Do you have any detailed plans for Ferrytoll? Halbeath is just going to add time to journeys, the X24/6/7 from Glenrothes and Kirkcaldy take long enough already without 10 minutes going in and out of there. X59 only from Halbeath, or half hourly from Glenrothes?
It would seem a bit of a waste moving the Airport bus to Halbeath as it will still have to go into Inverkeithing Station anyway.
I've seen the detailed plans for the ferrytoll a while back, it all tides into the new road layout and bridge etc. From what I can remember that turning circle is going. Roundabout outside the ferrytoll will be the new junction to link up with Ferrytoll road, to replace the one further south.
I don't believe there has been able changes to them since then, i need to double check.
From what I have heard it X59 will just be half hourly from Halbeath.
Airport route: Halbeath - B981 - Inverkeithing - Ferrytoll - Airport. This would free up much needed space during the works, since the Ferrytoll is NOT closing at any point. It would also mean its closer to cowdenbeath depot
Did you know the land adjacent to Halbeath P&R has plans for a new bus depot if Stagecoach needed/wants it.