• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Wouldn't it be nice if...

Status
Not open for further replies.

crewmeal

Member
Joined
1 Dec 2007
Messages
462
Location
Birmingham
I was just watching the news and saw that the poor people who have been suffering with all the flooding problems in Cumbria area. Because of various bridges collapsing they have to endure a dreadful and uncomfortable journey by a 2 car DMU of sorts.

Wouldn't you think that management would do something about that and supply a proper train of a decent length for the foreseeable future so they could travel in comfort and safety? Surely there are enough carriages/stock available at this time of the year.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
It certainly would be nice. Impractical though.

If Northern are going to strengthen services using their own stock they would just be robbing Peter to pay Paul. All TOC's utilise their stock to maximum advantage so there are no great reserves of units sitting around with nothing to do. If Northern wanted to spot-hire trains from elsewhere you get problems with traincrew knowledge. It's not cheap or quick either.

Besides, the railways are themselves suffering as a consequence of the floods.

O L Leigh
 

A60K

Member
Joined
26 Jun 2008
Messages
1,030
Location
Kilburn
The only thing that Northern can realistically do in the short-term is to get a 153 or 156 that might be in depot for scheduled maintenance, or possibly switch around some 3 car diagrams to 2 car to free up a 153. As O L Leigh says there's basically no spare stock, and anything borrowed will leave a deficit somewhere else.
Edit: think there's a Settle & Carlisle diagram with a 153 and a 2 car 158 (leaving Leeds around 9am and Carlisle around 12 noon), it might be possible to take the 153 from that given that the S&C will be fairly quiet for the winter. However the 153 might be needed in the peak around Leeds.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,558
Northern are adding a coach to some services on the coast to help alleivate the problem, although in the grand scheme of things I think a busy train is low on peoples priority list at the moment - at least they still have a bridge for the railway to cross! Northerns fleet is stretched at the best of times so this will be no mean feat to pull off.

Just seen on BBC that Network Rail are to construct a temporary two platform station on the north side of the towns railway bridge to reconnect the people on that side to the rail network. The station will have lighting, waiting rooms and a footbridge construction is reported to begin tonight and should be open by the end of the week.

http://news.bbc.co.uk/1/hi/england/cumbria/8375981.stm
 
Last edited:

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Just seen on BBC that Network Rail are to construct a temporary two platform station on the north side of the towns railway bridge to reconnect the people on that side to the rail network. The station will have lighting, waiting rooms and a footbridge construction is reported to begin tonight and should be open by the end of the week.

I think that is absolutely superb news for the local community in that area and those who are involved in making this happen (from Management to the guys on the "floor") should be commended for thinking outside the box during a time of great need for the public.

I would be one of the first people to have a go should anything go wrong with the rail network so I would like to be one of the first to offer praise and big pats on the back :D
 

Oliver

Member
Joined
17 Aug 2007
Messages
477
I think that is absolutely superb news for the local community in that area and those who are involved in making this happen (from Management to the guys on the "floor") should be commended for thinking outside the box during a time of great need for the public.

I would be one of the first people to have a go should anything go wrong with the rail network so I would like to be one of the first to offer praise and big pats on the back :D

Likewise; it's a rare outbreak of common sense and practical action.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,318
Location
Yorks
Perhaps HM Government could hire some carriages and loco's from West Coast railways at Carnforth and top and tail some extra trains :)
 

mallard

Established Member
Joined
12 Apr 2009
Messages
1,304
What happened to the units freed up by the closure of the Oldham loop?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,318
Location
Yorks
I think some are being used to strengthen Rochdale - Victoria services.
 

Dennis

Established Member
Joined
8 Aug 2005
Messages
2,676
Location
Trowbridge
Just seen on BBC that Network Rail are to construct a temporary two platform station on the north side of the towns railway bridge to reconnect the people on that side to the rail network. The station will have lighting, waiting rooms and a footbridge construction is reported to begin tonight and should be open by the end of the week.

http://news.bbc.co.uk/1/hi/england/cumbria/8375981.stm

Thought it took about eight years to build a station! That's impressively quick.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
Wouldn't you think that management would do something about that and supply a proper train of a decent length for the foreseeable future so they could travel in comfort and safety? Surely there are enough carriages/stock available at this time of the year.
to quote from this morning's announcement from NR:
Working with train operator, Northern Rail, the train service will be strengthened with additional carriages where possible.
 

djw1981

Established Member
Joined
10 Jul 2007
Messages
2,642
Location
Glasgow
Take a unit off maintenance etc, thin out some less used services, try and scam a 156 from FSR to use on the Ncl-Carlisles and free a 156 that way.
 

