Even if they did send 6 at by May you have nowhere for them to run
You are out of date Sir, Bollo Lane and Kew East Jn (with its semaphores) were abolished a couple of years ago. It's all colour light controlled from Acton Wells.
Thought 6 had to go in may 2014?
Is it true that chiltern could sub-lease a few of the 9 170/3s back to TPE until they're either needed by chiltern or no longer needed by TPE?
Even if they did send 6 at by May you have nowhere for them to run, so I guess with one on the way at least the fitters at Allerton can get familar with their new toys!
That is what is being proposed according to the WNXX thread. Chiltern is simply taking the long term deal to secure it the units it requires long term with them initially loaned out today just like they are to TPE.
That is what is being proposed according to the WNXX thread. Chiltern is simply taking the long term deal to secure it the units it requires long term with them initially loaned out today just like they are to TPE.
Thanks at least it means that the situation can't be as bad as it's not being portrayed in the media.
Even if they did send 6 at by May you have nowhere for them to run, so I guess with one on the way at least the fitters at Allerton can get familar with their new toys!
South Manchester routes where there are not enough 323's available. 6 would be overkill though
Problem arising is it wants them back before electrification is completed.
Also when will the Earlestown-Liverpool wires be ready? If they are ready to use before the December timetable change then if Northern have EMUs available and crews that sign them then they can make use of the wires as soon as they're ready.
Also when will the Earlestown-Liverpool wires be ready? If they are ready to use before the December timetable change then if Northern have EMUs available and crews that sign them then they can make use of the wires as soon as they're ready.
Rochdale Online said:Rail Union RMT slammed as "outrageous and scandalous" news that desperately-needed trains will be moved from the North to the South of England in a manoeuvre that exposes the critical shortage of rail rolling stock due to years of underinvestment, as well as delivering a kick in the teeth to the North.
It has emerged that nine trains currently used by Trans Pennine Express will be moved to Chiltern Railways.
The trains, currently used between Manchester and Hull, will move from April 2015 in a lease agreement despite the fact that the stock is desperately needed on the northern routes.
RMT General Secretary Bob Crow said: " This move is nothing short of a scandal and ignores the fact that First Trans Pennine Express is already the most overcrowded train service in the UK. As a result of this move, which is supported by the Government and the Transport Department, the route will now lose 13% of its train units which our members have made clear will lead to absolute chaos and dangerous overcrowding.
"Once again the failure to invest in new rolling stock and capacity, combined with the fragmentation and profiteering of privatisation, leaves a trail of wreckage in its wake. Not only that, but the North loses again and rail passengers and staff have nothing to look forward to other than continuing overcrowding and chaos. The only solution is public ownership and an end to the expensive nonsense of privatisation.”
And what would you replace the loss of LMs 3 car 170s with? Passengers on Hereford/Shrewsbury services certainly would not be happy with shorter trains; 172s would not be suitable for constant use on the lines.It's still not an ideal situation however. I wonder what the DfT is still referring too though as suitable trains will be sourced in time to replace the TPE units. Unless they are looking towards LM and either their 170 or 350 Fleets? (6 x 3 Car 170s = 18 Cars, the same as the 9 X 2 car 170s going to Chiltern, or using more 350s to strengthen the TPE electric services to free anymore 185s?).
Much has been said about the Pacer trains that were introduced in the mid-1980s and have rightly received their fair share of attention. With the introduction of new rolling stock into the region, higher quality rolling stock will be released for use across the network. In the forthcoming franchise competitions for Northern and TransPennine Express, the Department does not intend to specify the type of trains to be used. However, hon. Members will have seen the Official Journal of the European Union notice that we set out for the East Coast franchise and we expect to ask bidders for the Northern franchise to put forward proposals for the removal of Pacers from the area. Furthermore, as hon. Members will have noticed, the new franchise competition gives as much weight to quality as to price aspects of bids, so we expect bidders to take that opportunity to reflect that in their bids and operating plans.
Hammond today said bidders of the 2016 Northern franchise to be tendered this December would be asked to propose solutions for the removal of Pacers from the area. Now that may well in practise mean it may be 2018 or 19 before they would be removed (though naturally a TOC would want to get the most from the investment by having it as early in the franchise as possible). It also doesnt stop them being used elsewhere, however with Northern as a customer gone it would become unlikely that they would be made compliant for 2020 access.
Hammond today said bidders of the 2016 Northern franchise to be tendered this December would be asked to propose solutions for the removal of Pacers from the area. Now that may well in practise mean it may be 2018 or 19 before they would be removed (though naturally a TOC would want to get the most from the investment by having it as early in the franchise as possible). It also doesnt stop them being used elsewhere, however with Northern as a customer gone it would become unlikely that they would be made compliant for 2020 access.
That's strikes me as being difficult as there seem to be still lots of uncertainties as to rolling stock freed up by electrification and where it will go, after all nobody including Daft is would seem expected the TPX 170's to go to Chiltern. We still don't know but maybe Daft do as to what's happening with the HST's to the south west, will the 222's go there, will it be a fleet of IEP's requiring 158's for some Plymouth Penzance services, a lot of variations which would seem to require some co-ordination, yet Daft are now saying they should leave to the TOC's.
The DfT seem to have had some idea of what's going on since they gave permission for Chiltern to take the TPE 170s in November time last year, or at least that's what's been reported.
It was a commercial arrangement that DfT were made aware of and chose not to block opposed to they gave permission for Chiltern to take them. According to Stephen Hammond talks are ongoing to allow TPE to retain some of the 170/3s until the start of the next franchise.
It's been suggested that Porterbrook see the Wales and Borders as the mostly likely franchise to be able to commit to using 143s/144s for 10 years following a compliant refurbishment.
I just cannot see what routes they would serve in any great quantity once the 313s and 315s arrive. I would have thought Northern was still a better bet from Porterbrook's point of view.
One possibility (perhaps, if it can be costed!) could be to reform (some of) the 2-car pacers into 4-car units by removing one cab from each and fitting a gangway...![]()
Would it be better (i.e. how many 4 coach pacers would actually be needed) to take 3 and form them in to 2 with 3 coaches in each? It is likely to cost the same as forming them as a single 4 coach set (in that there would be two cabs to remove and two gangways to be fitted).
For reference, a hypothetical 4-car pacer would be 62.2m long, approximately the length of a 3-car Class 150. Actually, it may be slightly shorter than that, a 144 centre car is 15.43m. A 3-car pacer (these already exist after all) is 46.53m, slightly longer than a 2-car 156 at 46.06m.