Somewhere in the USA is a sculpture of Cadillacs set in concrete on end. Alternately, put them on a beach north of Liverpool Anthony Gormley-like where donkeys are normally seen.
Somewhere in the USA is a sculpture of Cadillacs set in concrete on end. Alternately, put them on a beach north of Liverpool Anthony Gormley-like where donkeys are normally seen.
And we can go round and round in circles again and again on this subject.
Deemed not good enough for London Commuters on Thameslink, but deemed suitable enough for London Commuters on the Great Western?
Having travelled on a few of FCCs refurbished 319/3s last week, there's little that's unsuitable about them
Now, there's a thought!![]()
You can have Class 319s or you can have nothing.
Sending the full 86 unit fleet to Northern gives them a large homogenous fleet of units that are known to be reliable.
Essentially (on electric services) stock limitations dissapear completely.
I think a significant amount of further electrification would be required for Northern to gainfully employ 86 319s!
If the North was getting fully refurbed 319s as promised, there would be no issue, but the Government/DfT attitude that we will tolerate 30 year old cast-offs because we are less well off and wear cloth caps is both insulting and extremely irritating.
If we have to mop up 86 units then at least we will get more electrification
The airport to Blackpool service is unlikely the be operated by 319s long term since it's a TPE service and so is earmarked for 387s. I don't think many platforms are able to facilitate 160m long trains. It's likely that the 319s will be split between us up North and the Thames Valley branches.?
Windermere - Stalyvegas
Liverpool - Airport
Liverpool - Blackpool
Blackpool - Airport
Stalyvegas - Clitheroe
Wigan - Rochdale![]()
Chester - Rochdale
Double sets on most services and off-peak cleaning; not far off 86?
It's better that we get some kind of EMUs to operate our new wires than wait for months for the units to be refurbished. When they arrive at West Allerton TMD they will be refreshed and deep cleaned which is all the DfT will allow in the direct award.If the North was getting fully refurbed 319s as promised, there would be no issue, but the Government/DfT attitude that we will tolerate 30 year old cast-offs because we are less well off and wear cloth caps is both insulting and extremely irritating.
If we have to mop up 86 units then at least we will get more electrification
There 86 319 to be cascaded. They may also be cascaded dc third rail units
Just the total AC units 328 I would imagine they will want to loss 317 and 321 at part of the AC cascade so some 319's can count against the DC cascade they need to do.
The airport to Blackpool service is unlikely the be operated by 319s long term since it's a TPE service and so is earmarked for 387s. I don't think many platforms are able to facilitate 160m long trains. It's likely that the 319s will be split between us up North and the Thames Valley branches.
I'm not sure we really have anything to go on to say that Blackpool will continue to be a TPE service, or that 387s are "earmarked" for TPE. In many ways 387s, with the 110mph capability would be more suited to GW.
Quite.
/
And why are northern MPs and Northern Rail itself shouting from the rooftops about it ?
The airport to Blackpool service is unlikely the be operated by 319s long term since it's a TPE service and so is earmarked for 387s. I don't think many platforms are able to facilitate 160m long trains. It's likely that the 319s will be split between us up North and the Thames Valley branches.
It's better that we get some kind of EMUs to operate our new wires than wait for months for the units to be refurbished. When they arrive at West Allerton TMD they will be refreshed and deep cleaned which is all the DfT will allow in the direct award.
I think you meant "aren't".
The fundamental problem is that most of the MP's have no affinity with the area. Most of them are carpet baggers who owe their seats to having been forced in by the London leaderships, and that is where their loyalties lie, not to their constituents. "The North" is somewhere they have to show up at election times and as little as they can get away with in-between.
Thus for example none of the Leeds MP's comes from Yorkshire. Add in the likes of Ed Balls, Yvette Cooper, Mary Creagh, Ed Milliband etc and you can see why local issues don't get much priority. Basically they have no personal commitment and when they lose their seats they will stay in their London homes where their friends and families are.
There are rough ideas based on stuff which has come out of the DfT and where EMUs are required. The 387s were ordered to allow 319s to be released sooner than they would if we had to wait for the 700s. They were basically ordered for cascade purposes as a stop gap as you say. The 110 mph capability allows them to be suited to a number of workings which they otherwise wouldn't be able to operate.Does anyone actually know what is going to happen to the 387s? I'm hearing a lot of random uses for them. I suspect it's still somewhat up in the air, no?
Please correct me if I'm wrong, but my basic understanding of it is that they were ordered with the mindset that something; perhaps anything, was needed
quickly because of the ridiculous and extensive delay to the 700 order to plug the gap. Nobody seems to know what to do with them after that...
"Oh we'll send them to TransPennine" and "Oh they can do the Corby services" when they are were hardly build with that sort of work in mind.
