Therefore it would seem although something similar to my suggestion is already implemented during the morning peak. What about also implementing it during the evening peak?
What happens in the morning is that trains start at New St and work South, and that's how long it happens to take. There are also northbound trains that start empty at Reading, having run up from Eastleigh. Seems to me that they already deal with the morning peak towards New St.
My experience at Basingstoke in the afternoon and towards the evening peak is that southbound XC trains are pretty full to Southampton and beyond, as are SWT - some of whose trains are non stop through Basingstoke in the peak. Turfing out a Voyager load at Basingstoke would seem to cause problems where non currently exist.
I think someone suggested earlier that the XC 'peaks' are widespread across their network, someone's gain would invariably be someone else's loss. Wasn't the whole point of the 2007 franchise to give a consistent hourly clock face timetable? Is that not what most passengers actually want?
--- old post above --- --- new post below ---
Manchester to Reading would require about 60 miles of battery running (assuming zero use of wires between Oxford and Coventry). However I would expect that distance to be reduced fairly quickly after 2020.
Will 60 miles of high speed running actually be possible? I thought proposed distances were significantly less than that.
Where are the Bournemouth trains going in this scenario? If you swap them with the Newcastles, they are much less use than the current service, because the south coast to the NE is well served via London and the ECML.
Surely Bournemouth to Manchester was chosen as the main flow on that axis because that is where passengers want to go?