Liverpool to Leeds and York will have two express trains per hour, Liverpool to Manchester will have eight trains per hour (4x express, 4x stopper).
Sounds pretty good to me.
Sounds pretty good to me.
Liverpool to Leeds and York will have two express trains per hour, Liverpool to Manchester will have eight trains per hour (4x express, 4x stopper).
Sounds pretty good to me.
Although 19 of the new Transpennine trains have been stated as being Bi-modes (and the remaining thirteen for Transpennine North services will have to be diesel or Bi-mode, too), and there has been no mention of 442s anywhere, which would actually have to serve for the duration of the franchise before "pure" EMUs could be introduced on any services other than the Manchester/Liverpool - Scotland trains.442s for a couple of years before the widespread rolling out of new "pure" EMUs seems to be by far and away the simplest idea to me!
And a rather non Liverpool oriented view that assumes that people and businesses in Liverpool would only be interested in being connected to Manchester!
If using Manchester to X journeys as an indication as to what is needed, then Manchester to Leeds appears to be very over-provided with its six express trains an hour serving half the number of passengers that travel between Manchester and Liverpool.
Prior to this announcement, the stated aim was for two trains an hour between Newcastle and Liverpool... so the inference that this is all simply to some kind of coherent, logical plan with everywhere having the appropriate service simply doesn't marry up to that.
NTP3: Do you consider that the ITT should specify which services should terminate at Liverpool or Manchester Airport...
Whilst a lot of people thought we should specify which locations get linked to Manchester Airport and which get linked to Liverpool, there was no broad agreement from respondents on which locations should be linked...
We recognise that connections to both Manchester Airport and to Liverpool are valuable to passengers. There are substantial passenger flows from across the Pennines to both of these destinations, but not every location can have trains to the Airport and not every location can have trains to Liverpool. As we were unable to establish a strong consensus in either direction during the consultation, we are leaving the choices of destinations to bidders to decide, taking into account stakeholder views and passenger demand patterns
Although 19 of the new Transpennine trains have been stated as being Bi-modes (and the remaining thirteen for Transpennine North services will have to be diesel or Bi-mode, too), and there has been no mention of 442s anywhere, which would actually have to serve throughout the franchise before "pure" EMUs could be introduced on any services other than the Manchester/Liverpool - Scotland trains
Hearing rumours of possible MK3 rolling stock use by FTPE next year but not sure on what route. Can only imagine it would be NW/Scot. Interesting times ahead if it actually happens.
87s? That can't be right, surely? There's only one that's main line registered and, as far as I know, only three remaining in the country altogether.TPE apparently looked at class 87 hauled mk3s on Manchester Airport to Scotland but decided they wouldn't work in the current paths due to being slower than 350s.
87s? That can't be right, surely? There's only one that's main line registered and, as far as I know, only three remaining in the country altogether.
If the new stock is AT300 presumably it will only need 100mph capability when running on diesel (similar to the the spec on some of the original order)?
May still need the extra power proposed on the Devon/Cornwall units for climbing the Pennines.
It was probably 86s then, anyway it was some 110mph capable electric loco. I think they were only looking at one Friday/Saturday diagram so that 185s wouldn't need to be used on any Scottish services, so only one set would have been required.
I was under the impression that TPE Manchester Airport-Scotland is still timed for 100mph... As an aside, only 86101 (having been hired to FHT in the past) is capable of 110mph mainline running.
I was under the impression that TPE Manchester Airport-Scotland is still timed for 100mph... As an aside, only 86101 (having been hired to FHT in the past) is capable of 110mph mainline running.
TPE apparently looked at class 87 hauled mk3s on Manchester Airport to Scotland but decided they wouldn't work in the current paths due to being slower than 350s.
I was under the impression that TPE Manchester Airport-Scotland is still timed for 100mph... As an aside, only 86101 (having been hired to FHT in the past) is capable of 110mph mainline running.
What are the capabilities for temporarily adapting the GW IEP fleet to a fleet suitable for TPE purposes whilst they try to sort out electrification.
Again, talking only about Manchester. Liverpool isn't a commuter town of Manchester (hence the commuter stopper trains that operate predominantly in the Liverpool area...).
Of the 4 express trains per hour, how many go to Piccadilly, how many to Victoria, and how far apart from each other are they (answer, two will be possibly be half hourly, with the other two probably near to the existing two as at present).
Versus 6 evenly spaced express trains per hour.
One of those sounds "pretty good" to me, the other sounds pretty basic.
Of the 4 express trains per hour, how many go to Piccadilly, how many to Victoria, and how far apart from each other are they (answer, two will be possibly be half hourly, with the other two probably near to the existing two as at present).
Versus 6 evenly spaced express trains per hour.
One of those sounds "pretty good" to me, the other sounds pretty basic.
The 350's are 110mph capable and do run at that speed. As stated above its used for service reliability, not for timing improvements. Being an intensively used and small, isolated fleet reliability isnt exactly hitting headline figures so reduced journey times would actually cause more disruption. Think also the purpose was to keep the trains technically as similar to LM's fleet as possible for commonality of the fleet and makes redeployment easier. During the commonwealth games TPE's 350's were seen running in multiple with LM's not yet commissioned 350/3's which were built around the same time, providing additional capacity for games traffic.
The plan is for all Liverpool services to go via Chat Moss by December 17 (so Victoria only) and for all Airport services to go to Victoria and then Piccadilly and the Airport by December 17 or as soon as the Ordsall Chord is ready.
So Victoria should get a roughly clock face fast service to York every 15 minutes, Piccadilly will get a roughly half-hourly express service to York (via Victoria) and a roughly half-hourly slow service to Leeds (via Guide Bridge.)
TPE 350s are not permitted to run at 110mph despite being capable of 110mph.