I would imagine at some-point the Scottish government will look into reopening the Edinburgh Suburban and Southside Junction Railway for passenger services with a couple of the old stations re-opening
There are 3 problems with reopening the south sub in increasing difficulty of solving them:
1 Freight services. To compete with buses at least a 4tph service would be required that would need to be carefully timetabled to aloe freight to continue to use the south sub.
2 Journey times. Because the route is indirect Journey times from Cameron Toll / Morningside struggle to be competitive with existing bus services.
3 Waverley capacity. The west approach at Waverley is basically full (especially on the south lines. Reopening the south sub is never going to justify paying for the Almond Chord to rebalance the western throat and if capacity is created that way it will be to use if for more services elsewhere e.g. High Speed Rail.
The only way you could imagine the south sub reopening would be to create a new terminus platform at the south side of Haymarket station to avoid using up track capacity in Waverley Western approaches.
I agree with Altnabreac - I don't think that the "Sub" would really solve very much - you'd have to run a "turn up and go" train service to compensate for the indirect route, and there really aren't the paths for that.
And, if there were the paths then the "Sub" would have to compete with Gorebridge/ East Lothian/ Fife etc for them - all of which would have a good case.
Not a reopening but a missing link ...
Bradford cross rail
But not a hope in **** when Bradford council can't the benefits and seem to be disinterested in rail services beyond Low Moor or Apperley Bridge. Bradford will miss out on HS2 and HS3 and links thereto without a murmur from local politicians.
What would Bradford Cross Rail "solve" though? Is there a big market to get from Ilkley to Halifax, for example?
It'd be nicer to have all Leeds-bound services depart from the one Bradford station (just like all Bradford-bound services currently depart from the one Leeds station), but this is a very expensive project for a "nice to have".
I suppose it'd make things easier for Leeds fans desperate to get home after their embarrassing League Cup exit tonight though
Tottenham South Curve is an existing, indeed electrified, double track line linking South Tottenham to the line south from Tottenham Hale. To connect Tottenham Hale to GOBLIN would need the North curve, currently mainly a scrapyard, rebuilt. But then you'd be trying to run trains onto an already hilariously congested bit of track. If you want an impractical and highly expensive upgrade for the area, you'd run a fully grade separated pair of tracks from Hackney Down to Harlow Town, take out all the level crossings and then you'd have capacity for metro-type operations to go on to GOBLIN.
Cheers - I'm getting my curves mixed up!
I like the idea of freeing up capacity at Liverpool Street/ encouraging better links between GOBLIN and the rest of the network though (GOBLIN goes frustratingly close to a lot of lines without interchanging very well).
One of the curious things about these discussions is that the absence of a bus link is taken as a lack of demand and used as a justification not to construct a railway, whereas if a frequent bus service exists, it's said that there's no need to have a railway because the bus is there.
I'm inclined to think that Uckfield and Crowborough (and potentially Tunbridge Wells) would create a steady flow of passengers towards Lewes and Brighton throughout the day, much like Eastbourne, Hastings and Bexhill, as opposed to the more peak focused London traffic.
The line should be extended and the opportunity taken to upgrade the existing section at the same time.
I'm of the opinion that new stations have worked where there was a good bus service along that corridor (Ebbw Vale, Alloa...), so it seems like a good benchmark of whether a train can be sustained (if you can convince hundreds of people an hour to use one form of public transport between two places then they can form a good baseline for a train - whilst motorists may be harder to win over).
However my reluctance for re-opening the Uckfield line is for more practical reasons - as outlined by
Bald Rick - if we can't fit existing passengers through bottlenecks like East Croydon then trying to squeeze further numbers isn't going to work.
It's a more boring answer to say "lets focus on improving existing services because we don't have the luxury of being able to worry about fantasy re-openings", but that's my position, sorry.
Subject to the Rotherham Parkgate trial being successful, I could see the possibility of Sheffield to Stocksbridge being reopened as a tram-train route... One of the several reasons a reopening of the whole route has never got off the ground is the difficulty in reaching Midland station from the stub of the Woodhead line. Tram-trains of course wouldn't have this problem, and could join the existing tram network either at Wadsley Bridge/Hillsborough or somewhere closer to the city centre near the site of Victoria. Of course if the freight to Stocksbridge drops off completely a regular tram route would be just as likely.
