What would the ideal Oxbridge Arc look like?

What developments would you like to see in the Oxbridge Arc?

  • 2tph Oxford - Cambridge

    Votes: 55 52.9%
  • 4tph Oxford - Cambridge

    Votes: 32 30.8%
  • 2tph Oxford - Milton Keynes

    Votes: 52 50.0%
  • 2tph Cambridge - Milton Keynes

    Votes: 35 33.7%
  • 2tph Aylesbury - Milton Keynes

    Votes: 45 43.3%
  • Birmingham - Cambridge trains via MK

    Votes: 29 27.9%
  • Direct Bristol - Cambridge trains

    Votes: 55 52.9%
  • Direct Oxford - Norwich trains

    Votes: 32 30.8%
  • Bournemouth - Manchester trains diverted via MK

    Votes: 10 9.6%
  • Rationalisation of Marston Vale stations

    Votes: 34 32.7%
  • Full overhead electrification of EWR

    Votes: 71 68.3%
  • New town at Winslow

    Votes: 38 36.5%
  • New town at Stewartby

    Votes: 36 34.6%
  • New town at Tempsford

    Votes: 45 43.3%
  • Smaller, but denser, garden towns along the line

    Votes: 33 31.7%
  • More science and tech industry along the line

    Votes: 51 49.0%
  • More manufacturing industry along the line

    Votes: 31 29.8%
  • More tourist destinations along the line

    Votes: 26 25.0%
  • Large-scale solar farms along the line

    Votes: 14 13.5%
  • Completion of Oxford - Cambridge expressway

    Votes: 17 16.3%
  • New reservoirs along the line

    Votes: 26 25.0%
  • Wildlife conservation areas along the line

    Votes: 24 23.1%
  • Enterprise zones to enable business growth

    Votes: 22 21.2%
  • Large scale urban and rural parkland

    Votes: 26 25.0%
  • More social housing

    Votes: 42 40.4%

  • Total voters
    104

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
I couldn't disagree more.

I have used it to travel between Oxford and Hampshire, Birmingham, Stafford and Manchester. Send it up the GWML (in what paths?) and it's all but useless.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
Re-routing entirely? How are you replacing the connectivity lost?
Exactly

Post HS2 it should definitely remain for connectivity purposes (even if cut back to Bournemouth - Birmingham). Birmingham International will then become a useful interchange for faster onward travel to Manchester via HS2.
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
Re-routing entirely? How are you replacing the connectivity lost?

Extend London to Oxford fasts to Birmingham? Surely it'll be quicker to get from South of Basingstoke to Birmingham/northwards via OOC.

== Doublepost prevention - post automatically merged: ==

I couldn't disagree more.

I have used it to travel between Oxford and Hampshire, Birmingham, Stafford and Manchester. Send it up the GWML (in what paths?) and it's all but useless.

Yes but surely you'd rather get to Manchester via HS2 if you live in Oxford.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
Extend London to Oxford fasts to Birmingham? Surely it'll be quicker to get from South of Basingstoke to Birmingham/northwards via OOC.

== Doublepost prevention - post automatically merged: ==



Yes but surely you'd rather get to Manchester via HS2 if you live in Oxford.
You would go via MK.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
HS2 will be no use at all for Oxford.

I suppose you could extend the Padd - Oxford service to Birmingham, but that will still represent a reduction in capacity between Reading and Oxford. Which is (anecdotally) quite a popular journey.
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
HS2 will be no use at all for Oxford.

I suppose you could extend the Padd - Oxford service to Birmingham, but that will still represent a reduction in capacity between Reading and Oxford. Which is (anecdotally) quite a popular journey.

Surely it will. Are you saying so because the interchanges are bad?
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
From Oxford station, Birmingham New Street is about 1h15 away, and Paddington is around an hour. So going all the way to one end to get a train to the other isn't going to be how anyone gets anywhere.

Oxford to Manchester Piccadilly is 2h50 by Cross Country. Let's be generous and say Oxford to OOC is 50 minutes, then allow 15 minutes to change to the HS2 train - is OOC to Manchester going to be faster than the remaining 1h45? Will it be by enough to make it worth the hassle of changing?

