bodies, could metal and/or parts from units such as the 319s be re-cycled to make new trains?
plenty of copper in them motors, ma sets, and of course the wiring, the plastic can be recycled, i would say that 100% of a unit can be recycled..
in the old days Southern would take a unit to lancing set fire to it, and fit a new body to the underframe, it has been attempted in modern era as networker classic showed...
This may be an incredibly naive and stupid thing to ask, but has the scrap metal from any trains been used to create new ones? I know there are lots of jokes on the forum about turning old trains into things like Coke cans, but, providing there isn't too much corrosion or rust on the bodies, could metal and/or parts from units such as the 319s be re-cycled to make new trains?
What sort of state are they in structurally and mechanically? Would it be worth replacing the entire traction package?
The traction package on the SWT 455s and one batch of 321s is being replaced with a modern electronic one, so this could in principle be done with the 319s too. However it is difficult to justify the cost of doing so even though this allows energy saving from regenerative braking. With the 455s it is justified by reducing maintenance, so the new 707s can also be based in the same depot, and probably also by eliminating resistance losses in the camshaft control.
Not anymore they aren't!
Not anymore they aren't!
I thought there was already 6 on lease to Southeastern already ? That's
what was listed on Potterbrooks website. Is the unit-go-round blocked up somewhere or has the SE plan to run the 319's on the Vic's been cancelled ?
The SUBs in question were built from 1946 to 1951.455s have compressors from 1930's SUBs!
455s have compressors from 1930's SUBs!
Traction motors, reversers, field divert switches also. Class 508 have recovered SUB compressors.
Traction motors, reversers, field divert switches also. Class 508 have recovered SUB compressors.
As far as I'm aware it's because their electrical equipment was built new at the time of the units - 1980s compressors operate at a considerably higher speed than those used in the 1950s (I assume that is more efficient, as even those used on modern units like 387s seem to operate at about the same speed).
455s have compressors from 1930's SUBs!
Not sure why Thameslink does not want to keep them, when they are running 1x4 trains in the peak.
Performance - they don't accelerate as quickly as the newer generations of EMUs - and that's going to be critical given the number of trains going through the Thameslink core.
Capacity - for whatever reason they don't have passenger corridor connections to allow walk-through between units.
For starters.
Not sure why Thameslink does not want to keep them, when they are running 1x4 trains in the peak.
Traction motors, reversers, field divert switches also. Class 508 have recovered SUB compressors.
Not wanting to keep a class because there isn't enough of them? Your question answers itself.
With just about every man and his dog franchise supposed to be getting new stock what will happen to all the 319s?
They aren't that old. If SE don't receive even a small number despite a dire need then rusting away for years until possible going to Wales?