• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

WMR Class 196 Build and Implementation

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
Why is this? Would it theoretically increase the maximum speed?
No. Just saves fuel i believe. 172’s will still reach 100 comfortably. 196’s are currently governed to 90. No lines they run on have speeds in excess of 90 at present
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
No. Just saves fuel i believe. 172’s will still reach 100 comfortably. 196’s are currently governed to 90. No lines they run on have speeds in excess of 90 at present

Is this true for all 196s? The six units sub-leased for EWR work will need to be 100mph capable.
 
Last edited:

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Is this true for all 196s? The six units sub-leased for EWR work will need to be 100mph capable.
I would imagine so. As I believe newtownmgr has mentioned, the 196s are currently operating in eco mode. Should 100mph capability be required if and when some are needed for EWR, then I'm sure then that can be sorted out in due course.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
Is this true for all 196s? The six units sub-leased for EWR work will need to be 100mph capable.
Yes. To be honest the time savings between 90 & 100 are probably negligible. Not sure of the requirements/line speed on EWR. I’m not sure whether it will be a specific sets going or just 6 sets rotating to/from Tyseley with no change to branding etc.

== Doublepost prevention - post automatically merged: ==

There was one on Saturday. In fairness it was timed for 90mph
That was a short term planning move to put a unit in place following the overtime ban.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Yes. To be honest the time savings between 90 & 100 are probably negligible. Not sure of the requirements/line speed on EWR. I’m not sure whether it will be a specific sets going or just 6 sets rotating to/from Tyseley with no change to branding etc.

== Doublepost prevention - post automatically merged: ==

Line speed on EWR will be 100mph which is why I asked. Trains will be timed for 100. Not sure how or even if the units will be getting to Tyseley currently although I'm fairly sure they will not have WMT branding.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
Line speed on EWR will be 100mph which is why I asked. Trains will be timed for 100. Not sure how or even if the units will be getting to Tyseley currently although I'm fairly sure they will not have WMT branding.
As i said im not sure what’s happening or even when it’s happening. Chiltern will be operating the services on behalf of EWR i believe.
 

GWVillager

Member
Joined
2 May 2022
Messages
863
Location
West Yorkshire
Line speed on EWR will be 100mph which is why I asked. Trains will be timed for 100. Not sure how or even if the units will be getting to Tyseley currently although I'm fairly sure they will not have WMT branding.
There are of course rumours that the 196s won't be used after all. In all honesty I don't think anyone has considered any of this yet, it's an incredibly minor hurdle.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
There are of course rumours that the 196s won't be used after all. In all honesty I don't think anyone has considered any of this yet, it's an incredibly minor hurdle.

Not heard those rumours but I believe they are unfounded. Certainly Chiltern are expecting 196s.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
Not heard those rumours but I believe they are unfounded. Certainly Chiltern are expecting 196s.
The latest issue of Modern Railways states that "sources have suggested the Department (for Transport) is pressing for an alternative plan which would see DMUs from Chiltern Railways' existing fleet operate service instead."
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
The latest issue of Modern Railways states that "sources have suggested the Department (for Transport) is pressing for an alternative plan which would see DMUs from Chiltern Railways' existing fleet operate service instead."

Hahahaha, that's a good one. Chiltern don't have enough units to run their own trains. As I said, Chiltern are currently expecting 196s. If there's a change of plan, they haven't been made aware of it.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
Was supposed to be 2 units going on loan for traction training in Dec. Not heard any different. However it’s now been decided that Snow Hill will learn the units & more units will be required in the west mids from Dec 2024 to cover the Camp Hill work plus other rumoured service expansions. Ultimately Transport for West Midlands will ultimately have a say as they had involvement in the 196 order i believe.

I guess we will have to wait & see as with about 18 months/2 years before any EWR services start Are scheduled to start there will be many rumours & changes.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
Was supposed to be 2 units going on loan for traction training in Dec. Not heard any different. However it’s now been decided that Snow Hill will learn the units & more units will be required in the west mids from Dec 2024 to cover the Camp Hill work plus other rumoured service expansions. Ultimately Transport for West Midlands will ultimately have a say as they had involvement in the 196 order i believe.