That's just Oxford of course, which (along with Banbury) is perfectly located that HS2 will not be any use to replace existing direct trains. I did find that Oxford to Glasgow made sense via Euston. It's not especially faster, but the Birmingham to Glasgow trains are tedious with their stopping everywhere... So OOC would make sense for that, unless the WCML post HS2 service has something useful at MK.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,327
Location
Swansea
Why stop at Bristol, we might as well start from Cardiff and continue on to Cambridge.
Birmingham via MK to EWR and Bristol via Didcot to EWR make sense.

Cardiff would be another via Didcot to EWR (you wouldn't go via Temple Meads) so of the two Bristol makes more sense. Bristol also houses the better university because it makes more sense.

Cardiff would also need investment at Cardiff Central to handle more trains, where Bristol Temple Meads is more ready to go with capacity for terminating trains from the East.
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,133
Cardiff would be another via Didcot to EWR (you wouldn't go via Temple Meads) so of the two Bristol makes more sense. Bristol also houses the better university because it makes more sense.

Cardiff would also need investment at Cardiff Central to handle more trains, where Bristol Temple Meads is more ready to go with capacity for terminating trains from the East.
[/QUOTE]

== Doublepost prevention - post automatically merged: ==

'Bristol also houses the better university because it makes more sense.'

What does that mean?
 

Farnborough

Member
Joined
2 Mar 2025
Messages
317
Location
Farnborough
I think post-HS2 rerouting the Bournemouth service to Paddington would be more useful to provide a link with OOC from Dorset/Hampshire.
Absolutely not! We do not need yet another London service. And OOC will be available by changing at Reading

The Bournemouth/Basingstoke/Reading service provides the only north/south route from out this way...
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,060
Location
Denmark
The proposed service in the non-statutory consultation is:

2tph Oxford-Cambridge
2tph Oxford-Milton Keynes
2tph Cambridge-Stewartby
1tph Bedford-Bletchley stopper

If the consolidated stations option is chosen then the stopper gets dropped and one of Cambridge-Stewartby trains runs through to/from Bletchley.


In the absence of a north curve at Bletchley, there are no Cambridge-Milton Keynes direct trains.


Bristol and Birmingham are not in the corridor, and they weren't in the arc. They are not essential for developing the corridor.
Just because there is no north curve doesn't mean you can't run a Cambridge - MK train. Just let the train reverse at Bletchley...

== Doublepost prevention - post automatically merged: ==

Absolutely not! We do not need yet another London service. And OOC will be available by changing at Reading

The Bournemouth/Basingstoke/Reading service provides the only north/south route from out this way...
I mean providing a new service could be looked at?

== Doublepost prevention - post automatically merged: ==

That is one issue with the idea, though it should be possible to get an extra pair of tracks between Bletchley and MKC, and another one or two platforms at MKC, without significant demolition. That would of course push the cost up somewhat. But I think there's enough demand from the east to MKC to cover a fair whack of that cost - the Marston Vale is only a basket case because it goes to Bletchley which is not where most want to go. If it went to MKC I think it would be a very typical provincial DMU commuter service - sure, not 12 car trains, but the 2 car ones wouldn't give everyone 4 or 6 seats each.
Could a reversal at Bletchley help?
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
Just because there is no north curve doesn't mean you can't run a Cambridge - MK train. Just let the train reverse at Bletchley.
The railway doesn't operate by "just let the train reverse". It needs track, points, signalling and line capacity.

The only possible platform for reversal at Bletchley Low Level is platform 5, and the only possible track between platform 5 and Denbigh Hall is the reversible No2. The other option is to reverse at the High Level, but that obstructs the Oxford trains.

Either also need paths between Denbigh Hall and Milton Keynes.

So it isn't possible to "just let the train reverse" at Bletchley.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
WCML paths are one thing, but reversing at Bletchley is a much more probable way to get a Cambridge to MK service than demolition of the depot and some surrounding buildings.

It'd be a big project, but smaller than a north curve.
 

Jim the Jim

Member
Joined
18 Dec 2020
Messages
280
Location
Cambridge
One very big question for me is how do you avoid overwhelming Cambridge and Oxford with more motor traffic from surrounding settlements (both cities are already struggling with traffic levels).

