59CosG95
Established Member
Oxford has already been remodelled and resignalled to the spec planned for when it was still going to be electrified in CP5, it's just that the wires haven't made it yet.Why wasn’t London Gateway electrified when built? Was it before Goblin was authorised? Surely it is a quick easy (it’s all relative) job and gets some diesels out of London.
If Basingstoke - Bletchley was electrified for the container trains would Oxford be able to cope with the northbound ones all turning right across the northern approach, or would this actually be easier than them turning right across Chiltern at Leamington?
Are any of those routes ‘simple’ electrification? Most seem to need major remodelling first - ie Leicester area, Soham/Ely, Oxford/EWR. Maybe Mendips-Newbury (but that is looong)???
My crayons say do Nuneaton/Brum/Tamworth triangle but that needs to account for HS2, a local electric service to Tamworth with new stations, and preferably remodelling Whitacre (straighter and maybe a triangle for Birch Coppice Access?)
AFAIK, between Bicester Gavray Jn & Oxford North Jn, only Wolvercot Tunnel has a clearance problem; EWR just need to sort out the stretch between Gavray & Denbigh Hall (Bletchley) Jns.