The 395s have the same 20m carriage length as almost every other train on the Southern network.
OK I should've checked. I somehow thought that they were the precursors of the 800s in that they were longer, and they do have 2x2 seatring.
The 395s have the same 20m carriage length as almost every other train on the Southern network.
We can't, because they don't have the ATO equipment. It'll all be 700s (assuming the TLP is finished in four years time).
Look at my username.
We can't, because they don't have the ATO equipment. It'll all be 700s (assuming the TLP is finished in four years time).
I suppose we could let you through. You can't go under your own power though - you'll need to be "hauled" by a 700![]()
Are 373s still fitted with AWS/TPWS, and will 374s be so fitted?
373s - Yes
374s - No
Would either an Southeastern Electrostar or a 700 ever be allowed into the International station at Ashford (provided that customs checks etc could be done), to transfer the Eurostar passengers into London via "classic" lines?
Would either an Southeastern Electrostar or a 700 ever be allowed into the International station at Ashford (provided that customs checks etc could be done), to transfer the Eurostar passengers into London via "classic" lines?
HS1 Rules of the Route allows for Bi-Directional Working over night with a linespeed of 100mph on the open line as I recall.
Correct on the 373s as the Ashford International platforms 3 & 4 still appear to have conventional signals and TPWS grids. Assuming the 374s will also stop at Ashford then they will require the same or the signalling changed.
Presumably if it is the northern end that is shut, the javelins will run via Fawkham junction then to Bromley South and Victoria?
You go as fast as the TVM says you can.
Also HS1 is KPH not MPH.
If you wish to be pedantic 100mph is 161kph.
To quote Rules of the Route Section 4 for HS1
A single line of route for at least 160km/h running to be available between St Pancras International and CTRL / Eurotunnel Boundary on Monday to Friday nights.
Therefore any works taking place on the closed line must allow the adjacent open line to operate at a minimum linespeed of 160kph.
I presume the Rules of the Route (now the Engineering Access Statement) work the same as anywhere else on Network Rail, in that they define what engineering access is available while still running the normal timetable. More disruptive engineering access is still possible but requires changes to the timetable, so needs longer advance notice and involves compensation to operators.
If you wish to be pedantic 100mph is 161kph.
Crikey! I better get on one of these popular Javelin railtours then if I'm ever to travel that stretch of line then!Not now, it has been taken off our route cards. Some can still drive it but not for much longer.
Interestingly I don't know what happens if all of HS1 is shut for engineering works - usually it's a part closure eg Ashford to Ebbsfleet. When this happened I recall coaches being used to transfer passengers between Ashford and Ebbsfleet with the Javelins taking over from there.
The road journey time is quoted as 40 minutes assuming no traffic. The timetabled say to allow an extra hour for the journey. In this instance it's probably better to use the main line train service to London than risk the rail replacement vehicle breaking down/getting lost/can't take bicycles or is just a bad driver