Also not continuing to neglect facilities for local people in both cities, particularly those in poorer areas.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,307
Location
London
A Bedford - Cambridge alignment as straight as possible. Development pattern mainly focused on repairing the suburbanisation damages to existing settlements - Bedford St Johns - Tesco infilled with mixed-use developments, Central Milton Keynes rebuilt to continental densities from the station to the John Lewis.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
One very big question for me is how do you avoid overwhelming Cambridge and Oxford with more motor traffic from surrounding settlements (both cities are already struggling with traffic levels).
By investing in new transport infrastructure.

The other place has what looks to me like a well thought out transport strategy which is being discussed here:


I thought that the most unlikely bit of the strategy was reopening Cowley, but that was announced last week.


An Oxford railway line closed to passengers since 1963 is being reopened.

The Cowley Branch Line is currently only used by freight going to and from the BMW Mini Plant, but new stations will be opened in Cowley and Littlemore in south-east Oxford.

The government has pledged £120m in funding, part of a £500m investment in infrastructure to link up Oxford and Cambridge and turn the region into the "European Silicon Valley".
There is no similar strategy for Cambridge yet, that probably awaits the Cambridge Growth Company turning into a Development Corporation. In the meantime heavy rail does most of the heavy lifting in Cambridge with the main station having more than 10 million entrances and exits and Cambridge North more than 1 million. When Cambridge South opens next year we will be part way towards having a north-south Cambridge Metro. East West Rail, Tempsford and Cambourne are going to be critical for future growth in Cambridge without overwhelming the road network.

A Bedford - Cambridge alignment as straight as possible.
Why? Straightness is not a key feature. What matters for the route is for it to pass through Tempsford and Cambourne, then enter Cambridge from the south.

repairing the suburbanisation damages to existing settlements - Bedford St Johns - Tesco infilled with mixed-use developments, Central Milton Keynes rebuilt to continental densities
Bedford and Milton Keynes have the opportunity to benefit hugely from East West Rail by being the prime locations with good access to both Oxford and Cambridge.

Also not continuing to neglect facilities for local people in both cities, particularly those in poorer areas.
This is an important issue, Cambridge is one of the most unequal cities in the UK.
 

gallafent

Member
Joined
23 Dec 2010
Messages
550
A Bedford - Cambridge alignment as straight as possible.
Absolutely this. Instead of as bendy as possible, which appears to have been the main design goal for the current route. Does anyone know what the ratio of crow-flies to track distance, from Bedford (central station) to Cambridge (central station) with the current plan will be, and the expected journey times from Bedford (central) and MK (central) to/from Cambridge (central)? Horribly high, I fear. The consequent slow end-to-end journeys will mean that many (probably including me) will simply choose to (continue to) use the (by that time all expressway-grade from MK at least) A421 in our (electric) cars, to move between Oxfordshire/Buckinghamshire/Bedfordshire and Cambridge. Hey ho.

The "outer suburb" settlements around Cambridge definitely deserve decent public transport into the city, of course! For me it's just extremely unfortunate that EWR has decided its primary aim is to provide only that, instead of a fast mid-distance connection to Bedford and MK. Well, given the speed at which the project is progressing, I will have retired before it's open end-to-end anyway. Shrug.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
Instead of as bendy as possible, which appears to have been the main design goal for the current route.
The design goal is to include Tempsford and Cambourne then to approach Cambridge from the south.

Does anyone know what the ratio of crow-flies to track distance, from Bedford (central station) to Cambridge (central station) with the current plan will be, and the expected journey times from Bedford (central) and MK (central) to/from Cambridge (central)?

The non statutory consultation did give some estimated journey times. Bedford-Cambridge is 35 minutes.

Good luck trying to beat that to Central Cambridge or the Biomedical Campus by road at commuting times. You might get to Madingley quite quickly but then what?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
The railway doesn't operate by "just let the train reverse". It needs track, points, signalling and line capacity.

The only possible platform for reversal at Bletchley Low Level is platform 5, and the only possible track between platform 5 and Denbigh Hall is the reversible No2. The other option is to reverse at the High Level, but that obstructs the Oxford trains.

Either also need paths between Denbigh Hall and Milton Keynes.

So it isn't possible to "just let the train reverse" at Bletchley.
You cannot reverse at high level without shunting out the station behind a ground position signal.
 

