tbtc
Veteran Member
HS2 is going to mean an end to a number of the current HS2 links - it's going to be transformational north of Birmingham.
If you accept that we won't have through services like Manchester to Bournemouth in the medium term then why not grasp the nettle now?
Gets my vote.
The only reason to have XC running this service (in my eyes) is because of the available stock (i.e. XC run 170s, EMT don't).
Operationally, it'd make more sense with EMT (who already operate to Leicester/ Peterborough/ Ely etc), it would allow integration with existing EMT services (e.g. Birmingham - Leicester services with Ivanhoe services, giving Loughborough some direct services to Birmingham again).
It'd be nice if the post-ScotRail cascades allowed enough 158s and 170s freed up to bring the Birmingham - Stansted service into line with other EMT services.
Even if paths and stock weren't an issue, I'd not want to put Glasgow - Birmingham services through the bottleneck that is Manchester Piccadilly.
The services work much better being split at Manchester. I'd suggest XC services are split at Leeds too (as previously mentioned).
It's a tough one (and I say that as a Fifer).
The Dundee/ Aberdeen extensions are clearly at "marginal" times when the stock wouldn't be used for much more (i.e. the token extension north of Edinburgh isn't robbing anyone at Birmingham of extra seats), but I don't know how the economics of it work for XC - given the essentially-ECS moves (northbound in the early morning, southbound late at night) and need to keep drivers trained on it... are the handful of people (like me) who use it as a through service beyond Waverley worth it?
Swansea has a direct service every hour to Crewe and Manchester Piccadilly - given the connections from there, I'd say it's doing okay in terms of long distance connectivity.
Once the GWML is wired to Swansea, there's even less chance of XC running there.
I agree that XC should be a proper "fast" service. I don't know if the fact that it isn't is the fault of privatisation (i.e. XC gets ORCATS money from stopping at places like Macclesfield)? It may be.
I don't know about the West Midlands, but they certainly tried this in Yorkshire - southbound peak services from Leeds were "pick up only" at Wakefield for a while under Virgin.
Sadly, the journey was too short (and too busy) for ticket checks, so the hoards of Metro card holders would board regardless and they abandoned it.
Given the problems that XC have, I agree.
TPE and VTEC will be providing increased services from Yorkshire to Edinburgh.
Get GWR to provide more services from Bristol to Devon.
Focus more on the "core" (instead of the much smaller number of people going all the way from Plymouth to Newcastle).
You've mentioned this before, but it'd mean that the rest of the 222s would end up as three or four coaches long.
Given the crumple zones etc in such 125mph stock, that would mean the equivalent seating of two/three coach Sprinters.
Twenty one short Meridians (with all the track access charges of three/four coach units but the seating of two/three coach Sprinters) aren't going to be much use.
This seems more about "what would be nice through Salisbury" than "what would be the best use of the stock.
Agreed.
I agree with both of those points (sadly!)
The fact that they don't think it worthwhile using the HSTs more (and didn't attempt to get more, e.g. VTEC took on a "spare" EMT set) seems significant.
What do you mean by the East Midlands?
There's an hourly service from Edinburgh/ Newcastle/ York/ Leeds to Derby (bi-hourly from Glasgow).
I don't know whether you'd consider Burton, Retford, Newark, Grantham or Peterborough to be in the East Midlands too?
Or do you just mean that you want a service that's fast in the rest of the country but slow in your neck of the woods so that places like Long Eaton are better connected?
Good luck to anyone who can square this circle - Voyagers are too short to be profitable but HSTs are too long to be affordable.
Sadly.
"Project Thor" remains one of the biggest wasted opportunities since privatisation - if they'd got that right then it'd have been transformational - we'd have seen longer XC services as well as being able to potentially extend other fleets too (if the technology worked on Voyagers then it could have been used to put extra coaches into other fleets).
Frustrating.
If you accept that we won't have through services like Manchester to Bournemouth in the medium term then why not grasp the nettle now?
