• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Marches blocked yet again by A Broken Down Freight.

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
We were 9 late into MAN, and crawled it from Crewe(ish) onwards. No idea why, presume signals against us for whatever reason. Won't blame this one on freight then :lol: .



I was heading north this morning, as was the Freightliner.

......................................................................

ETA: (ATW Journey Check)



I'd let them off 5 minutes!

If it leaves Crewe more than about 5 minutes late, it can end up stuck behind first the crewe-airport-piccadilly that leaves at xx:33 as far as Wilmslow, and then the Alderley Edge - piccadilly the rest of the way. It often then also gets stuck waiting for a path through the junctions at Cheadle and Stockport. Even a small delay on the marches can really mess things up going into Manchester.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
There seem to have been a spate of delays on ATW Journey Check recently - "Due to late running Freight"
 

Hynod

Member
Joined
11 May 2013
Messages
32
Usually what delays the freight isn't the FOCs fault. A freight train will be put away for a late running passenger which will then make the freight late and subsequently have a knock on for services behind.
 

trainophile

Established Member
Joined
28 Oct 2010
Messages
6,980
Location
Wherever I lay my hat
Another one tonight between Hereford and Newport. At least a couple of trains to South Wales being delayed.
--- old post above --- --- new post below ---
And again :roll: . My inbound train to Man Pic, departing for SW Wales at 1430, is "delayed" i.e. held up behind a freight train. I bet it terminates short and I have to make my way to Crewe :( .
 

ReeceEmmitt

Member
Joined
5 Oct 2014
Messages
43
Ten plus minutes slow today on 1508 Milford Haven to Man Pic - guard says it's a 'slow moving freight train'
 

ReeceEmmitt

Member
Joined
5 Oct 2014
Messages
43
1508 Milford Haven to Man Pic last Friday - 10+ late getting into Shrewsbury.
Guard: 'Slow running freight train'
 

83G/84D

Established Member
Joined
28 Oct 2011
Messages
6,151
Location
Cornwall
1508 Milford Haven to Man Pic last Friday - 10+ late getting into Shrewsbury.
Guard: 'Slow running freight train'

I have just looked this up. The train from Milford Haven arrived Shreswbury 6 late and departed 5 late (WTT times). The delay was between Newport & Hereford and was not connected to any freight train.

Information given by guard was incorrect.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
See my Post #64 which said "late running freight train" has become a regular excuse for delays on the Marches.
 

ReeceEmmitt

Member
Joined
5 Oct 2014
Messages
43
I have just looked this up. The train from Milford Haven arrived Shreswbury 6 late and departed 5 late (WTT times). The delay was between Newport & Hereford and was not connected to any freight train.

Information given by guard was incorrect.

Apologies, my fault. It wasn't Friday as it usually is, it was Tuesday.
 
Last edited:

a good off

Member
Joined
2 Jul 2010
Messages
372
Location
Control Room
Until quite recently there was a FLHH coal booked into Woofferton loop but the only one I've seen recently is the occasional 6M58 Westbury Cement Works- Tunstead.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
Until quite recently there was a FLHH coal booked into Woofferton loop but the only one I've seen recently is the occasional 6M58 Westbury Cement Works- Tunstead.

Signaller at Woofferton will often stick one in if they are "out of path" or running poorly.
 

a good off

Member
Joined
2 Jul 2010
Messages
372
Location
Control Room
Signaller at Woofferton will often stick one in if they are "out of path" or running poorly.

Yes it definitely is useful for the late running Portburys if its the same hour as the Holyhead. It is interesting to think how many loops there once were on the North & West especially on the Down.
 

trainophile

Established Member
Joined
28 Oct 2010
Messages
6,980
Location
Wherever I lay my hat
Complete meltdown today on the South Wales to Manchester Picc line, due to a broken down freight train. Also seems to be affecting trains going south, so goodness knows how people are supposed to get where they need to be.

Something is going to have to be done about this.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
Complete meltdown today on the South Wales to Manchester Picc line, due to a broken down freight train. Also seems to be affecting trains going south, so goodness knows how people are supposed to get where they need to be.

Something is going to have to be done about this.

RTT is reporting several passenger trains as cancelled due to a traction problem: 1C92, 1W92 and 1W52 amongst them. I presume that this is the freight train's traction problem being (mis-)reported everywhere? :/
 

ReeceEmmitt

Member
Joined
5 Oct 2014
Messages
43
Would be interesting to see a breakdown of what these blockages are caused by.
 
Last edited:

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
I presume the errant train is this one:

http://www.realtimetrains.co.uk/train/H01043/2015/01/23/advanced

Is there any evidence to suggest that this problem occurs more frequently on this route than any other, or is it simply that because of the nature of the route with a mix of DMUs and freights with few loops, this makes it more difficult to rescue failures, and therefore the effects are worse.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
Complete meltdown today on the South Wales to Manchester Picc line, due to a broken down freight train. Also seems to be affecting trains going south, so goodness knows how people are supposed to get where they need to be.

Something is going to have to be done about this.

I think that is a slight exaggeration!
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Nothing can be done about it as long as the Freight Company is paying Route Access Charges. That's the was the system works now. If a Thunderbird loco was to be provided, who would pay for it as several Freight Companies use the route.
 
Status
Not open for further replies.

Top