What! Thats three times in a matter of months the OLE has been brought down. How exactly does this happen? I'm slightly baffled.
 

daza7789

Member
Joined
4 Feb 2010
Messages
22
Happened around lunchtime, 1M08 lost pantograph on up fast, bringing down and damaging wires and Pway, Passengers eventualy detrained from 1M08, last update I saw was the up slow was open at line speed, and the down slow with a 20MPH ESR, T3 possesion was taken of the fast lines, and may well last some time into the night/early morning if things go well. virgin to run a 50% service and london midland are trying to run a full service with delays apparently, however as all departures from euston were suspended until just before the evening peak we will see how things go!
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Another working day for the billion pound railway then. Value for money all round!
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
1304/1324/1342 arrivals from Man Picc arrived at 1639/1651/1659 respectively !

First Up EBW for some time is the 1620 ex Wolves currently just terminated 24 o/t.

Last down EBWs were 1723 F&S then 1823 at 1841 also F&S.

Pretty much everything is being slaughtered both ways.

Another normal day on the WCML.
 

Daniel

Established Member
Joined
5 Oct 2005
Messages
2,565
Location
London
Was reported at 1234, and was only told at 1642 that trains were running with delays of up to two hours.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Still potentially the case.

A lot of stuff is reporting 60 to in excess of 90 o/t at Crewe and the one I was on (still am) left 30 late and then was 10 mph signal to signal from south of Hemel Hempstead to north of Berkhamsted thus losing a further 48 mins.

No sign of any work at Berko although the Fasts are blocked and everything is running on the Slows.

Up services appear to be running through without problem but Down services are being massacred with waiting for a path on the Down Slow and the 10 mph running on the DF/DS Hemel to Berko.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
Another normal day on the WCML.

Without sounding too pessimisitic I think this sums it up pretty well with the current state of affairs - only in the past couple of weeks was another post about the WCML going "Pete Tong"!

Just out of interest, you say it was service 1M08, what service was this, VT/LM/Southern and where was it from/to? (I don't know how to find such information :( )
 

ChrisTheRef

Established Member
Joined
15 Apr 2009
Messages
1,432
Location
South Liverpool
Without sounding too pessimisitic I think this sums it up pretty well with the current state of affairs - only in the past couple of weeks was another post about the WCML going "Pete Tong"!

Just out of interest, you say it was service 1M08, what service was this, VT/LM/Southern and where was it from/to? (I don't know how to find such information :( )

It's restricted info.

1M08 is the 0735 from Glasgow to Euston
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
It's restricted info.

1M08 is the 0735 from Glasgow to Euston

Indeed, TRUST says the booked 390 for that journey was 390053 - can anyone else confirm it that was indeed the 390 involved as sometimes allocations are put into TOPS which feeds TRUST then you have swaps later on due a maybe a fault on the booked train which might need another train to takeover it's workings.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
The local radio news says there is only 1 track running in the affected area today, can anyone confirm that?

Also does anyone have any views why this particular section of line has been affected so much recently? I never hear of any serious issues on the WCML north of Rugby (unless I am not listening)?
 

Bellwater

Member
Joined
10 Jan 2010
Messages
522
Location
on a 158
Been getting messages this morning... "Please pass all VWC tickets"

Not affecting me, but does that include VWC Staff Passes?

Senior Conductor says noooooooooo :lol::lol:
 

philjo

Established Member
Joined
9 Jun 2009
Messages
3,015
The FCC website is now reporting 30 minute delays due to overhead wire problems on the ECML at Welwyn Garden City.

Line problem in the Welwyn Garden City area area.
Train services between Stevenage and London Kings Cross are being disrupted due to overhead wire problems in the Welwyn Garden City area area.Delays of up to 30 minutes can be expected.
(Message Received: 09:06:38 09/02/2010)


Update: East Coast site says the problem is in the Hatfield Area. Several northbound EC services are shown as being almost an hour late.
I assume that services are now being diverted round the Hertford Loop?
 
Last edited:

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
Been getting messages this morning... "Please pass all VWC tickets"

Not affecting me, but does that include VWC Staff Passes?

Senior Conductor says noooooooooo :lol::lol:

Your attitude is appalling if you're being serious.

You have been instructed/told to accept all VWC tickets, you are not to decide what VWC to accept/refuse. A VWC staff pass, is by every means, a ticket valid for travel on VWC, regardless of who it is holding the ticket.

If a member of staff that I was supervising turned in late because you had refused this (temporarily) valid ticket or pass, I would have made every effort to find you and speak to your superiors. I personally would issue a Form 1.

