Only if the carriages have the necessary cabling to allow remote control of the trailing loco.Obviously the platforms at Euston couldn't accommodate the sleeper being double-headed in the event of a 92 failure when the new stock arrives. But can topping and tailing provide the necessary power, by leaving on the back whatever brings in the ECS?