There is a daytime run booked for this Thursday from Preston to Oxford Road and back. It is running as a launch train for invited guests, media etc. It is reportedly going to stand at Oxford Road for those guests to partake of a lunch reception and allow time to "admire" the new train. I've not seen the unit recently so not sure of its current livery but I would have thought if it was going to be branded it would be done by then.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
There is a daytime run booked for this Thursday from Preston to Oxford Road and back. It is running as a launch train for invited guests, media etc. It is reportedly going to stand at Oxford Road for those guests to partake of a lunch reception and allow time to "admire" the new train. I've not seen the unit recently so not sure of its current livery but I would have thought if it was going to be branded it would be done by then.

So it didn't fall down then?
--- old post above --- --- new post below ---
Article includes picture of 350 operating on the route.


http://www.networkrailmediacentre.c...phase-of-North-West-electrification-1f44.aspx

Electric trains have started to operate over the railway between Newton Le Willows and Castlefield junction outside Manchester Piccadilly, marking the commissioning of the first phase of the £400m North West electrification project on time and under budget.

The commissioning of new electrical infrastructure on part of the world's oldest public railway between Newton Le Willows and Castlefield Junction marks a major milestone in the project which will see over 350km of track upgraded across the north of England delivered by December 2018.

Dyan Crowther, route managing director, Network Rail, said: “Electrification of key routes in the North West will significantly improve connections between our major towns and cities, boosting the economy and providing passengers with quicker, cleaner and more frequent services provide the railway that the region’s passengers want and its economy needs.

“This is the first railway line to be electrified in England in over a decade. We have delivered this complex project, using modern standards and state-of-the-art technology, in four years from inception. We will continue to replicate the successful delivery of electrification across the North West which will be completed in phases by December 2016.”

Rail minister Stephen Hammond said: “This is the latest step in delivering an ambitious plan to electrify the national railway infrastructure across the north. I am pleased that soon passengers on the Manchester to Glasgow and Edinburgh line will enjoy the benefits electric trains can deliver including faster journey times and more reliable services.”

Chris Nutton, programme director, First TransPennine Express, said: “This is a significant and important milestone which marks the start of a major improvement programme which will bring great benefits to the north of England.

“FTPE has delivered a £60m investment in a fleet of electric trains that will start to come into service in a few weeks and will mean a 30% increase in capacity across our network. Customers will benefit from more journey options, faster trains and better connectivity and accessibility. The procurement of these additional 40 carriages, alongside the North West electrification programme, is a great example of the industry working together and shows our commitment to providing the best possible rail travel for customers now and in the future.”

The next major improvements will arrive in December 2014, when electric trains will be able to run from Liverpool to Manchester via Newton le Willows and Wigan and from December 2016, when they will run between Preston and Blackpool, Manchester and Preston and Manchester and Stalybridge. This will be followed by the completion of trans-Pennine electrification from Stalybridge through Huddersfield on to Leeds, York and Selby by December 2018.

Notes to editors

The North West electrification programme is being delivered in five phases between December 2013 and December 2016:

Phase 1: Between Castlefield Junction and Newton Le Willows by December 2013
Phase 2a: Between Liverpool and Newton Le Willows
Phase 2b: Between Huyton and Wigan
Phase 2c: Between Ordsall Lane and Manchester Victoria, all by December 2014
Phase 3: Preston to Blackpool, by May 2016
Phase 4: Manchester Victoria to Preston (Euxton Junction), by December 2016
Phase 5: Manchester Victoria to Stalybridge, Guide Bridge to Stalybridge, December 2016
Key facts for North West electrification:

Overall cost of North West electrification programme: £400m
Cost of phase 1 including bridge work: £60m
Route km electrified: 24.3 km
Track km: 58 km
Number of bridges rebuilt: 3
Number of bridges where track was lowered: 5
Number of new foundations for overhead stanchions: 517
Number of overhead stanchions erected: 650
Km of overhead copper cable installed: 118 km
Km of aluminium cable installed: 92 km
Electrification distribution sites: 2
First TransPennine Express will start running direct electric services using 10 new Siemens-built Class 350/4 from Manchester Airport to Glasgow from the 30th December. These new trains will deliver an increase in capacity of more than 80 per cent on this route. The new 100mph, Class 350/4 trains will each have four carriages and a total of 210 seats, 19 of which will be first class.

