Steel sleeper relay 259m5ch - 286m21ch
Level crossing work at 274m63ch & 286m26ch
Vegetation clearance 285m6ch and 285m75ch
10 engineering trains booked to work in possession plus one tamper
Steel sleeper relay 259m5ch - 286m21ch
Level crossing work at 274m63ch & 286m26ch
Vegetation clearance 285m6ch and 285m75ch
10 engineering trains booked to work in possession plus one tamper
27 miles of steel sleeper relay?
By the way, absolutely no signs at Tenby station this morning to advise those on the station - disgruntled passengers were not happy, particularly with the rail replacement bus to Whitland also departing 20 minutes before the train usually would.
Why couldn't ATW or Network Rail have put at least one poster up at the station?
By the way, absolutely no signs at Tenby station this morning to advise those on the station - disgruntled passengers were not happy, particularly with the rail replacement bus to Whitland also departing 20 minutes before the train usually would.
Why couldn't ATW or Network Rail have put at least one poster up at the station?
Somebody has already tweeted ATW, this morning. Said would report to relevant people
Who's providing the RRB now that Silcox are gone?That was me! And since then, they've Tweeted twice (no response though from Network Rail in Wales.)
The Tenby Observer and Western Telegraph websites are also featuring the closure, and the local Tourist Office has been informed, so I've been a busy bee.
I popped in to the station this afternoon: still no posters up, nothing of any use on the electronic displays on the platforms, and two passengers sitting glumly on the steps of the bridge waiting for a further hour, having been incorrectly sent to the town centre bus stop instead of waiting in the station car park for the bus.
Later on, a 56 seater rail replacement coach (empty) bombed up my road heading for the station. I would imagine that 30 seconds later, when attempting to turn out of my road, he would have realised why coaches never use this road...
All in all, an object lesson in how not to handle an engineering blockade...
Who's providing the RRB now that Silcox are gone?
Sent from my SM-A510F using Tapatalk