thenorthern
Established Member
- Joined
- 27 May 2013
- Messages
- 4,710
The Cross-City Line must be one of the largest for cancelations simply because there are a large amount of trains and skipping stops isn't that uncommon and counts as a cancelation.
I suggest you do one of two things:-
(1) Devise a method to stop leaves falling from trees
(2) You go to Clown Depot and do the job of making them fit yourself.
You haven't grasped my point at all so for the benefit of the forum I'll leave it here.
I'll leave it here as well because you don't appear to understand problems and the reasons behind them.
One more point, I'm not a clueless enthusiast, I have been employed in the rail industry in Anglia for a number of years now so I do understand the issues very clearly. Done.
Now I'm very very confused. If you are a railway professional yourself then surely you know exactly why there is the current major DMU shortage and the reasons for it? Yes there is a very valid argument that a depot like Crown point should have its own wheel lathe. But thats for the govt to specify in the franchise that the TOC should build one! And on the subject of the govt it is arguably the DFT's fault the we are in the situation with the critical DMU shortages as it is. They seem far more interested in their shiny new IEP projects and Thameslink to realise the mass cancellations that are going on because of DMU shortages.
The current stock of DMU's in the east is far less than is actually needed but because there is a shortage of DMU's nationwide. The Govt refuses to order any new DMU's because of their mass electrification plans which are way over budget and taking far far longer than they said they would. All in all it creates one big mess but of course it's never ever the politicians fault! And the fact that the 153/156 WSP equipment is pretty terrible and they work on very remote lines means they are far more susceptible to wheel flats.
And I'm still trying to figure out where this mass mismanagement of the situation you claim comes from?
:roll: I have not denied the nationwide shortage of DMUsMy sole point is that AGA have enough units to cover the issues were longer running mechanical problems resolved in a reasonable timescale. That is the mismanagement, more funding required for maintenance to avoid issues with availability.
A wheel lathe would be useful yes. As would loads of new units. Neither are going to happen soon and the situation needs to be more closely controlled to avoid failing to provide a service for extended periods which I'm sure we all agree is not acceptable.
But your argument doesn't hold water at all though. They don't have the units to cover. Units are patched up and put back into service because they simply haven't got they spare units to cover while they are out being repaired.
How does maintaining units to avoid shortfalls not add up? :roll: If there aren't enough units then the company needs to look into other options, the issues with that have been discussed at length and don't need to be covered again, something could be sorted such as more spot use of an East Mids 158 (one took a trip to Sheringham recently) There are solutions out there. So we come back to the situation not being managed.
Other TOCs nationwide have been dealing with the same DMU issues, the same excessive railhead contamination and yet still manage not to totally shut two branches and significantly reduce service on the others.
Don't count me as one of the many Abellio bashers I'll credit and criticise where necessary.
A Train Operating Company failing to provide a train service equates that said company is not properly managing its affairs.
Shall we leave it there you clearly just don't understand the issues which is surprising and we are going round in circles.
Any Southern service west of Havant is liable to get cancelled as soon as trouble hits further up the line.
Optimism sadly misplaced, I'm afraid. 12 hours after we discussed this, the morning peak service today (Tue 17 Nov) is again "No Bakerloo Line north of Queens Park.North of Queens Park has behaved in recent months.
It's a few years ago now, but when services from the Cambrian and Shrewsbury terminated at Birmingham New Street, they had a tight turnaround. If an incoming service was late (which, with the single-track Cambrian, can happen often) it would generally be turned at Wolverhampton to get it returning on time, much to the frustratioon of passengers in Birmingham. Services now run through to International and have nearly an hour's layover, which has solved this issue, at the cost of an extra diagram.
Or did you have something else in mind?
First 4 services on the Barton Line cancelled again today I see.
Marston Vale and Borderlands seem to suffer a fair bit, due to little or no slack in the local fleet (both) and tight turnarounds at each end (Borderlands).
Was just about to mention Borderlands. Been watching the delays, often seem to be crew change issues at Wrexham General or simple unit faults.
The crew change issues are directly related to poor diagramming (insufficient slack) of staff travelling pass from Chester to Wrexham on Cardiff bound trains, often delayed. The repeated engine failures, and vehicle faults on the 150s are entirely avoidable.
It's a shame this 'oddball' line isn't in a more local franchise to the area, either Northern or Merseyrail, where (proper) maintenance and traincrew depots aren't the other end of a country. :roll:
Yes, I was stuck (again) at Heswall last week.
How are the faults on the 150s avoidable ?
There's a certain tipping point of reliability where your market just gives up, and don't even go to the station any more. This then becomes self-fulfilling, because the management attitude is "well nobody ever uses it anyway, so what's the point".
Why do TPE operate the Barton Line? I see 185s used to do the early run, but that ceased a couple of years back.
On the other end of the Coastway the morning Rye to Ashford shuttles are always the first casualty in the event of 171 issues with customers just expected to wait 30 mins for the next service....and for clarification, that does include trouble up the line in SWT territory as well![]()
![]()
No they don't - they turn around at Birmingham International in 20 minutes and 10 minutes at Aberystwyth.
They do however have a 10-15 minute wait at Shrewsbury in either direction which does allow for recovery.