Theres three lines between Wigan and Manchester, take one out and you still have two left.
Of course you are most correct with your assertion, but the other line via Chat Moss is rather further south than the other two lines and I had in mind:-
A)...There are public transport links from the Atherton line stations to Bolton and to Westhoughton for passengers affected by diversionary engineering works, whereas the public transport links from the Chat Moss line after Patricroft and before the next station at Newton-le-Willows, to those two areas on a similar basis, are few and far between with a much greater travelling distance involved.
B)...I must confess to thinking ahead and wondered how many spare pathways will exist on the Chat Moss line once the electrification of the line has been completed and the new service pattern is fully running.
Had you any thoughts on the final part of my previous posting with regard to the heavy-rail link from Swinton to Leigh
mentioned by a previous poster, where I mentioned the incompatibility of heavy rail and Metrolink units using the same track. The cost of this project to full heavy rail standards surely must be prohibitive for the amount of an annual financial return from fares. The words "cost" and "benefit" do indeed spring to mind here.