With the latest Metro Charter showing reliability at a shocking 80.07%, is it possible to have a list of how this statistic was calculated.
What were previous years results.
Is it possible to know how many disruptions were caused by rail failure, staff shortages, etc...
Are the 'excuses' used the actual reasoning.
The past few days, they have been blaming LRA adhesion (late in the the afternoon) - whereas, Tanoy announcements have been stating train failures.
You cant believe what they are staing now. The next one (4 week period ending 8th November) will be the truly interesting one. It will state the facts and should if the current level of service keeps up bring service levels down to around the 65% mark.
IMO - I believe they are using LRA as an excuse, due to poor management
The latest Passenger charter is correct.
The 'excuse' of LRA is true. The announcements have been pre-recorded and I've noticed aren't being altered later in the day which is why it's often been saying the same problem for the whole day. TBH, I'd much rather an announcement saying the wrong reason than no announcement. I can usually find out the real reason and more often than not what passengers are told is relatively correct.
As for finding out what are the actual levels, you could try a Freedom of Information request.
Staffing levels are low. Around 15 CSA's are off due to illness or other reason like that, 20 have left, and so they are currently down a lot of CSA's meaning staffing is generally down. They are in the process of recruiting for 40 new drivers.
In summary the Metro has many issues presented and this month has been a failure, most of the day it is Low Rail Adhesion that is causing the delays, as he trains struggle for any traction throughout the network, then its the failures that occur during the day be they points, signal or train which then means the trains are further off timetable and they cannot catch up as they cannot get anywhere near the max speed. Consequently trains terminate at Bede, Regent Centre and Monkseaton (I saw a Regent Centre terminator on saturday!)
Metro could improve, they could run the old tamper during the day to spray the worst parts of the line, although I question if they even run it at all. Nexus Rail is also in question as their relatively new assets are failing frequently and then the MetroCars themselves can be an issue but recently I believe our trains have been rather reliable compared to earlier in the year.
Regarding the flare man, I hope they throw the full book at him the silly ignorant so and so, apparently it was an Arsenal fan. It added to the delays and literally left huge gaps in the service, with some airport trains not due for a good 20 minutes.
Regarding a success story on the Metro, I'm loving the gatelines they must be having a huge effect on cutting the fare evasion and they seem to be frequently in use everywhere bar South Shields. I'm sure they'll be earning their keep. I wonder if Nexus would be willing to put more gatelines into places such as Regent Centre and Four Lanes Ends if they turn out to be successful, it would have been nice if they could have put them into West Jesmond and South Gosforth but obviously it'll be too costly.
The Regent Centre terminator on Saturday may have been an additional train for the match as they usually run - IIRC it's been discussed before in this thread. But otherwise there have been a lot of services terminating short because they've been too far behind their schedule and the next train has caught them up. If, however, the trains are running with a 12/15 minute frequency but not to timetable then they will continue as normal.
The new rail adhesion train (possibly the old tamper) has apparently been faulty and so the road railer is the only way of spraying again and as such the tracks only get sprayed overnight.
Trains have been considerably more reliable with the LRA but then they've been mixed with other problems and the delay just stacks up. I imagine LRA wouldn't have actually been such a significant problem this year, but then who knows because there have been other problems.
I'm starting to warm to them now. They aren't as faulty as they where and a lot of people are starting to understand how they work so they are a lot more efficient. I think I've mentioned this before but I was standing at Monument and the amount of people who walked past the machines to then turn around and buy a ticket was ridiculous.
Heworth barriers are manned from 7am (?) till 7pm (?), so I'm guessing it's fairly similar for South Shields, but I hardly venture down that way and get off so wouldn't know for sure. I can see them being rolled out at more stations if they really help with fare evasion. Jarrow and Hebburn have to be candidates as well as some others on the North side of the system.
And for those after the latest passenger charter you can view it here:
http://www.nexus.org.uk/sites/default/files/Metro Charter poster P7_2014web.pdf