matt_world2004
Established Member
- Joined
- 5 Nov 2014
- Messages
- 4,581
Didn't some of the Elizabeth line trains in tests get closer than this
DO you have any information on how tall the fencing is? I've been unable to find a clear picture.
What on earth did he do that for?Was that similar to the one at guide bridge where the signal man tried to beat the interlocking?
Basically, to speed things up. The report is on Railways Archive.What on earth did he do that for?
At Wickford (Essex) many moons ago the signalman found that he could pull a lever when he shouldn't have been able to. He called the technician who expressed doubt - so the signalman showed him and promptly derailed a train.What on earth did he do that for?
Probably this one https://www.railwaysarchive.co.uk/documents/DoE_Audenshaw1970.pdfWas that similar to the one at guide bridge where the signal man tried to beat the interlocking?
The mind boggles why someone would want to do that.Probably this one https://www.railwaysarchive.co.uk/documents/DoE_Audenshaw1970.pdf
There was a fatal derailment at Connington South, near Huntingdon on the ECML, in 1967 in which it appears a young signalman (aged 20) deliberately moved the points under a train (possibly with the intention of moving them to "reversed" and back to "normal" between the passage of the two bogies of one carriage over them, to prove that he could?)
There was a fatal derailment at Connington South, near Huntingdon on the ECML, in 1967 in which it appears a young signalman (aged 20) deliberately moved the points under a train (possibly with the intention of moving them to "reversed" and back to "normal" between the passage of the two bogies of one carriage over them, to prove that he could?)