Correct. I presume it was some sort of BR penny pinching.

However turnaround would only be possible here if the timetable allowed the train to stand on one of the main lines for its turnaround time without blocking any other trains.

At the present time, the Blackpool North to York services pass through Accrington, but when everyone finally gets their act together and rolling stock is finally sourced, there will also be the Blackburn - Copy Pit Line - Manchester Victoria services also using this line through Accrington station.
--- old post above --- --- new post below ---
I presume they could not turn back here at Accrington as it looks to be controlled by a ground frame ?. (This looks like extremely grotty track to me, but I know nothing.) See photo : Accrington 158

I know that pictorial images can give misleading foreshortening, but that "70" limit sign shown in the "Accrington 158" link submitted seems to be quite a high limit on such line curvature pictured in this image.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
I know that pictorial images can give misleading foreshortening, but that "70" limit sign shown in the "Accrington 158" link submitted seems to be quite a high limit on such line curvature pictured in this image.

The curvature isn't that sharp in reality. A 10mph PSR applies through the station with the 70mph PSR commencing just off the platform end in the Up direction so no train would be going through those curves that fast anyway.
--- old post above --- --- new post below ---
The facing crossover nearest the camera is controlled by the emergency ground frame; the trailing crossover is signalled and controlled from Preston PSB. (Dunnow why they did it that way though!)

(Sorry - slightly off-topic!)

The powered trailing crossover is a hangover from when there were Goods loops between Accrington and Church.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I've followed Liverpool-Manchester electrification for a while and aim to have a look at Manchester-Blackpool in the New Year.

Can anyone please suggest any particularly interesting sites along the route, especially between Manchester Victoria and Preston?

With thanks in anticipation.

Dave
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I've followed Liverpool-Manchester electrification for a while and aim to have a look at Manchester-Blackpool in the New Year.
Can anyone please suggest any particularly interesting sites along the route, especially between Manchester Victoria and Preston?
With thanks in anticipation.
Dave

I'd be interested in where they are going to put the main depot for the work.
Phase 1/2 was run from Edge Hill with a couple of out-bases (eg Kenyon and more recently at Salford near the Hope St sidings).
I can't see Edge Hill being used for later phases, so a new depot will be needed, maybe at Preston? to cover Salford Crescent-Preston-Blackpool.
The Salford site I imagine will continue to complete the work around Victoria/Salford Crescent/Ordsall Lane (and new curve), maybe extending east to Stalybridge.
Or perhaps they will set up somewhere like Guide Bridge for the east Manchester work, to continue eastwards with TP.

I'm not that familiar with the structures on the L&Y routes, but the tunnels should be interesting (Chorley and Farnworth).
They will no doubt be sectioning the work between the major junctions, with diversions where feasible on the alternative routes.
They have only done one side of the Ordsall triangle so far, so there will be some awkward blockades as they do the two legs through Salford Crescent (and the new curve).
So the interesting times are set to continue, I think!
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I'm not that familiar with the structures on the L&Y routes, but the tunnels should be interesting (Chorley and Farnworth).
They will no doubt be sectioning the work between the major junctions, with diversions where feasible on the alternative routes.
They have only done one side of the Ordsall triangle so far, so there will be some awkward blockades as they do the two legs through Salford Crescent (and the new curve).
So the interesting times are set to continue, I think!

I believe I posted this elsewhere on this board but in summary
Monday to Thursday nights will see services diverted between Bolton and Preston via Wigan North Western from around 21:00 as I recall.
Farnworth tunnel is being done during an extended blockade of the line.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Farnworth tunnel is being done during an extended blockade of the line.
I'm sure I've read that there will be single-line two-way running through the narrower bore while the wider bore is enlarged to accommodate two electrified tracks. I think it said there will be four trains an hour - presumably that means four each way.

Edit: somebody has just started a specific thread on Farnworth Tunnel in the general subforum. I've suggested that it be moved here.
 
Last edited:

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,570
Location
Lancashire
Depends which sidings at Preston you are referring to, Chritian Road has the NR DU depot and tortuous access by road, Corporation Steet has the E&P depot but good access to the adjacent sidings, Croft Strret is awful access by road and no road access along the sidings, Butler street has no access and no sidings (except the platform 7 road)
--- old post above --- --- new post below ---
They could use Blackpool Enfield Road CS during the main line blockage but road access is again awful to the actual depot and it's in a built up area on one side
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
There doesn't seem to be anywhere around Preston station which is suitable, you're quite right about Enfield Road C.S. at Blackpool, but sidings exist just to the North of Kirkham & Wesham station, albeit on the South Fylde line or the sidings which were part of the Blackpool Central line, currently overgrown.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,570
Location
Lancashire
Yes there is the Kirkham DU sidings with reasonable road access, the old Central Line / what was latterly Kirkham Tip and the road access isn't too bad even though it's off a county lane and the trackway down to the sidings would require lots of widening and clearance the track itself from Kirkham would require extensive repairs
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I'm sure I've read that there will be single-line two-way running through the narrower bore while the wider bore is enlarged to accommodate two electrified tracks. I think it said there will be four trains an hour - presumably that means four each way.

Edit: somebody has just started a specific thread on Farnworth Tunnel in the general subforum. I've suggested that it be moved here.

Thanks much better explained.
 

chorleyjeff

Member
Joined
3 May 2013
Messages
677
At the present time, the Blackpool North to York services pass through Accrington, but when everyone finally gets their act together and rolling stock is finally sourced, there will also be the Blackburn - Copy Pit Line - Manchester Victoria services also using this line through Accrington station.
--- old post above --- --- new post below ---


.

