• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

XC Voyager Refurbishment

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,241
I was hoping they would have started last autumn
They’ll be waiting on the entire years delay compared to the original milestones, probably be easier to amend the plan that way. o_O But yes, ‘late 2024’ was the publicised start date, eg post #65 back in Feb 24.
 

60maniac

Member
Joined
23 Aug 2011
Messages
10
I was hoping they would wait until autumn. Presumably the summer holidays are the busiest period.
Probably making the most of the Stockport blockade, I understand they're not running a full service because of it.
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
755
Location
Warrington
Still don't understand how the first units always seem to take so long for what is basically a strip out, paint and refit with new components.
I think 220033 is already stripped out. It was in one of the sheds at the greatest gathering with its insides gutted and one of the driving cars detached from the set.
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
Just out of curiosity, has something specific caused these major issues or is it simply the train equivalent of wear and tear?
I can think of another voyager I drive that is known for electrical gremlins. Spending time out of use certainly isn't good for these units.
 

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
2,476
I assumed the first one was the trail blazer for the 'on-board technology enhancements' so it was expected to be an up hill struggle. I suspect once the solution is documented, the following Voyagers will be much quicker.
 

Travelmonkey

Member
Joined
16 Aug 2023
Messages
773
Location
The Midlands
I assumed the first one was the trail blazer for the 'on-board technology enhancements' so it was expected to be an up hill struggle. I suspect once the solution is documented, the following Voyagers will be much quicker.
Indeed, same was the case for avanti and their pendalino refresh. As the old proverb goes "Rome was not built in a day" I know the ex Avanti voyagers got a soft touch refurb while the 80x to replace them were in build. And it's much nicer on one of them former west coast sets.
 

E B

Member
Joined
30 Oct 2024
Messages
391
Location
Nuneaton
So it could be May 2026 before we see the first refurbished Voyager. Potentially up to 9 months for a 4 car unit.
 

GoneSouth

Established Member
Joined
17 Dec 2018
Messages
1,474
Refurbishment of 220033 is now expected to be complete by Spring 2026:


From https://www.crosscountrytrains.co.u...ntry-confirms-december-2025-timetable-changes
Thanks for the link, there’s a lot of guff on that page about increasing the number of services between Reading and Newcastle but hilariously they claim this:

Passengers travelling on Sundays will also see more resilient and reliable services across the CrossCountry network
How do they propose to do this. Are they going to rip up contracts and just ignore that Sunday is treated differently? Have they suddenly appointed new recruits who are fully trained and ready to go and are on contracts that make them work on Sunday? Have they forgotten there’s a lot more disruption coming at weekends with Saturday strikes?

Does anybody know if all the Avanti units are in service yet? If not, I assume the increase in Reading-Newcastle is taking away from other overcrowded routes?

Shiona Rolfe, Managing Director at CrossCountry, said: “The December 2025 timetable marks the reintroduction of important CrossCountry services between Reading and Newcastle, as well as between Birmingham and Leicester. These changes will help us continue delivering reliable, comfortable journeys for our customers, while supporting the wider transformation of the timetable on the East Coast Main Line.”
 

sufian123

Member
Joined
1 May 2017
Messages
1,182
Location
Birmingham
Thanks for the link, there’s a lot of guff on that page about increasing the number of services between Reading and Newcastle but hilariously they claim this:


How do they propose to do this. Are they going to rip up contracts and just ignore that Sunday is treated differently? Have they suddenly appointed new recruits who are fully trained and ready to go and are on contracts that make them work on Sunday? Have they forgotten there’s a lot more disruption coming at weekends with Saturday strikes?

Does anybody know if all the Avanti units are in service yet? If not, I assume the increase in Reading-Newcastle is taking away from other overcrowded routes?
Yes all the Avanti ones inherited by XC are in service 221107-221118
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
Doesn't bode well for the rest of the fleet then, if one has electrical issues, it would be surprising if the rest of the fleet doesn't.
Most of the fleet doesn't to be fair. The units that do have electrical issues tend to get them quite badly though.
 

Top