• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Why would a cancelled train run ECS (empty coaching stock) instead of remaining at a platform?

Status
Not open for further replies.

Philvis

Member
Joined
21 Jul 2016
Messages
6
Hi
Yesterday a Northern service from Piccadilly to Stoke and the return were cancelled due to a staffing issue. The train ran as an ECS to Stoke and return. I was wondering why did the train run instead of it just staying at Piccadilly.

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

muz379

Established Member
Joined
23 Jan 2014
Messages
2,515
Hi
Yesterday a Northern service from Piccadilly to Stoke and the return were cancelled due to a staffing issue. The train ran as an ECS to Stoke and return. I was wondering why did the train run instead of it just staying at Piccadilly.

Thanks
Probably issues with keeping units at picadilly at the minute because of 2 platforms being blocked by the roof works and this past few weeks they had another one being blocked to electric traction .
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,645
Location
Rochdale
It's a similar story at Victoria. ECS to Wigan, Chester and even Leeds is common. That's what happens when you only have one singular siding at a station with 30 trains an hour
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,030
Location
London
There’s a few reasons potentially.

A) Platform capacity - might not be possible to keep the service there blocking platforms for well over an hour. There may be no available sidings / depot nearby either.

B) The missing staff (presuming a guard) might be able to sourced at destination to start the service from there.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,467
Location
Somerset
There’s a few reasons potentially.

A) Platform capacity - might not be possible to keep the service there blocking platforms for well over an hour. There may be no available sidings / depot nearby either.

B) The missing staff (presuming a guard) might be able to sourced at destination to start the service from there.
Could it also be that it’s the driver’s only route retention run….
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,497
Location
Sheffield
I'd been wondering the same question on Saturday when a phantom service 2S90 clearly ran between Piccadilly and Sheffield on Saturday morning as it was seen in Sheffield. Both it and return service 2S71 show as cancelled due to an issue with the train crew.

The restricted platform availability is compounding the operational crewing difficulties.

Yesterday, Sunday, no service at all on some routes. On Piccadilly - Sheffield 5 of the hourly return services were cancelled. After news reports of big pay awards to resolve industrial relations disputes passengers are wondering what's going on. Inadequate notice is being given of cancellations and "short notice change to the timetable" is an incomprehensible explanation

Readers of this forum probably do understand that the historic railway operated very few Sunday services. Some companies have done better than others in providing 7 days a week timetables and crewing them. Northern in the North West has not. Hopefully this issue can soon be resolved because it's wrecking many people's travel plans.

Many examples could be quoted. I met a family who'd planned a trip to Manchester travelling from Bamford. Train cancelled so instead of parking drove back over to Dore and caught an EMR 6 car 170 fast - standing room only. How they got back heaven only knows!
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,391
Hi
Yesterday a Northern service from Piccadilly to Stoke and the return were cancelled due to a staffing issue. The train ran as an ECS to Stoke and return. I was wondering why did the train run instead of it just staying at Piccadilly.

Thanks
Train needs to vacate platform to allow another service to use platform.

If it remained and another unit came in on top, the other unit may not depart before the unit that ran ecs was next due to leave Piccadilly.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,851
This does seem a bit stranger than normal, with it running back ECS with the same driver. All i can guess is that Northern hoped to resource a guard at Stoke but weren't able to, and the platform at Picc was needed.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,494
Location
Yorkshire
This does seem a bit stranger than normal, with it running back ECS with the same driver. All i can guess is that Northern hoped to resource a guard at Stoke but weren't able to, and the platform at Picc was needed.
Is there actually a crew depot at Stoke for this to be a viable option?

I suppose it could have been spun at Macclesfield but probably by the time the planners have faffed around with changing the schedule/checking for conflicts, it is "cheaper" to just send it on its booked working

I would wager platform space at Picc being the reason for the service running ECS as it did
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,759
Is there actually a crew depot at Stoke for this to be a viable option?

I suppose it could have been spun at Macclesfield but probably by the time the planners have faffed around with changing the schedule/checking for conflicts, it is "cheaper" to just send it on its booked working

I would wager platform space at Picc being the reason for the service running ECS as it did
Almost certainly platform space at Picc, Stoke is 100% Picc work at Northern
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,030
Location
London
Almost certainly platform space at Picc, Stoke is 100% Picc work at Northern

Platform space for the train to be held there for its normal turnaround time + journey to stoke + back? Doubtful without multiple platform alterations and congestion.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,339
Location
Bolton
Platform space for the train to be held there for its normal turnaround time + journey to stoke + back? Doubtful without multiple platform alterations and congestion.
Normally it's probably awkward but achievable.

With two platforms blocked and out of use it may tip the balance to being too difficult.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,497
Location
Sheffield
This does seem a bit stranger than normal, with it running back ECS with the same driver. All i can guess is that Northern hoped to resource a guard at Stoke but weren't able to, and the platform at Picc was needed.
Similar with train run ECS to Sheffield.

2 platforms out of use at Piccadilly. Shortage of a conductor but driver ready. Clear platform and use normal path. No conductors will have route knowledge in Sheffield so back to Piccadilly as ECS. A lot of dead mileage. You can understand why some might ask why that if they can run up to 12 car trains in regular service in the London area as DOO why not in the north? (I wouldn't want to be stranded 2 miles into wet and deep Totley Tunnel with an incapacitated driver in charge!)
 
Last edited:

GordonT

Established Member
Joined
26 May 2018
Messages
1,717
Can't speak for the particular example which prompted the thread but it's an occasional feature for ScotRail to operate an ECS journey and cancel the passenger carrying journey booked for the same unit to the same destination in the immediate wake of its late-running inbound journey in order to get it back on diagram for subsequent journeys. As an alternative to "stop skipping" it appears to wind prospective passengers up marginally less and is less disruptive than running the set late for multiple subsequent journeys and losing paths and connections in consequence and winding up a much larger amount of passengers in the process.
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Ahem. Perhaps the performance penalty for running a train with no guard ECS is 50%. Just a thought...
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,759
Platform space for the train to be held there for its normal turnaround time + journey to stoke + back? Doubtful without multiple platform alterations and congestion.
As in “almost certainly platform space at Picc (or lack thereof) was the reason for the move”
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
Can't speak for the particular example which prompted the thread but it's an occasional feature for ScotRail to operate an ECS journey and cancel the passenger carrying journey booked for the same unit to the same destination in the immediate wake of its late-running inbound journey in order to get it back on diagram for subsequent journeys. As an alternative to "stop skipping" it appears to wind prospective passengers up marginally less and is less disruptive than running the set late for multiple subsequent journeys and losing paths and connections in consequence and winding up a much larger amount of passengers in the process.

The follows the amount of political heat ScotRail were under for cancelling stops on late running trains....
 

Statto

Established Member
Joined
8 Feb 2011
Messages
4,104
Location
At home or at the pub
This is very common on AWC, if a train has been cancelled trains because of staff shortage, the train then runs ECS to where it was supposed to terminate as a passenger service.
 
Status
Not open for further replies.

Top