Can't they simply be called 'TransPenine'?
Some of their current services can hardly be classed as 'Express'![]()
And some of their services (North West, Manchester - Scotland) can hardly be classed as "Transpennine", either.Can't they simply be called 'TransPenine'?
Some of their current services can hardly be classed as 'Express'![]()
And some of their services (North West, Manchester - Scotland) can hardly be classed as "Transpennine", either.![]()
Can any if their present services really be called express? Some indeed hardly meet the old Foxwell & Farrer standard of more than a century ago of 40mph average end-to-end.
We are told that they are to acquire 125-mph units, which is fine, but where will these units be able to run at their maximum speed? As far as I can see, only north of York on the ECML. On the WCML the line-limit is only 110 for non-tilting stock, and I have seen no mention of tilt so far for the new trains.
True, that - I would have thought that it would have made sense to just roll the Transpennine services into the "Northern Connect" regional express brand as part of that franchise.TBH I'm still minded that they should have been merged back into Northern, particularly now Northern are getting a load of express services and TPE a load of stopping services. Utterly strange that they aren't when that is the approach being taken darn Sarf.
True, that - I would have thought that it would have made sense to just roll the Transpennine services into the "Northern Connect" regional express brand as part of that franchise.
And plan to move the WCML Scottish services to West Coast where they really belong.
True, that - I would have thought that it would have made sense to just roll the Transpennine services into the "Northern Connect" regional express brand as part of that franchise.
It is.I was under the impression that Northern Connect was an Arriva invention.
And who is this service for? Its principal function seems to be to give Leeds a half-hourly fast service to Edinburgh, as for Liverpool and Manchester passengers the faster route will remain that via Carlisle.
I was under the impression that Northern Connect was an Arriva invention.
The direct award is currently being negotiated between Arriva and the DfT, which will bring the current Crosscountry franchise up to October 2019. I'm not aware of any suggestions of new or additional stock before that point.As things are going at present, a fleet of much longer trains to allow Voyagers to run permanently doubled up perhaps looks likely - any scope for doing that earlier to avoid oddities like this?
I agree completely -- and then they could be properly integrated with the other West Coast long-distance services. (Oh, but we don't do integration in Britain, do we?)
And another Scotland question. The TP Interactive Map of improvements shews only Morpeth between Newcastle and Edinburgh as receiving benefits from the new scheme of things. Does this really mean that the future service-pattern between Newcastle and Edinburgh is to be 4 trains an hour, with East Coast either non-stop or calling at Berwick, XC calling at Alnmouth and Berwick, and TP at Morpeth but not Berwick? And who is this service for? Its principal function seems to be to give Leeds a half-hourly fast service to Edinburgh, as for Liverpool and Manchester passengers the faster route will remain that via Carlisle.
Does this really mean that the future service-pattern between Newcastle and Edinburgh is to be 4 trains an hour, with East Coast either non-stop or calling at Berwick, XC calling at Alnmouth and Berwick, and TP at Morpeth but not Berwick?
We are told that they are to acquire 125-mph units, which is fine, but where will these units be able to run at their maximum speed? As far as I can see, only north of York on the ECML. On the WCML the line-limit is only 110 for non-tilting stock, and I have seen no mention of tilt so far for the new trains.
Discussions have taken place with Siemens regarding new TPE units, new class, not seen in the UK, 100% fact but no more can be said, sorry

Discussions have taken place with Siemens regarding new TPE units, new class, not seen in the UK, 100% fact but no more can be said, sorry
I would hope First have had discussions with all manufacturers who would interested in building new trains for the TPE network.
No, it isn't starting (the Edinburgh extension, that is) until December 2019, when new stock will be available.Regarding the Liverpool-Newcastle-Edinburgh service, will that be LHCS say an 88 or 90 until something else comes along?
They don't legally have to though.
Doubt it, it's a commuter service. Manchester to North Wales went loco hauled on some of their services to ease overcrowding, and of course then the journey times increased.Regarding the Liverpool-Newcastle-Edinburgh service, will that be LHCS say an 88 or 90 until something else comes along?
But I'm wondering if this is not more about making a "nice map" for TPE services than actual demand.
swt passenger said:I tried to fathom this out with a couple of posts yesterday but it looks like no-one really knows yet. Morpeth only every hour seems daft.
Those journeys aren't in place of the half hourly Liverpool to Newcastle service or any third Liverpool TPE service, and would be totally unaffected.
Assuming you're not just babbling because you're on the illogical side of an argument, you need to post comments about those services on the Northern thread.
Given how busy Piccadilly is, my understanding is that a Newcastle-Piccadilly-Liverpool service simply isn't possible. Unless I've misunderstood something?
Newcastle - Liverpool does seem the correct option for 1 TPE train an hour but if there is to be 2, adding Newcastle - Manchester Airport seems to achieve a lot more than a second Newcastle - Liverpool service.
Completely disagree, it's a jumble of services, some leaving Piccadilly, some leaving Victoria, low end connecting in to the airport.Again, I agree. Liverpool to Manchester is adequately served with the combination of TPE, Northern Connect and EMT (or successor) trains. There's no need for more.
Discussions have taken place with Siemens regarding new TPE units, new class, not seen in the UK, 100% fact but no more can be said, sorry