On a different note, if you are a railwayman yourself you should appreciate that a lot of staff, their partners and children may be experiencing more difficulty in getting around than usual.

Don't ever ask any other railwaymen for favours next time you're a bit stuck getting about.
 

Daniel

Established Member
Joined
5 Oct 2005
Messages
2,565
Location
London
The local radio news says there is only 1 track running in the affected area today, can anyone confirm that?

I was told by the info controller they managed to get 1 line open a few hours after, then a while later another (1 up and 1 down)
 

Ibex

Member
Joined
23 Jan 2010
Messages
800
Still potentially the case.

A lot of stuff is reporting 60 to in excess of 90 o/t at Crewe and the one I was on (still am) left 30 late and then was 10 mph signal to signal from south of Hemel Hempstead to north of Berkhamsted thus losing a further 48 mins.

Were you on 2N99 or 2K01? (If you know)

The local radio news says there is only 1 track running in the affected area today, can anyone confirm that?

Also does anyone have any views why this particular section of line has been affected so much recently? I never hear of any serious issues on the WCML north of Rugby (unless I am not listening)?

Yep 1 track working from Bourne End to Tring commenced at 00:15 and when I left work the handback est had been pushed back to 06:15. All trains were running on the up slow and at one point the backlog of freights waiting to get through at Tring was backed all the way to a couple of signals north of Leighton Buzzard!

photo6o.jpg


Lovely!
 

Ibex

Member
Joined
23 Jan 2010
Messages
800
It's in the announcers office. Convenient ay, didn't even need to get off my chair.

But in all seriousness, normal working has been resumed I see!
 

Ibex

Member
Joined
23 Jan 2010
Messages
800
It's neither, a working screen on the WCML is just a figment of your imagination!

</hugely off topic>
 

Daniel

Established Member
Joined
5 Oct 2005
Messages
2,565
Location
London
Well going back to topic then - line side equipment failure at Berkhamsted =]
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
I got back to the flat after 2300 last night and was back out first thing to wait an hour and a half at New St for a service to Euston.

Most of the Up peak Class 1s were slaughtered around Bourne End some ending up 40 odd late in Euston.

The first Down EBW was 90 odd late approaching New St, where it pined.

I wish I had stayed in the Netherlands.

This whole WCML situation is getting silly now and becoming a fiasco. When will someone get wise and take maintenance out of Network Rail's hands and give it back to people who know what they are doing ?

No offence to maintenance staff on here. They know where my comment is aimed.
 

ralphchadkirk

Established Member
Joined
20 Oct 2008
Messages
5,754
Location
Essex
I don't know - if I ever become Prime Minister... :P

Sounds absolutely awful. IMO questions need to be asked about the WCML.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Your attitude is appalling if you're being serious.

You have been instructed/told to accept all VWC tickets, you are not to decide what VWC to accept/refuse. A VWC staff pass, is by every means, a ticket valid for travel on VWC, regardless of who it is holding the ticket.

If a member of staff that I was supervising turned in late because you had refused this (temporarily) valid ticket or pass, I would have made every effort to find you and speak to your superiors. I personally would issue a Form 1.

On a different note, if you are a railwayman yourself you should appreciate that a lot of staff, their partners and children may be experiencing more difficulty in getting around than usual.

Don't ever ask any other railwaymen for favours next time you're a bit stuck getting about.
I suspect it was said tongue in cheek ?

In the Railway Industry todays competitor is tomorrow's employer.

Even though the major Infrastructure Companies are in competition with one another, there is still an unwritten rule, right up to senior level that supports "mutual aid".

In an emergency staff / materials will always be made available to a competitor discretely, as only a very foolish individual would refuse to help out, and there is still a culture of "Railway Industry" within the Contractors, who primarily are still employing ex BR staff and are happy to do so unlike some other organisations.
 

boing_uk

Member
Joined
18 May 2009
Messages
619
Location
Blackburn
In an emergency staff / materials will always be made available to a competitor discretely, as only a very foolish individual would refuse to help out, and there is still a culture of "Railway Industry" within the Contractors, who primarily are still employing ex BR staff and are happy to do so unlike some other organisations.

I think you find that in most industries involving maintenance. In traffic signals for instance, the three major companies all help each other out at a local level, getting parts swapped over or technical help - even if it is frowned upon by the higher-ups.

I think they used to call it "getting the job done" or some other crazy old world term.
 
Status
Not open for further replies.

Top