- Cut Manchester off the XC map (it'll be coming off one day regardless).
- Build a fleet of 110mph medium distance EMUs.
- Use them to run a half hourly Birmingham - Manchester service and a half hourly Birmingham - Liverpool service.
- Doesn't matter whether you give these two services to LM/ VTWC, I'm not fussy.
- Make sure that they are long enough to suit the demand between three of England's biggest cities (or doubled up to be long enough)
- Use the eight (?) Voyagers freed up to provide capacity in the York - Bristol/ Reading "core".
- Use the eight (?) 350/2s freed up to provide capacity on the southern half of the WCML (and replacing the need for any 319s?).
Further south,give the Birmingham Leicester locals and the Midlands Stansted to EMT
Gets my vote.
The only reason to have XC running this service (in my eyes) is because of the available stock (i.e. XC run 170s, EMT don't).
Operationally, it'd make more sense with EMT (who already operate to Leicester/ Peterborough/ Ely etc), it would allow integration with existing EMT services (e.g. Birmingham - Leicester services with Ivanhoe services, giving Loughborough some direct services to Birmingham again).
It'd be nice if the post-ScotRail cascades allowed enough 158s and 170s freed up to bring the Birmingham - Stansted service into line with other EMT services.
If nothing at all was an issue such as line capacity, tracks, stock, etc, I'd like to see this;
Glasgow-Manchester-Birmingham-Bristol-Plymouth-Penzance 1tp2h
Glasgow-Manchester-Birmingham-Reading-Bournemouth 1tp2h
Even if paths and stock weren't an issue, I'd not want to put Glasgow - Birmingham services through the bottleneck that is Manchester Piccadilly.
The services work much better being split at Manchester. I'd suggest XC services are split at Leeds too (as previously mentioned).
What? No love for north of Edinburgh?
It's a tough one (and I say that as a Fifer).
The Dundee/ Aberdeen extensions are clearly at "marginal" times when the stock wouldn't be used for much more (i.e. the token extension north of Edinburgh isn't robbing anyone at Birmingham of extra seats), but I don't know how the economics of it work for XC - given the essentially-ECS moves (northbound in the early morning, southbound late at night) and need to keep drivers trained on it... are the handful of people (like me) who use it as a through service beyond Waverley worth it?
I think it would have a practical use. Swansea is 2 changes away from places that can't be easily reached from Cardiff, including some parts of the North East, North West, East Midlands and Scotland. It could increase the competitiveness of Swansea to have direct trains to the West Midlands and put 1 change from most anywhere in the country like Cardiff is. It would require more resources in a new XC tender but I think it has a lot more potential than some other suggestions.
Swansea has a direct service every hour to Crewe and Manchester Piccadilly - given the connections from there, I'd say it's doing okay in terms of long distance connectivity.
Once the GWML is wired to Swansea, there's even less chance of XC running there.
I would like to see services speeded up though through the removal of stops; I'd start by running all Voyager/HST services as express between Birmingham to Derby, Newcastle to Edinburgh and Stoke-on-Trent to Manchester.
I agree that XC should be a proper "fast" service. I don't know if the fact that it isn't is the fault of privatisation (i.e. XC gets ORCATS money from stopping at places like Macclesfield)? It may be.
Potentially - and I know there are a thousand arguments against this - consider pick-up/set-down restrictions so that (say) West Midlands passengers don't cram onto Voyagers for one-stop journeys when there's an LM train along in a few minutes
I don't know about the West Midlands, but they certainly tried this in Yorkshire - southbound peak services from Leeds were "pick up only" at Wakefield for a while under Virgin.
Sadly, the journey was too short (and too busy) for ticket checks, so the hoards of Metro card holders would board regardless and they abandoned it.
No extensions. Rather, consider retreating from the furthest extents of the network (e.g. Penzance) which can be better served by the local operator, enabling more capacity/doubled-up trains in the core
Given the problems that XC have, I agree.
