WMR Class 196 Build and Implementation

Status
Not open for further replies.

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,929
Location
Telford
I diverted myself specially on a Hereford to Birmingham journey the other day, to go via Kidderminster just to try my luck on the 196s. I had 50-odd minutes to fill in Birmingham, so it just made sense.

Yikes to the bad ride though, I've not yet had a bad 'un but I've probably just tempted fate!
Any news yet regarding a revised date on the 196s being introduced on the Hereford route?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
A trademark of bad build quality is inconsistent build quality.

I've taken just two rides on a 196, both of which incidentally being 196101 sat in the middle of the carriage; The first time was on the first day and it rode OK, but the second time seemed to be quite poor, although I was likely sat in different carriages.

That is pretty poor, something wasn't right for sure then! I didn't get that problem when I had 196101 way back on 25th January 2023. Just went and looked for that in my moves file, and I was perhaps also fortunate to not have the problem when I had it again nearly a month later. Shrewsbury to Shifnal for the first journey there, Wolverhampton to Smethwick Galton Bridge the second.

I also note 101 was my first 196, seems like such a long time ago!

Any news yet regarding a revised date on the 196s being introduced on the Hereford route?

I've no connection to anyone with the gen I'm afraid, @newtownmgr is clearly the person to speak to as his post the other suggests NR are behind on something. If I was to guess, I'd suggest it's not platform extensions although those would be welcome at places like Colwall and Ledbury.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
That is pretty poor, something wasn't right for sure then! I didn't get that problem when I had 196101 way back on 25th January 2023. Just went and looked for that in my moves file, and I was perhaps also fortunate to not have the problem when I had it again nearly a month later. Shrewsbury to Shifnal for the first journey there, Wolverhampton to Smethwick Galton Bridge the second.

I also note 101 was my first 196, seems like such a long time ago!



I've no connection to anyone with the gen I'm afraid, @newtownmgr is clearly the person to speak to as his post the other suggests NR are behind on something. If I was to guess, I'd suggest it's not platform extensions although those would be welcome at places like Colwall and Ledbury.
Not platform extensions & not sure of the issues.
 

GWVillager

Member
Joined
2 May 2022
Messages
864
Location
West Yorkshire
I’m completely uneducated on the whole thing, but I’d assume it was nothing physical, seen as the trains can run the line with testing etc. It strikes me as more likely to be a software problem, though that hardly narrows it down.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,088
Location
"Marston Vale mafia"
A trademark of bad build quality is inconsistent build quality.

I've taken just two rides on a 196, both of which incidentally being 196101 sat in the middle of the carriage; The first time was on the first day and it rode OK, but the second time seemed to be quite poor, although I was likely sat in different carriages.

Different locations makes a huge difference. On 350s for example (which you can never accuse of bad quality) it feels very jiggly and jittery at the vehicle ends but silky smooth if you're between the bogies.
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
I’m completely uneducated on the whole thing, but I’d assume it was nothing physical, seen as the trains can run the line with testing etc. It strikes me as more likely to be a software problem, though that hardly narrows it down.
A software issue wouldn’t be a network rail issue!! The delay is down to network rail. So either paperwork or station signage. I believe it’s been resolved so intro will be in the next week or two hopefully.
 

GWVillager

Member
Joined
2 May 2022
Messages
864
Location
West Yorkshire
A software issue wouldn’t be a network rail issue!! The delay is down to network rail. So either paperwork or station signage. I believe it’s been resolved so intro will be in the next week or two hopefully.
Fantastic! I would have to guess the former, all the stations I’ve seen have been covered in perhaps too many stop markers, posters, ramps and the like
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Different locations makes a huge difference. On 350s for example (which you can never accuse of bad quality) it feels very jiggly and jittery at the vehicle ends but silky smooth if you're between the bogies.
Yes the 185’s aren’t exactly smooth when you throw a junction into the equation.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
A software issue wouldn’t be a network rail issue!! The delay is down to network rail. So either paperwork or station signage. I believe it’s been resolved so intro will be in the next week or two hopefully.

Excellent :)

Thanks for the update :) Here's to the new trains on the Malvern/Hereford route soon :D
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
The WMR May TTC information page seems to say that the 196s will start on the NUCKLE around the 21st May.

Our timetables are changing significantly on the Snow Hill lines from Sunday 21 May 2023. The changes will introduce a more reliable, more consistent and easier to understand timetable for services between Stratford-upon-Avon – Birmingham Snow Hill - Worcester.

Additionally, we’re introducing Class 196 trains to the Leamington Spa – Nuneaton via Coventry line during this timetable and a later last evening service on weekdays between Birmingham New Street – Hednesford.
 
Last edited by a moderator:

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,929
Location
Telford
Yesterday I went to Shrewsbury and had 196110 and 196104 as my units and both were pleasant journeys. Nothing to report wrong although the table on 104 on the way home was breaking already. The top layer was peeling off.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
The WMR May TTC information page seems to say that the 196s will start on the NUCKLE around the 21st May.

Note that it says they will be introduced during the timetable period, which would be anything up to this December:

Additionally, we’re introducing Class 196 trains to the Leamington Spa – Nuneaton via Coventry line during this timetable

...

Leamington Spa – Nuneaton via Coventry

Key changes for this route:
  • New Class 196 trains will be introduced to this line from May 2023 onwards.

Has crew training started at the appropriate depots (Coventry?) to enable the introduction of the class before the end of the year?
 

GWVillager

Member
Joined
2 May 2022
Messages
864
Location
West Yorkshire
I went to Ledbury yesterday and noticed two orange-clad workers erecting the Class 196 ramps, you can see them here. Might this be our reason for the delay?

