northwichcat
Veteran Member
For example, as far as I can see, the TSRs do not require through services to Manchester Airport from Southport or Warrington Central.
Warrington Central is a strange one. The minimum spec document doesn't specify a Manchester Airport to Liverpool via Warrington service, yet the consultation response document (which is part of the Northern ITT) does say one will be introduced.
Maybe DfT want bidders to introduce such a service but will accept bids not proposing to introduce one if they can prove it would be too difficult to run such a service e.g. if the only path they can find for an Airport to Liverpool service interworking with Norwich to Liverpool involves a 10 minute dwell time somewhere then the bidder could argue there's a lack of real benefits for offering a through service.
Nor do they require that all the services on the Northwich/Chester, New Mills Newtown/Buxton and Rose Hill Marple via Hyde North lines run into Piccadilly - some could go to Victoria via Denton or Guide Bridge.
If you're going to propose every single option which isn't 'ruled out' by the ITT then you're going to come up with hundreds or thousands of proposals which no bidder would give serious consideration to.
In theory the minimum service spec doesn't rule out Levenshulme-Manchester requirements being met by a Levenshulme-Victoria service. So in theory a Piccadilly-Levenshulme-Stockport-Denton-Victoria service every 15 minutes with no northbound trains stopping at Heaton Chapel and Levenshulme meets the requirements. Do you think any bidder would seriously propose that?
The consultation response document talks about faster journey times to Manchester via Stockport from Chester/Northwich and Buxton/New Mills Newton. Diverting services to Victoria won't achieve that.
?
Using slightly upgraded 319s to Blackpool and Windermere would probably be financially advantageous
Proposing 'slightly upgraded' 319s should result in the bid being rejected. Blackpool and Windermere services need to be operated by 'Regional Express' trains which must have 2+2 seating, fixed or folded tables at 90% of seats, plug sockets, air conditioning and an accessible toilet with baby changing facilities. The rumoured 350/4s aren't far off meeting that requirement, the 319s are a long way from meeting that requirement.