TPE and VTEC will be providing increased services from Yorkshire to Edinburgh.
Get GWR to provide more services from Bristol to Devon.
Focus more on the "core" (instead of the much smaller number of people going all the way from Plymouth to Newcastle).
I suggested elsewhere that by forming a 10 coach 22x it would have broadly the same capacity as a 9 coach train formed of 159's. If these were used on a 0.5tph frequency from Exeter to Waterloo with 1.5tph (rising to 2.5tph post Crossrail 2) run by EMU"s from Salisbury.
By doing so you would just need 6 of them, you would still need a DMU shuttle to run Exeter to Salisbury on the other 0.5tph.
You've mentioned this before, but it'd mean that the rest of the 222s would end up as three or four coaches long.
Given the crumple zones etc in such 125mph stock, that would mean the equivalent seating of two/three coach Sprinters.
Twenty one short Meridians (with all the track access charges of three/four coach units but the seating of two/three coach Sprinters) aren't going to be much use.
This seems more about "what would be nice through Salisbury" than "what would be the best use of the stock.
If more capacity is needed on the core then the only solution really would be to start cutting services back, but I don't see this being the end of the world. If ScotRail are going to run HSTs north of Edinburgh then I don't see the XC offering being able to compete, and cutting back to Newcastle would be reasonable if instead their path were used by a 125mph TPE service from Liverpool which would take advantage of the wires. That service would preserve the Edinburgh-Leeds link as well, so it shouldn't cause a massive amount of harm. I think that there is a lot of suppressed demand on the XC core at the moment as a result of the overcrowding on services, so just providing enough capacity to then give every current passenger a seat might not end up lasting very long.
Agreed.
I am pretty sure the only reason the toilet smells are noticed so much is due to the large proportion of people who end up stood in the vestibule areas. My only complaint about the voyagers is the lack of capacity
XC is the forgotten franchise. They don't serve London or are seen as part of the Northern powerhouse so there is simply no political desire to improve services
I agree with both of those points (sadly!)
The HSTs are not a permanent solution, but there's no need for EMUs to increase capacity just yet. Maybe getting XC to use the HST rakes they do have- rather than leaving half of them parked in Craigentinny all week- might be a good start.
The fact that they don't think it worthwhile using the HSTs more (and didn't attempt to get more, e.g. VTEC took on a "spare" EMT set) seems significant.
Cross country definitely needs an extra train per hour between Leeds and B'ham.
- We are currently lacking a rail operator that connects the north east and west Yorkshire to the east midlands. Cross Country should fulfil this and apply for track access for a new Newcastle to B'ham (via Leeds, and Via Leicester).
Essentially Newcastle - Durham - Darlington - York - Leeds - Wakefield - Sheffield - Derby - EM stops (Long eaton, EM parkway, Loughborough, Leicester) - then direct to B'ham.
What do you mean by the East Midlands?
There's an hourly service from Edinburgh/ Newcastle/ York/ Leeds to Derby (bi-hourly from Glasgow).
I don't know whether you'd consider Burton, Retford, Newark, Grantham or Peterborough to be in the East Midlands too?
Or do you just mean that you want a service that's fast in the rest of the country but slow in your neck of the woods so that places like Long Eaton are better connected?
Why they have been stuck in subsidy could be due to a range of factors:
- short trains limiting the number of passengers they can carry in total (and therefore income),
- expensive track charges for the HSTs,
- no additional income from car parking or station shops, as XC don't have any,
- allocation of overheads or a large management charges from the parent company
Good luck to anyone who can square this circle - Voyagers are too short to be profitable but HSTs are too long to be affordable.
I'm guessing it is too late now to just order additional coaches for voyagers?
Sadly.
"Project Thor" remains one of the biggest wasted opportunities since privatisation - if they'd got that right then it'd have been transformational - we'd have seen longer XC services as well as being able to potentially extend other fleets too (if the technology worked on Voyagers then it could have been used to put extra coaches into other fleets).
Frustrating.
