I had a quick tour around all the Phase 2 routes today on a Lancashire Day Ranger. Although a lot has been done over the Christams/New year blockade in the ManVic-Ordsall area, as described on here, it seems to me that there is an awful lot of work still to do between Wigan/Earlestown and Edge Hill if it is all to be powered up by Dec 2014! It took ~3 years to do the 15 miles of the Chat Moss Line and there does not appear to be a great deal of progress on the rest since last summer! Why is the installation so patchy/haphazard and unsystematic? i.e. stretches with bases/steelwork in place but with so many gaps and uncompleted bits and pieces, rather than working continuously from A to B? No sign of any wiring, or the prospect of any, since the completion of Stage 1 several months ago.
I agree it looks both haphazard and slow. Had a look round Roby over the holiday period, where the new subway is open and there is some further progress on platform refurbishments and extensions, and sheet piling has appeared along much of the embankment to the west. At Rainhill there is no sign apart from an equipment cabinet that appeared last year (and of course the bridge works, two out of three of which had to be redone or revised). There are foundation or test excavations to the east that have been there for months.
I assume there is some rhyme or reason to it, even though it is not apparent to the observer. Presumably phase 1 does not give an entire picture of the likely speed, since it involved more tricky ground conditions. And in any case, despite numerous dire prognostications, they did get it finished on time.
On the Victoria works, I'm interested to see the different form of the OLE bases, apparently involving a fairly shallow foundation pad with another shallow slab laid on top. I suppose having to do with its being on made ground on a viaduct. I wonder how they attach the slab to the pad - it doesn't seem to be bolted. With some kind of glue?