Hi .just would like to know what trains crossrail will be operating and if these types of trains will be run through out the route or just in places
Hi .just would like to know what trains crossrail will be operating and if these types of trains will be run through out the route or just in places
Excuse my ignorance here but if Crossrail has only a fleet of 65 class 345s then how are they going to be able to run a service from the east to the west with just 65 trains? I would have thought they would be using a lot more trains.Crossrail will have a fleet of 65 9-car, 200m long, Class 345. These will be the only trains Crossrail has. They'll run throughout the Crossrail route. Wikipedia has good information on ths
Excuse my ignorance here but if Crossrail has only a fleet of 65 class 345s then how are they going to be able to run a service from the east to the west with just 65 trains? I would have thought they would be using a lot more trains.
Excuse my ignorance here but if Crossrail has only a fleet of 65 class 345s then how are they going to be able to run a service from the east to the west with just 65 trains? I would have thought they would be using a lot more trains.

Yes, the Class 345 Aventra is on order. It will be a unanimous fleet, just like on LU lines.
Excuse my ignorance here but if Crossrail has only a fleet of 65 class 345s then how are they going to be able to run a service from the east to the west with just 65 trains? I would have thought they would be using a lot more trains.
I'm surprised by that tbh as thought any service running through East to west would have loads of trains on the go at any one point .crossraill have recently recruited 400 drivers so what are they going to do ? Take turns in driving one of the 65 trains

I'm surprised by that tbh as thought any service running through East to west would have loads of trains on the go at any one point .crossraill have recently recruited 400 drivers so what are they going to do ? Take turns in driving one of the 65 trains
Sorry guys but I think your all wrong as if you just look on the crossrail website it has a timetable on there and has diffrent sections each having up to 12 tph ! Over the whole stretch that is more than 65 sorry 66 trains ! Come on people lets not put false information up on here as people are generally interested
Sorry guys but I think your all wrong as if you just look on the crossrail website it has a timetable on there and has diffrent sections each having up to 12 tph ! Over the whole stretch that is more than 65 sorry 66 trains ! Come on people lets not put false information up on here as people are generally interested
Sorry guys but I think your all wrong as if you just look on the crossrail website it has a timetable on there and has diffrent sections each having up to 12 tph ! Over the whole stretch that is more than 65 sorry 66 trains ! Come on people lets not put false information up on here as people are generally interested
Sorry guys but I think your all wrong as if you just look on the crossrail website it has a timetable on there and has diffrent sections each having up to 12 tph ! Over the whole stretch that is more than 65 sorry 66 trains ! Come on people lets not put false information up on here as people are generally interested
Best you don't apply for a diagramming job in the near future![]()
Checking his post history he's, erm, going to be driving for Crossrail!
Yes ive seen the link 47082 posted and have seen that it is indeed 65 /66 trains .i just always thought it would be loads more ,so how many trains run on the underground ? Roughly ?
Is just ive got an interview coming up for a diagramming /time table job coming up

Yes ive seen the link 47082 posted and have seen that it is indeed 65 /66 trains .i just always thought it would be loads more ,so how many trains run on the underground ? Roughly ?
Is just ive got an interview coming up for a diagramming /time table job coming up
--- old post above --- --- new post below ---
Good work ironside !
Well if you actually looked at the Crossrail site closely you would see that half the services only run to Paddington and that Paddington - Abbey Wood is only a 29min Journey and Paddington - Romford is only a 37min Journey and that the longest journey is 88mins which has already been pointed out is only 2 trains per hour. Compare that with Thameslink with a 2.5hour journey time between Bedford and Brighton and you can see why nearly twice as many trains have been ordered for Thameslink.
If your going to be doing the diagramming then yes they are probably going to have to buy more trains![]()
Well if you actually looked at the Crossrail site closely you would see that half the services only run to Paddington.
Do we know who is going to be doing the voice over on the class 345's at all please and when it comes to the Crossrail stations under London, I am presuming that 'Mind the Doors' will be used when the doors of the class 345's are closing?
No. Probably the same person who did the 2009TS and S stock PAs.
Highly unlikely that they would use something as complicated as 'Mind the doors' - when you can communicate the same message without language with some kind of beeper.
There is both a hustle alarm, and "Please stand clear of the closing doors" on LU some stock.
They are, it has gone up to 66 trains to cope with running to Reading.
While Shenfield to Reading is the longest run, there are a lot of shorter journeys as well. I don't think they simply guessed at the number of trains needed, someone will have done some homework
Unanimous? Well at least they won't argue with each other like Henry and Gordon in Thomas the Tank Engine.
Ubiquitous perhaps was the posh word you were looking for![]()