Some clarification. I know the 10 reasons. But in AB and even TCB land can you authorise a WDM across two or more areas or are the 10 reasons listed in TW7 only in your area of control - or if in the block back to your area of control?
I know there are rules in both TS2 and TS3 for working in the wrong direction where permission has to be obtained from Ops Control and with AB various bell codes are needed.
But can Op Control authorise a WDM to take place in AB from one signal box to the other? Or is this a no no. Has I can't find any mention in the rule book. I am puzzled as if you can - I don't see why you need the Working in the wrong direction rule for failed trains - being that one of the reasons you can do a WDM is to assist a failed train or evacuate passengers.
Anyway, all discussions welcome and any reference to the rule book most appreciated.
I know there are rules in both TS2 and TS3 for working in the wrong direction where permission has to be obtained from Ops Control and with AB various bell codes are needed.
But can Op Control authorise a WDM to take place in AB from one signal box to the other? Or is this a no no. Has I can't find any mention in the rule book. I am puzzled as if you can - I don't see why you need the Working in the wrong direction rule for failed trains - being that one of the reasons you can do a WDM is to assist a failed train or evacuate passengers.
Anyway, all discussions welcome and any reference to the rule book most appreciated.