Would that be opened or reopened. I didn't think the Stocksbridge Branch (as opposed to the GCR line to Penistone) had ever had a passenger service.
I would guess t you would probably need an on street extension into the town centre from the old? steelworks.
I'm not sure about Stocksbridge.
The alignment of the Deepcar line manages to avoid many areas of population in the ten-ish miles to Sheffield, it would approach Sheffield from the wrong direction (coming through the current Victoria site, joining the Darnall line heading out of town), any station at Stocksbridge would be quite a walk to most of the areas of population (it looks close on a map, but try climbing the hill to East Whitwell/ Garden Village etc), so some kind of shuttle bus may be required (and we already have a shuttle bus connecting with SuperTram every ten minutes with modern buses).
IF you want to extend SuperTram then there are better places (Herdings Park to Batemoor? Halfway to Killamarsh?)
Ignoring the main-line station, Liverpool Street will have same number of XR and Met etc and more Central Line trains than Farringdon will have TL, but I don't like being pedantic
I don't like to be pedantic either (but I don't think that the Central Line would count as "trains" when we are making such comparisons, otherwise we'd be talking about a station on several Underground lines already beating Liverpool Street).
How I see it is that on top of the Altnabreac conditions for success, which are mostly those that deal with the economic/commuter market, there is another, lesser condition of the tourist and cultural value of a location. I don't doubt that Witney may be a nice place to live but it's not really that 'special' in the grand scheme of things. Places like St Andrews, on the other hand, would benefit far more from a tourist aspect if connected to the rail network. On top of that there is actually a housing market justification because the town is tiny, full of students (meaning high rents) and to top that off a large enough proportion of the student population is rich enough that there is no real limit on how much they will pay for accommodation. A standard four-bedroom house for rent can easily be £400 per person per month to rent on a student contract, which makes it basically impossible for locals to afford living there and since the town is so small and public transport is relatively poor, it's not like in a larger town or city where it is most often possible to live in a non-student area where rents are relatively normal. If you built the railway, it would basically open up the whole of Fife and Dundee to house people living or working there, which would then work well with the enhanced job possibilities from increased tourism (it would be madness for the ICEC operator to extend a few Edinburgh IEPs up there, with the golf and everything).
St Andrews is a tricky one.
One factor not mentioned in this thread before is the "are there any existing services that can be extended" criterion. Given the lack of spare paths over the Forth Bridge (which means no extra services through Fife any time soon), serving St A would have to be one of:
- A shuttle from St Andrews to Leuchars (at least two/hour, to connect with the two/hour to Edinburgh/ Dundee)
- A regular service from St Andrews to Dundee
- Diverting (some of) the existing Edinburgh - Dundee/ Aberdeen services into/out of St Andrews (which would mean a couple of reversals, adding the best part of half an hour for longer distance passengers - which would be a big chunk out of a journey like Kirkcaldy to Dundee)
There's clearly a market there (nine buses an hour through Guardbridge) and the market has grown in recent years (people used to commute from St Andrews to Dundee, now the relative markets and house prices have changed which mean more people seem to commute from Dundee to St Andrews), Students and tourists travel long distances to St Andrews (regular Stagecoach coaches to Edinburgh and Glasgow, six "fast" buses an hour to Dundee) but I'm not sure how best to meet that demand.
Also, some other practicalities - would it be a single track line (which would make it harder to fit in longer distance services and restrict frequencies)? Would you demolish the current car parks in this busy town to put the station back where it used to be? Or build an "out of town" station near the Old Course Hotel (which would still require buses/ taxis)? Is the Tay Bridge still restricted to one train on its central section at any time (which may restrict the idea of a frequent service from St A/ Leuchars to Dundee)?
I dunno. There's definitely a "problem", but I don't know how we solve that with heavy rail. Meanwhile, Leven/ Methil doesn't have the tourism, doesn't have the Students, but would be a lot easier to serve by rail (extending Fife Circle services from the Glenrothes/Thornton area to Levenmouth).