And Blackpool South to Colne
--- old post above --- --- new post below ---
I'd be interested in where they are going to put the main depot for the work.
Phase 1/2 was run from Edge Hill with a couple of out-bases (eg Kenyon and more recently at Salford near the Hope St sidings).
I can't see Edge Hill being used for later phases, so a new depot will be needed, maybe at Preston? to cover Salford Crescent-Preston-Blackpool.
The Salford site I imagine will continue to complete the work around Victoria/Salford Crescent/Ordsall Lane (and new curve), maybe extending east to Stalybridge.
Or perhaps they will set up somewhere like Guide Bridge for the east Manchester work, to continue eastwards with TP.

I'm not that familiar with the structures on the L&Y routes, but the tunnels should be interesting (Chorley and Farnworth).
They will no doubt be sectioning the work between the major junctions, with diversions where feasible on the alternative routes.
They have only done one side of the Ordsall triangle so far, so there will be some awkward blockades as they do the two legs through Salford Crescent (and the new curve).
So the interesting times are set to continue, I think

Chorley tunnel done with the arches?
What about Farmington engineers sidings?
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,570
Location
Lancashire
The Lancashire a Enterprise sidings at Farrington Downsidemay be a better option rather than the Upside a Engineers sidings as they would have better storage and road access.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Both completed early in September.
--- old post above --- --- new post below ---
Are these the ones in Farrington that you mean ?

Or Farington even. ;)

The Chorley arches are back in place, and the track in the tunnel lowered, but no electrification work was done.
There will have to be more blocks to get the wires up.
 
Last edited:

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,617
Location
Rochdale
I believe the arches were put back with either the bolts, or some small amount of metal work installed that will mean its quicker when the rest of the OHLE finally arrives :D
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,617
Location
Rochdale
Thats what I read too Tim, the quote was "The arches and tunnels are wires ready" when the time arrives.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,603
Location
Nottingham
Rail Engineer magazine had a detailed article about the flying arches a couple of months ago, which I think talked about the provision for wiring them. Unfortunately I don't keep my copies and the site is "down for maintenance" at the moment (I wonder if it has overrun?).
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,391
Location
A typical commuter-belt part of north-west England
Or Farington even. ;)

Some of the railway in the early days was referred to as Farrington. In fact when the North Union Railway opened its station on 31st October 1838, it was known as Farrington station.
--- old post above --- --- new post below ---
Rail Engineer magazine had a detailed article about the flying arches a couple of months ago, which I think talked about the provision for wiring them. Unfortunately I don't keep my copies and the site is "down for maintenance" at the moment (I wonder if it has overrun?).

It was the October 2014 issue to which you allude and pp.12-18 carried an article headed "Amalfi in Lancashire. The front page of that issue also carried a large-plate picture of the Chorley flying arches.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,603
Location
Nottingham
It was the October 2014 issue to which you allude and pp.12-18 carried an article headed "Amalfi in Lancashire. The front page of that issue also carried a large-plate picture of the Chorley flying arches.

Thanks. As I recall it mentioned that the bricks were now resting on curved steel I-beams. The bottom flange of one of those would be a good place to attach a bracket like those we saw up thread, attached to the roof at Victoria.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Thanks. As I recall it mentioned that the bricks were now resting on curved steel I-beams.

If you click either of the two links in my post #531 above you can see pictures of them. I chose those two pages almost at random from several found by Google.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,467
Location
Preston Lancs
If you click either of the two links in my post #531 above you can see pictures of them. I chose those two pages almost at random from several found by Google.

Yes thanks

QUOTE "Instead permanent steel arches have been installed which provide the option of being used to mount the new overhead line equipment; the original masonry sits on top of these, only fulfilling an aesthetic role."QUOTE
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Good news folks. Work on the Bolton route has started.
There is a run of new concrete mast bases on the north side of the line between Salford Central and Salford Crescent.
This is the first tangible sign of electrification work on Phase 3 or whatever it is called.
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
Good news folks. Work on the Bolton route has started.
There is a run of new concrete mast bases on the north side of the line between Salford Central and Salford Crescent.
This is the first tangible sign of electrification work on Phase 3 or whatever it is called.

Yet more great news! :D
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Good news folks. Work on the Bolton route has started.
There is a run of new concrete mast bases on the north side of the line between Salford Central and Salford Crescent.
This is the first tangible sign of electrification work on Phase 3 or whatever it is called.

This (Windsor Bridge Sth to Euxton via Bolton) is Phase 4. And the next bit they do will be towards the Euxton Junction end.

Blackpool Preston is Phase 3, Vic to Stalyvegas is Phase 5. Windermere Branch is 6 anf Lostock - Wigan NW is Phase 7.

Phase 1 was more or less finished last year and Phase 2 is the current (over-running) work around Huyton, St Helens and Victoria. They won't all start and finish in numerical order ...
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
This (Windsor Bridge Sth to Euxton via Bolton) is Phase 4. And the next bit they do will be towards the Euxton Junction end.
Blackpool Preston is Phase 3, Vic to Stalyvegas is Phase 5. Windermere Branch is 6 anf Lostock - Wigan NW is Phase 7.
Phase 1 was more or less finished last year and Phase 2 is the current (over-running) work around Huyton, St Helens and Victoria. They won't all start and finish in numerical order ...

Yes I didn't have the up-to-date list with me.
Where does that put the Salford Crescent-Salford Central/Orsdall Lane spurs then?
It would make sense to do the whole triangle at the same time.
At least they get to tick the "project started" box in 2014. ;)
 