Bittern

Established Member
Joined
8 Apr 2009
Messages
1,919
Location
Scotland
Northern are adding a coach to some services on the coast to help alleivate the problem, although in the grand scheme of things I think a busy train is low on peoples priority list at the moment - at least they still have a bridge for the railway to cross! Northerns fleet is stretched at the best of times so this will be no mean feat to pull off.

Just seen on BBC that Network Rail are to construct a temporary two platform station on the north side of the towns railway bridge to reconnect the people on that side to the rail network. The station will have lighting, waiting rooms and a footbridge construction is reported to begin tonight and should be open by the end of the week.

http://news.bbc.co.uk/1/hi/england/cumbria/8375981.stm
Well, they're doing the right thing for the right reasons. Props to them.
 

the sniper

Established Member
Joined
4 Sep 2007
Messages
3,498
Thought it took about eight years to build a station! That's impressively quick.

I wouldn't jump the gun, it's not open yet.

No doubt it will be built by Sunday only for some Health and Safety type to turn up and announce that the platform lights are 3mm too close to the line, so risking drivers being blinded. This will lead to 3 months enforced closure and a 6 month, £17million enquiry into what went wrong... :roll:
 

142094

Established Member
Joined
7 Nov 2009
Messages
8,789
Location
Newcastle
I wouldn't be too cynical, fair play to Network Rail for getting the ball rolling so soon and doing something practical. Perhaps all the usual problems like planning, H+S etc have been put aside due to the nature of the situation? Maybe something to into account for future builds?
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,818
Perhaps HM Government could hire some carriages and loco's from West Coast railways at Carnforth and top and tail some extra trains :)

You're not too far from the mark from what I can gather.....;)
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
I've never done this route, would it be unacceptable to turn up to loco bash when so many people are suffering? It's not being laid on for cranks, but if I buy food their and tickets aren't I helping to provide for the businesses and fund the services? Guess it'd be unwise to drive up there though lol.
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,845
Location
Rugby
Before anyone gets too excited you do realise the journey is only about 5 miles each direction and is likely to be full of locals who need to use the service.
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,845
Location
Rugby
A class 37 and 47 is being mentioned
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,845
Location
Rugby
ok, is it going to run on saturday?

No idea. I doubt it as its for people getting to work/school etc so there won't be as great demand on a weekend.
 

37401

Established Member
Joined
12 Nov 2008
Messages
3,276
Location
Birmingham
ok, 4hrs+ doesnt sound all that great for 5 miles behind a 47 or 37, maybe ill just have to wait for a flood between Sutton coldfield and birmingham
 

brompton rail

Member
Joined
28 Oct 2009
Messages
754
Location
Doncaster
Where does Northern's news item mention loco hauled stock?

The News says that a working from Carlisle will stop short at Workington and then dun back to Maryport, back to Workington and resume its normal return working to Carlisle. Those wishing to travel on to Whitehaven (the normal destination for this train will continue by road coach.
 

Greeny

Member
Joined
25 Nov 2009
Messages
151
Location
North West
I rather think you have a good point - sadly, the TOC's seem to see it as extra expense, though I'd have thought that the potentially good publicity would off set that.

G
 
Last edited:

37401

Established Member
Joined
12 Nov 2008
Messages
3,276
Location
Birmingham
my gen is telling me DRS 47 and 37423 so yes its Loco hauled on those runs but unit after the coach
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
I wouldn't be too cynical, fair play to Network Rail for getting the ball rolling so soon and doing something practical. Perhaps all the usual problems like planning, H+S etc have been put aside due to the nature of the situation? Maybe something to into account for future builds?

You think that they're going to put Health and Safety to one side to build a railway station. You're 'aving a laugh. It's being built with full health and safety rules in place as per other construction sites/railway property.

There have already been enough death and heroics over the floods, we're not going to lose another person to save someone else a few quid on a construction project.

Consultation has been put to one side as has many of the planning checks. Health and Safety is on full steam ahead.
 
Status
Not open for further replies.

Top