North West electrification is part of Network Rail’s plan for the north of England, which includes the electrification of key rail routes, the £44m project to transform Manchester Victoria station and the building of the Northern Hub which will create space for faster, more frequent trains to connect key towns and cities in the north of England. http://www.networkrail.co.uk/north">http://www.networkrail.co.uk/north" href="http://www.networkrail.co.uk/north">www.networkrail.co.uk/north

The last significant electrification in England was between Kidsgrove and Crewe as part of the West Coast Main Line upgrade in 2003.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
Travelled over the Parkside-Golborne curve today for the first time, on a 185.
With the 60mph dawdle over the Moss, approach control at Parkside (conflicting with an eastbound ATW service) and the 15/20mph crawl between the two junctions, it's not what you would call an "electrifying" (:oops:) ride.
Predictably there were some incredulous Bolton types on board, despite very clear announcements on the platform and on board that it would not stop at either Bolton or Chorley.
They were told to change at Wigan, but in fact they stayed on for Preston!

A 350/4 was waiting on the Up Fast at Golborne for us to pass.
I see this was on a Carnforth-Crewe test run.

There is no doubt Wigan gets a good uplift with this service.
My train was to Barrow rather than Scotland.
Must be a while since there were through trains Wigan-Barrow.

Nothing new to report on Phase 2 into Liverpool, but bases and masts continue to multiply.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,315
I wouldn't really call Kidsgrove-Crewe 'significant'.... but there we go.

I believe the last actually significant project was Heathrow express under BR.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
There is a daytime run booked for this Thursday from Preston to Oxford Road and back. It is running as a launch train for invited guests, media etc. It is reportedly going to stand at Oxford Road for those guests to partake of a lunch reception and allow time to "admire" the new train. I've not seen the unit recently so not sure of its current livery but I would have thought if it was going to be branded it would be done by then.

Wonder if First will take the opportunity to launch their new livery too?
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
From that NR timetable, has Blackpool slipped a few months? Says May 2016 but I thought they brought it forward to Dec 2015 when they swapped its completion order with Bolton.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
No sorry Paul seems to be being kept very quiet, however with recent whisperings I wouldn't be surprised if the do launch their new livery on this special 350 run
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
I wouldn't really call Kidsgrove-Crewe 'significant'.... but there we go.
I believe the last actually significant project was Heathrow express under BR.

Closely followed by the North London Line (mostly replacing 3rd rail Acton-Camden, but Mitre Bridge-Willesden HL was new and gave us NLL/WLL through services).
Also Airdrie-Edinburgh and Paisley Canal (but that's Scotland so doesn't count).
The new ELL 3rd rail too, but I suppose that is down to TfL.

From that NR timetable, has Blackpool slipped a few months? Says May 2016 but I thought they brought it forward to Dec 2015 when they swapped its completion order with Bolton.

It was indeed Dec 2015 initially, but they slipped it back so that NR could resignal and upgrade the line first.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,652
Location
Nottingham
Closely followed by the North London Line (mostly replacing 3rd rail Acton-Camden, but Mitre Bridge-Willesden HL was new and gave us NLL/WLL through services).

What about HS1? That's in England but not part of Network Rail (or at least not part of that part of Network Rail).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,681
Travelled over the Parkside-Golborne curve today for the first time, on a 185.
With the 60mph dawdle over the Moss, approach control at Parkside

Should be 75 over the Moss to Astley and 90 after unless it didn't get commissioned. Parkside is always going to be approach controlled, nowt you can do about that.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Press release

Electric trains have started to operate over the railway between Newton Le Willows and Castlefield junction outside Manchester Piccadilly, marking the commissioning of the first phase of the £400m North West electrification project on time and under budget.

The commissioning of new electrical infrastructure on part of the world's oldest public railway between Newton Le Willows and Castlefield Junction marks a major milestone in the project which will see over 350km of track upgraded across the north of England delivered by December 2018.

[snip]

The North West electrification programme is being delivered in five phases between December 2013 and December 2016:

Phase 1: Between Castlefield Junction and Newton Le Willows by December 2013
Phase 2a: Between Liverpool and Newton Le Willows
Phase 2b: Between Huyton and Wigan
Phase 2c: Between Ordsall Lane and Manchester Victoria, all by December 2014
Phase 3: Preston to Blackpool, by May 2016
Phase 4: Manchester Victoria to Preston (Euxton Junction), by December 2016
Phase 5: Manchester Victoria to Stalybridge, Guide Bridge to Stalybridge, December 2016

[snip]
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
Off the NR webiste:
displaymedia.ashx


Love it!!
 
