But still it must complicate things because the SE side of the operation has to time well with the FCC side...
A walk in the park compared to the 2018 Thameslink timetable!!
Only 24tph but the effect will be much the same.
Let's just hope the new operators don't use the current solution of "chuck everyone off and turn the rain around early and/or skip busy stops" in the peak direction.
( A great way to get the train back on time but terrible customer service! )
</rant>
hmm, thought I'd read 32 somewhere. Guess not
Normal operation, the headway of 2½ minutes comprises 75 seconds platform reoccupation, 45 seconds dwell time and 30 seconds of operating margin.
During service recovery, for short periods of time, a headway of 2 minutes is required, comprising 75 seconds platform reoccupation, 45 seconds dwell time and no operating margin
No you have read a higher figure somewhere, it's the design capability, although it is 30 tph (that is shown as a 2 minute headway in the Thameslink 'train control spec' - part of the ITT information). It's to allow for short periods of higher capacity during perturbation recovery. Basically it is the built in margin to allow a reliable normal service at 24 tph:
Worse is when you get ones like #Wool or #Healing or even #University.
Even if you could simply restart the trainset after a problem has cleared, and drop straight into the next iteration of a regular pattern (which probably wouldn't be much easier than trying to pick up appropriate workings on an irregular service anyway), you'd still have the significant problem of drivers and guards (who might be due a PNB, or need to get back to somewhere else, or were booked to be relieved at X whilst the diagram that they've dropped onto works through so there's no-one to relieve) and trains (which aren't such a problem in the short term, but need to end up in the right place by the end of the day for fuelling, maintenance etc.) all being in the wrong place. Plus, an 'irregular' service is often necessary in the peaks, even where it follows a standard pattern for the rest of the day, to make best use of the capacity available, make additional calls and so on.
Planners dont set out to make services too complex at all.....they are simply reacting to the needs of the whole network which has multi stakeholders with different aspirations. A big hurdle to overcome is the fact that most routes carry mixed traffic ( High Speed , Suburban and Freight ).
There is a general idea at higher levels of management that we should be looking to run fewer but longer trains......this has some merit in my opinion
Damian H @madian11 45m
@SW_Trains Why cancel Waterloo to Portsmouth trains that tie up with the IOW ferry. Now 45 min wait at Portsmouth.Why not 46 min past train?
Reply Retweet Favorite More Expand
South West Trains @SW_Trains 22m
@madian11 I am sorry about this. We have a major landslip that is causing severe disruption
Hide conversation Reply Retweet Favorite More
4:11 AM - 27 Dec 13 · Details
No you have read a higher figure somewhere, it's the design capability, although it is 30 tph (that is shown as a 2 minute headway in the Thameslink 'train control spec' - part of the ITT information). It's to allow for short periods of higher capacity during perturbation recovery. Basically it is the built in margin to allow a reliable normal service at 24 tph:
On the London Overground East London Line we regularly do this during severe disruption. All trains sent back in to the depot and we pick up next working past New Cross Gate or Surrey Quays. Usually means we can get the service back to normal in about an hour.
I challenge anyone to get a train emptied, refilled, dispatched and away within 45 seconds at London Bridge in the peak![]()
Challenge accepted. For TL core services only from 2018.
(in any event, London Bridge Thameslink services will have a 90 sec dwell time).
I'll hold you to that as I see no way that the TL core will run close to time after it is fully opened. Just getting the trains as far as the core on time will be an achievement but loading and unloading passengers at central stations seems fantasy land!
When you see inside the train, you will get an idea of how it will work. But you are right, the challenge is getting them to the core on time.
Having you to traveled on tube trains I know what it's like. Train arrives slightly late and everyone gets on. Takes longer which delays it and in turn delays the ones behind.
If they alter the timetable to increase dwell time doesn't that mean a lower frequency of trains?
Perhaps what they'll actually end up doing is employ lot's of staff to either a) push people onto the train (I've seen a video of this somewhere - think it was in Japan?) or b) shout at people to move down the platform.
I actually think it should be against the rules to block deliberately the doors.
My sister was on a train recently which was stuck at London Bridge for over 5 mins (I think it was closer to 10) and she said it was all down to one man who was blocking the doors and refused to leave the train when it was quite clear he wasn't going to be getting on!
The planned dwells are 60 seconds in the core, 90 seconds at London Bridge under normal operation.
45 seconds will only be used in times of disruption.
If you time the dwells today (and I have, repeatedly, for 2 years), trains normally have station duties complete within 45 seconds, even in the peak. The exception is St Pancras where it is sometimes, but by no means always, around a minute in the peak, often due to luggage (and people) left in doorways slowing the alighting / boarding process at one or two sets of doors. The other exception is wherever a Class 377 changes power, which is never less than 75 seconds, and often up to 120. That won't be a problem with the new trains.
I have regulalrly timed dwells under 20 seconds in the peak when trains are running slightly late; there is no reason to believe this will be any worse in 2018 with high capacity trains, big doorways, better CIS and more staff on the platforms 'offering advice' at a decent volume.
They wont be able to hold trains back because they will have their allocated slot on the Mainlines at either end, the tube is easy because all trains go to the same place, that wont be the case on Thameslink 2000, the timetable might work on a computer where the crowds will all be spaced out on the platforms and trains which simply wont be the case in the real world.
I am with A Driver on this and the timetable will very quickly be altered to increase the dwell times in the core because this 45 second stuff is dreamworks quality stuff.
The planned dwells are 60 seconds in the core, 90 seconds at London Bridge under normal operation.
45 seconds will only be used in times of disruption.
If you time the dwells today (and I have, repeatedly, for 2 years), trains normally have station duties complete within 45 seconds, even in the peak. The exception is St Pancras where it is sometimes, but by no means always, around a minute in the peak, often due to luggage (and people) left in doorways slowing the alighting / boarding process at one or two sets of doors. The other exception is wherever a Class 377 changes power, which is never less than 75 seconds, and often up to 120. That won't be a problem with the new trains.
I have regulalrly timed dwells under 20 seconds in the peak when trains are running slightly late; there is no reason to believe this will be any worse in 2018 with high capacity trains, big doorways, better CIS and more staff on the platforms 'offering advice' at a decent volume.
That won't be a problem with the new trains.
What makes you say that?
Do the new trains not need to switch or is it somehow quicker?
Are there more platforms at voltage switchover points? I thought it was 2 platforms all the way through the core but I've actually never been through so maybe I'm wrong.