I guess we will have to wait & see as with about 18 months/2 years before any EWR services start Are scheduled to start there will be many rumours & changes.
Presumably this means they’re going to do some work on the SHL then? It makes sense given Leamington and Worcester already sign them.
 

GWVillager

Member
Joined
2 May 2022
Messages
863
Location
West Yorkshire
Hahahaha, that's a good one. Chiltern don't have enough units to run their own trains. As I said, Chiltern are currently expecting 196s. If there's a change of plan, they haven't been made aware of it.
I believe this would be after the procurement of new trains for Chiltern. As Newtown says though, we’ll probably just have to wait and see.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
I believe this would be after the procurement of new trains for Chiltern. As Newtown says though, we’ll probably just have to wait and see.

But the new trains won't arrive for 4-5 years, well after EWR services are planned to start.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
But the new trains won't arrive for 4-5 years, well after EWR services are planned to start.
EWR need to get there own units sorted sooner rather than later then I’d suggest. The 196’s are only a short term loan operation to cover the initial Oxford - Bletchley section anyway.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
EWR need to get there own units sorted sooner rather than later then I’d suggest. The 196’s are only a short term loan operation to cover the initial Oxford - Bletchley section anyway.

Oxford - Milton Keynes. It'll be many years before the next section to Bedford is in operation.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
Oxford - Milton Keynes. It'll be many years before the next section to Bedford is in operation.
Will be interesting to see what the frequency of service will be with only 6 x 2 car sets supposedly going on loan.

Transport for West Mids want a 30 min interval service on the Camp Hill formed of 4 cars so will potentially need them for that & they will have priority i’m assuming.
 

GalaxyDog

Member
Joined
7 Jul 2022
Messages
202
As if the Snow Hill lines didn't need any more aspects of operation under the cackhanded WMR crippling its organisation - now it too will suffer the 196s breaking down and unable to do their job atop the timetabling disaster still not fixed or the traincrew shortage issues galore? Good grief. WMR really hates the Dark Side.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,828
Location
Nowhere Heath
It was great to be back out yesterday on a 196, it had felt like many moons had passed since my last one! With winner 196010 showing as allocated to the 1848 Hereford-Birmingham New Street yesterday (14/08/2023), I wolfed my food down and was out for a journey to Malvern Link. It was with 196007, and the 1950 from Hereford was due to be 196005+196012 for anyone curious :)

Attached photo is of 196010 at Malvern Link, just 196011 remains out of the 196/0s to be had :D
 

Attachments

  • 74534CE5-C609-4392-900E-D068BDAACDFC.jpeg
    74534CE5-C609-4392-900E-D068BDAACDFC.jpeg
    3.1 MB · Views: 32

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Will be interesting to see what the frequency of service will be with only 6 x 2 car sets supposedly going on loan.

Transport for West Mids want a 30 min interval service on the Camp Hill formed of 4 cars so will potentially need them for that & they will have priority i’m assuming.

Half-hourly service is planned initially, this has been well discussed elsewhere on this forum. I assume that means most if not all trains will be 2-cars.
 

H&I

Member
Joined
14 Jun 2023
Messages
259
Location
United Kingdom
The Class 196s and 197s don't have level boarding with platforms at the standard UK platform height. Is there a reason why the opportunity for level boarding was missed?
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
The Class 196s and 197s don't have level boarding with platforms at the standard UK platform height. Is there a reason why the opportunity for level boarding was missed?
Just not specified. They could have gone for Stadler Flirts but TfWM or whatever they are called have been pushing for gangway door units.
 
Last edited:

meld3

Member
Joined
28 Aug 2019
Messages
204
Location
West Midlands
The Class 196s and 197s don't have level boarding with platforms at the standard UK platform height. Is there a reason why the opportunity for level boarding was missed?

Which was noticed yesterday at Great Malvern when I had to physically lift an old gent down from 196005.
The height gap was simply unsafe, and I'm 6'4" but still had to jump.
 
Status
Not open for further replies.

Top