It's all because of their cock up of the ICWC franchising process and this is the fall out were still receiving some two years later.Re your last sentence: there was never any doubt that it is the London-based DfT who deserve all of the flak for this frankly disrespectful shambles.
?
Windermere - Stalyvegas
Liverpool - Airport
Liverpool - Blackpool
Blackpool - Airport
Stalyvegas - Clitheroe
Wigan - Rochdale![]()
Chester - Rochdale
Double sets on most services and off-peak cleaning; not far off 86?
If the North was getting fully refurbed 319s as promised ...
... all because of their cock up of the ICWC franchising process and this is the fall out were still receiving some two years later.
There was no commitment to refurbish the stock, that will now be ow to the next franchisee.
[Great Western]
45. It will then be possible to transfer the current Thameslink four-carriage
electric trains onto the Great Western Main Line, replacing the current
three-carriage diesel trains. These 100 mph vehicles will be completely
modernised, including the installation of air-conditioning, and will offer
quieter journeys and additional capacity. It is planned that suburban
services between Oxford, Reading and London will be operated with
such vehicles from the end of 2016
[NW Regional]
68. Completion of the second phase between Newton-le-Willows and Liverpool
will provide a fully electrified route between Liverpool and Manchester.
Like the Thames Valley suburban services on the Great Western Main Line,
regional services will be operated from 2013 by four-carriage electric trains
transferred from the cross-London Thameslink route. These trains will be
completely modernised before they are transferred, including the installation
of air conditioning.
http://collections.europarchive.org...t.gov.uk/pgr/rail/pi/rail-electrification.pdf
Yes there was see below.There was no commitment to refurbish the stock, that will now be ow to the next franchisee.
--- old post above --- --- new post below ---
I wasn't referring to the delay I was referring to Northern being unable to refurbish the 319s before they arrive, had ICWC not have been messed up the would be a new northern franchise in place now where the 319s could be refurbished however we've got a direct award which more focused on reducing subsidy.It's more to do with Bombardier's apparent inability to deliver a fully working product on time than a direct consequence of ineffective Public Sector bureaucratic incompetence.
:roll: not seen this 'argument' come up in a while(!) Firstly if TfGM, WYPTE, MerseyTravel - any local authority - want to subsidise rail fares then that's fine since it encourages more people to travel since fares are cheap which is a good thing. When you go out of a PTE area fares will shoot up so it's not like Northern have low fares it's just in the PTE subsidised areas. Secondly the whole business case for the electrification of the North western triangle was based on the use of cascaded Thameslink units.With regard to all the childish belly-aching about rolling stock allocations to northern services perhaps if the actual users of those services paid a more substantial portion of the operational costs as part of their rail fares, as 'southerners' do, then they to might get new vehicles directly allocated.
I think you meant "aren't".
The fundamental problem is that most of the MP's have no affinity with the area. Most of them are carpet baggers who owe their seats to having been forced in by the London leaderships, and that is where their loyalties lie, not to their constituents. "The North" is somewhere they have to show up at election times and as little as they can get away with in-between.
Thus for example none of the Leeds MP's comes from Yorkshire. Add in the likes of Ed Balls, Yvette Cooper, Mary Creagh, Ed Milliband etc and you can see why local issues don't get much priority. Basically they have no personal commitment and when they lose their seats they will stay in their London homes where their friends and families are.
When I'm Prime Minister there is a job for you as my Transport Secretary!![]()
Us and You is it!!!!
I resign. I enjoy delivering things too much to sit playing at train sets.
I think you meant "aren't".
The fundamental problem is that most of the MP's have no affinity with the area. Most of them are carpet baggers who owe their seats to having been forced in by the London leaderships, and that is where their loyalties lie, not to their constituents. "The North" is somewhere they have to show up at election times and as little as they can get away with in-between.
Thus for example none of the Leeds MP's comes from Yorkshire. Add in the likes of Ed Balls, Yvette Cooper, Mary Creagh, Ed Milliband etc and you can see why local issues don't get much priority. Basically they have no personal commitment and when they lose their seats they will stay in their London homes where their friends and families are.
With regard to all the childish belly-aching about rolling stock allocations to northern services perhaps if the actual users of those services paid a more substantial portion of the operational costs as part of their rail fares, as 'southerners' do, then they to might get new vehicles directly allocated.
This attitude ****es me off immensely. Do you think all fares around here are good value?
Have you seen how much it is from Leeds to York? It's only 25 miles. Or any of the fares to or from Hull or Scarborough.
Leeds to Liverpool? Doncaster to York? Crewe to Preston? All of these are shocking poor value per mile.
Harrogate to York is only 20 miles it doesn't have many trains and all of them are in a pretty horrible condition (unless a 158 turns up) it's still nearly £10.