and did someone mention in another thread about a south to north premier class starting aswell, running opposite to the current one aswell.[/QUOTE]
Yes the Minister is wanting to start a South/North premier service, but not before it can travel via Wrexham, due to the North/South outcry via Crewe.
ill try and find the minute from the WAG statement.
--- old post above --- --- new post below ---
Don't be so sure. Here's a short timeline of the Ebbw Vale reopening:
- 1991: Consultation reccomends reopening portions to passenger traffic
- 2001: With Corus steelworks closing, a report proposes the current two-stage plan
- 2002: Restored train service is part of an economic recovery package for the area
- 2005: Work is yet to start, forecasts suggest may be another two years
- 2006: Start of main works
- December 2007: Line due to reopen. Wasn't ready, though.
- February 2008: First hourly services, to Cardiff only.
- April and June 2008: Llanhilieth and Crosskeys stations are completed
- 2009: Redoubling for Newport services due to be completed by 2011
- ????: Connection to Abertilerry reinstated?
Fair enough Krus,but the Euro Dosh was found, Dec 07 to Feb 08 was a major cock up, you may recall the good and the mighty were invited to the opening
with a WAG sized lunch, er two days before the opening letters were sent out
please dont turn up, due to problems we can not open the line(NR etc.
would not sign it off) One First Minister was not impressed.
However there have been other rail spends in the South given preference
to the North, I just ment if there was a need for a double track in the South
experience says politics would have got it funded.