Joined
6 Jan 2011
Messages
59
Location
Lancashire north of the sands
I was travelling south from carlisle a couple of tuesday's ago on a pendolino when we passed a london midland train around oxenholme sat in a loop and then it passed us again in lancaster station heading south

Was this anything to do with testing for the electrification in the area?
I don't know what class it was and i didn't even notice if it had the pantograph up on it.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
I was travelling south from carlisle a couple of tuesday's ago on a pendolino when we passed a london midland train around oxenholme sat in a loop and then it passed us again in lancaster station heading south

Was this anything to do with testing for the electrification in the area?
I don't know what class it was and i didn't even notice if it had the pantograph up on it.

Class 350 on hire basically being used to train TPE drivers before electric services commence.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
Forgive my local ignorance, but where's the Parkside-Golborne curve?

It's the east-to-north side of the triangle east of Newton-le-Willows on the Liverpool & Manchester line via Chat Moss.
It connects the L&M with the West Coast Main Line at Golborne Jn.
It has been little used in recent decades, but has now been electrified so that Manchester-Wigan-Preston trains can go this way instead of via Bolton.
As well as being part of the first route to the north, Parkside is also the place where William Huskisson MP for Liverpool was run down by the Rocket on the opening day of the L&M in 1830.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Last edited:

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,398
Location
Dover
It's the east-to-north side of the triangle east of Newton-le-Willows on the Liverpool & Manchester line via Chat Moss.
It connects the L&M with the West Coast Main Line at Golborne Jn.
It has been little used in recent decades, but has now been electrified so that Manchester-Wigan-Preston trains can go this way instead of via Bolton.
As well as being part of the first route to the north, Parkside is also the place where William Huskisson MP for Liverpool was run down by the Rocket on the opening day of the L&M in 1830.
Thanks :)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
NR presentation you might find interesting, starts with some shots of the electrification works then later has a concept diagram for revised Salford Central layout (surprised how far they propose relocating the platforms) and a render of Piccadilly platforms 15&16.

Thanks for this. Interesting stuff.
To be picky:
No intermediate dates given for NW Phase 2/3, just 2016 for the lot.
The trains in the new Piccadilly platforms look suspiciously like 313s...
I didn't see a Salford Central diagram, just Oxford Road and Picc.
It's a shame the Yorkshire planned work is "tbc".
It's time there was some more detail about TP electrification.
 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
NR presentation you might find interesting, starts with some shots of the electrification works then later has a concept diagram for revised Salford Central layout (surprised how far they propose relocating the platforms) and a render of Piccadilly platforms 15&16.

I think the concept diagram is Oxford Road not Salford Central
.
 

Eltonhead

New Member
Joined
10 Dec 2013
Messages
3
And if any one is interested they have put bases in for the gantries last week and starting the new fence on Thursday is it just me that thinks its a shame that this historic site will never look the same again once gantries are up
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
And if any one is interested they have put bases in for the gantries last week and starting the new fence on Thursday is it just me that thinks its a shame that this historic site will never look the same again once gantries are up

There are so many historically sensitive sites along the L&M that I don't think it can ever look the same. However, when I made a systematic visit 18 months ago, along the entire route, many of the historic structures were in a terribly run down state after years of neglect. The Sankey Viaduct for one was a sad sight from ground level. I could only hope they might benefit from cleaning and a tidy up along with the electrification work.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
And if any one is interested they have put bases in for the gantries last week and starting the new fence on Thursday is it just me that thinks its a shame that this historic site will never look the same again once gantries are up

And welcome to the forum. I grew up on a farm in Lymm next to the Warrington-Timperley line. Not quite as historic as yours!

I did notice that miles of new metal fencing has been erected east of Parkside on both sides of the track, even through the remote part of Chat Moss.
I guess this is all part of the rules for electric lines.

Near Rainhill, there is a stretch of National Grid power line very close to the track. (It spoilt my photos during the 1979 cavalcade!).
I did wonder if that would impact the OHLE in that area.

There are still some characterful platform buildings which I would hope can be better presented.
At Earlestown, the "Railway" pub opposite the station carries some interesting heritage signs, but on closer inspection one looks as though it is a GC locomotive, and the main one is of a GWR Hall!
Not too authentic. One of "Lion" would be nice.

Personally I like the magnificent stonework of the original sandstone overbridges near Rainhill, some on the skew.
The vegetation in Olive Mount cutting is now being removed.
It's going to look very bare and clinical soon.
 
Last edited:
Status
Not open for further replies.

Top