On a slightly separate note, do they really need that hideously ugly freestanding scaffold? It all feels a bit messy, bordering rushed, I’d be curious to know if the ramps are similarly accommodated on the Shrewsbury line.
 

Attachments

  • 9C9957CB-287D-4611-BCD2-032680E5A3DC.png
    9C9957CB-287D-4611-BCD2-032680E5A3DC.png
    2.9 MB · Views: 151

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
I went to Ledbury yesterday and noticed two orange-clad workers erecting the Class 196 ramps, you can see them here. Might this be our reason for the delay?

On a slightly separate note, do they really need that hideously ugly freestanding scaffold? It all feels a bit messy, bordering rushed, I’d be curious to know if the ramps are similarly accommodated on the Shrewsbury line.
They've done the same with the 196/197 ramps at Hereford. Presumably they've made the frame at HFD due to the buildings being listed.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
Note that it says they will be introduced during the timetable period, which would be anything up to this December:



Has crew training started at the appropriate depots (Coventry?) to enable the introduction of the class before the end of the year?
I've seen some posts from a Senior Conductor on Facebook based at Coventry who posted some pictures from the 196 training, seems to be the only proof of training there is.
 

GWVillager

Member
Joined
2 May 2022
Messages
864
Location
West Yorkshire
They've done the same with the 196/197 ramps at Hereford. Presumably they've made the frame at HFD due to the buildings being listed.
I would say it causes more visual damage than fitting them to the walls. Slightly off topic but is it too hard to design one ramp compatible with everything (or vice versa)?
 

Covshire1

Member
Joined
4 Jan 2018
Messages
303
Excuse my ignorance - what does that diagram cover?
5G01 0523 Shrewsbury Abbey Frgte Cs to Shrewsbury
2G01 0540 Shrewsbury to Birmingham New Street
2J06 0656 Birmingham New Street to Shrewsbury
2G06 0810 Shrewsbury to Birmingham New Street
5H07 0927 Birmingham New Street to Tyseley L.M.D.
5J32 1657 Tyseley L.M.D. to Birmingham New Street
2J32 1726 Birmingham New Street to Shrewsbury
2G27 1840 Shrewsbury to Birmingham New Street
2J40 2004 Birmingham New Street to Shrewsbury
2G33 2140 Shrewsbury to Birmingham New Street
2J46 2256 Birmingham New Street to Shrewsbury
5J46 0011 Shrewsbury to Shrewsbury Abbey Frgte Cs
 

GWVillager

Member
Joined
2 May 2022
Messages
864
Location
West Yorkshire
5G01 0523 Shrewsbury Abbey Frgte Cs to Shrewsbury
2G01 0540 Shrewsbury to Birmingham New Street
2J06 0656 Birmingham New Street to Shrewsbury
2G06 0810 Shrewsbury to Birmingham New Street
5H07 0927 Birmingham New Street to Tyseley L.M.D.
5J32 1657 Tyseley L.M.D. to Birmingham New Street
2J32 1726 Birmingham New Street to Shrewsbury
2G27 1840 Shrewsbury to Birmingham New Street
2J40 2004 Birmingham New Street to Shrewsbury
2G33 2140 Shrewsbury to Birmingham New Street
2J46 2256 Birmingham New Street to Shrewsbury
5J46 0011 Shrewsbury to Shrewsbury Abbey Frgte Cs
Thank you!
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,416
Location
Birmingham
The WMR May TTC information page seems to say that the 196s will start on the NUCKLE around the 21st May.

It says during the timetable so anytime from 21st May to December.

== Doublepost prevention - post automatically merged: ==

Reports from 196/730 Facebook group that 196005/006 have ran the 17:50 Birmingham to Worcester service this evening
(17/04/2023)
 
Last edited:

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,173
Location
West Yorkshire / Birmingham
Anyone know why the return working has gone via the Camp Hill line?

I’ve just walked to Selly Oak to photograph it!

EDIT: I managed to catch the 20:00 departure from Birmingham New Street at Selly Oak, the pictures aren't the greatest due to the disappearing light.
196SLY1.jpg196SLY2.jpg
 
Last edited:

GWVillager

Member
Joined
2 May 2022
Messages
864
Location
West Yorkshire
It says during the timetable so anytime from 21st May to December.

== Doublepost prevention - post automatically merged: ==

Reports from 196/730 Facebook group that 196005/006 have ran the 17:50 Birmingham to Worcester service this evening
(17/04/2023)
Excellent! Presumably this diagram will remain 196s from now on?
 

newtownmgr

On Moderation
Joined
2 Jan 2011
Messages
737
Anyone know why the return working has gone via the Camp Hill line?

I’ve just walked to Selly Oak to photograph it!

EDIT: I managed to catch the 20:00 departure from Birmingham New Street at Selly Oak, the pictures aren't the greatest due to the disappearing light.
View attachment 133234View attachment 133235
Error by signaller. Diverted the wrong 1M80. Driver checked route but was told to take it.

== Doublepost prevention - post automatically merged: ==

Excellent! Presumably this diagram will remain 196s from now on?
For the next few weeks at least. Believe there are some changes in may with full intro by sept.
 
Last edited:

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,929
Location
Telford
I had 196104 and 196108 today and no problems to report. Both were good journeys today. 104 from Telford Central to Smethwick Galton Bridge and 108 from Birmingham New Street to Telford Central.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
That is great news about the 196s starting to appear on Worcester route services :D I shall have to consider a WMDR tomorrow after all!
 
Status
Not open for further replies.