The line from Whitland to Pembroke Dock will be closed for five days from Monday 24 April for engineering works.

Does anyone know the nature and extent of these works, please?

I'm ruling out electrification...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RichA

Member
Joined
17 Mar 2010
Messages
50
Steel sleeper relay 259m5ch - 286m21ch
Level crossing work at 274m63ch & 286m26ch
Vegetation clearance 285m6ch and 285m75ch

10 engineering trains booked to work in possession plus one tamper
 

Ships

Member
Joined
25 Apr 2013
Messages
338
Steel sleeper relay 259m5ch - 286m21ch
Level crossing work at 274m63ch & 286m26ch
Vegetation clearance 285m6ch and 285m75ch

10 engineering trains booked to work in possession plus one tamper

27 miles of steel sleeper relay?
 

allaction

Member
Joined
27 Sep 2015
Messages
166
Steel sleeper relay 259m5ch - 286m21ch
Level crossing work at 274m63ch & 286m26ch
Vegetation clearance 285m6ch and 285m75ch

10 engineering trains booked to work in possession plus one tamper

Great - many thanks. They can weed spray the tracks in Tenby station if they have a spare mo, too...
 

RichA

Member
Joined
17 Mar 2010
Messages
50
Correct - suspect spot re-sleepering/relay sites within that mileage.
 

allaction

Member
Joined
27 Sep 2015
Messages
166
By the way, absolutely no signs at Tenby station this morning to advise those on the station - disgruntled passengers were not happy, particularly with the rail replacement bus to Whitland also departing 20 minutes before the train usually would.

Why couldn't ATW or Network Rail have put at least one poster up at the station?
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,378
Location
Calder Valley
By the way, absolutely no signs at Tenby station this morning to advise those on the station - disgruntled passengers were not happy, particularly with the rail replacement bus to Whitland also departing 20 minutes before the train usually would.

Why couldn't ATW or Network Rail have put at least one poster up at the station?

I feel you will need to direct your questions to ATW on that one.
Sam
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
By the way, absolutely no signs at Tenby station this morning to advise those on the station - disgruntled passengers were not happy, particularly with the rail replacement bus to Whitland also departing 20 minutes before the train usually would.

Why couldn't ATW or Network Rail have put at least one poster up at the station?

Somebody has already tweeted ATW, this morning. Said would report to relevant people
 

allaction

Member
Joined
27 Sep 2015
Messages
166
Somebody has already tweeted ATW, this morning. Said would report to relevant people

That was me! And since then, they've Tweeted twice (no response though from Network Rail in Wales.)

The Tenby Observer and Western Telegraph websites are also featuring the closure, and the local Tourist Office has been informed, so I've been a busy bee.

I popped in to the station this afternoon: still no posters up, nothing of any use on the electronic displays on the platforms, and two passengers sitting glumly on the steps of the bridge waiting for a further hour, having been incorrectly sent to the town centre bus stop instead of waiting in the station car park for the bus.

Later on, a 56 seater rail replacement coach (empty) bombed up my road heading for the station. I would imagine that 30 seconds later, when attempting to turn out of my road, he would have realised why coaches never use this road...

All in all, an object lesson in how not to handle an engineering blockade...
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
One gets the impression that ATW assumes everybody has Computer access and Phone Apps whilst, at the same time, not being helpful to people who are not computer literate or some elderly people who may struggle with certain technology. Even on Twitter, and when the answer could be a direct yes or no, you would be quoted a link and sometimes the information can be quite a lengthy process (that's if it's the correct link in the first place) to find. The TOC gives the impression that you should electronically check out your journey prior to each occasion you intend to travel. I had a set to some years ago when, on reading Station posters regarding Engineering work on the Cardiff Valleys network and which more or less summarised details affecting some of the routes. There was no mention on the Poster that the Penarth service would be reduced from quarter to half hourly during the day. The reply I got was that the information was all there and could be found by going on line or other info systems and that a person should check their journey before setting out. I assume from that statement, that somebody who travels from Penarth to Cardiff to work should do this and check each day.
 

pdq

Member
Joined
7 Oct 2010
Messages
894
That was me! And since then, they've Tweeted twice (no response though from Network Rail in Wales.)

The Tenby Observer and Western Telegraph websites are also featuring the closure, and the local Tourist Office has been informed, so I've been a busy bee.

I popped in to the station this afternoon: still no posters up, nothing of any use on the electronic displays on the platforms, and two passengers sitting glumly on the steps of the bridge waiting for a further hour, having been incorrectly sent to the town centre bus stop instead of waiting in the station car park for the bus.

Later on, a 56 seater rail replacement coach (empty) bombed up my road heading for the station. I would imagine that 30 seconds later, when attempting to turn out of my road, he would have realised why coaches never use this road...

All in all, an object lesson in how not to handle an engineering blockade...
Who's providing the RRB now that Silcox are gone?

Sent from my SM-A510F using Tapatalk
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
I notice that the Down Pembroke Dock trains which are terminating at Whitland are, after arrival at Whitland, running empty to Clarbeston Rd and back into the Up platform to return to Carmarthen direction. On examining RTT would appear to be merely to get out of the way of trains going to and from Milford Haven.
 

allaction

Member
Joined
27 Sep 2015
Messages
166
Who's providing the RRB now that Silcox are gone?

Sent from my SM-A510F using Tapatalk

Silcox rarely provided the bus replacements when they were in business, Arriva using a number of even smaller operators from the Carmarthen area instead.

But yesterday's coach was plain white with no visible markings.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,128
I thought that they would have been laying long welded track on concrete sleepers? Surely, this work should have been done in winter - not now - going into the tourist season?

Tenby station is a disgrace for the major resort in Pembrokeshire. Part of it has been hired out to some sort of removal company. You would think that perhaps it could have become a National Park Office whereby staff could deal with queries and sell tickets?
 