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,461
The design goal is to include Tempsford and Cambourne then to approach Cambridge from the south.



The non statutory consultation did give some estimated journey times. Bedford-Cambridge is 35 minutes.

Good luck trying to beat that to Central Cambridge or the Biomedical Campus by road at commuting times. You might get to Madingley quite quickly but then what?
But once you factor in getting from home to Station, parking up etc any train time advantage starts evaporating. Add in the better ambience and comfort of your car, plus not being beholden to the rail industry and the @gallafent scenario becomes much more likely.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
But once you factor in getting from home to Station, parking up etc any train time advantage starts evaporating.
Not if the car journey takes all of those 35 minutes, and more, to get from Madingley to the final destination in Cambridge. Buses taking 30 minutes just to do the main station to the Addenbrookes roundabout is a common occurrence.

I suspect that there will be a lot of driving to stations with good road access especially Tempsford and Ridgmont.





not being beholden to the rail industry
This is why East West Rail needs to be kept as self contained as possible so that it does not import delays from elsewhere.

== Doublepost prevention - post automatically merged: ==

Add in the better ambience and comfort of your car,
People I know who commute into Cambridge by car don't describe the experience that way!
 

gallafent

Member
Joined
23 Dec 2010
Messages
550
The design goal is to include Tempsford and Cambourne then to approach Cambridge from the south.
I know, my observation about the circuitous route being the _goal_ was tongue-in-cheek, I'm aware that it's actually a _consequence_ of the desire to serve those locations.
The non statutory consultation did give some estimated journey times. Bedford-Cambridge is 35 minutes.
That's faster than I expected, and good news ... I really hope that this service will be able to make sense for longer-distance commuters like me (I'd generally be using the route from one station out of Oxford / Bletchley (changing from Leighton Buzzard) / Ridgmont)! Even if it doesn't work out door-to-door for my (I'm aware relatively rare!) use-case, of course, if it takes traffic of the A421 (and A14, and A34, and M40, and A43!) then so much the better for those that end up still using the car! :)
Good luck trying to beat that to Central Cambridge or the Biomedical Campus by road at commuting times. You might get to Madingley quite quickly but then what?
Then unless the weather is _really_ bad, I get on a bike (my own folder or a rental electric-assist), which gets me to the office in central Cambridge in 17 minutes (it's 5 minutes by bike, on the other hand, from central railway station). Otherwise the P&R bus then walk, 19 minutes. And so yes, there's more than just the drive time to consider (same as there is more than just the station-to-station train time), but Madingley Road Park & Ride is well-connected, thankfully. I'm guessing that it would be better to use a different P&R (Trumpington) when coming from the west to the biomedical campus, but I'm less familiar with that part of town.
Add in the better ambience and comfort of your car, plus not being beholden to the rail industry
Speaking of the latter, I just found while doing some planning for this week and next that it's £114.20 for an anytime day return Oxford-Cambridge, which isn't particularly encouraging (even in my old petrol car I was spending about £45-£55 each week on petrol for my usual pattern of three days in one or other of our offices, and the electric car costs substantially less to fuel per mile). Even booking a bit further out and allowing splits, I've not managed less than £60. I hope that the "Not London" fares on the route will be _substantially_ cheaper!
People I know who commute into Cambridge by car don't describe the experience that way!
:) Each to its own I guess. My car (even the old one!) definitely has a better ambience than even the newish park and ride buses (I used a little bluetooth monitor to measure 11degC and 100% humidity in one such, last winter), and certainly the older diesel ones. Both crash and rock enjoyably along the cratered surface of Madingley Road. I hope that the trains which operate the route to Cambrige will have a decent interior ambience, better than the buses, at least, time will tell. I wonder if they'll have a diesel engine under each carriage (as those chosen to operate Oxford-MK do), to add a nice relaxing foot massage and drown out the people playing social media or music out loud on their phones, that would be something at least. ;)

I'm aware that my tone around this project is sometimes negative. That arises from what feels like the incredibly slow speed with which the project makes progress (the reopening of the entire route has been mooted for my whole adult life, and so far, decades in, we have only got as far as an upgrade to the line between Bicester and Oxford, and that's it!), as well as from my disappointment about the motivations for the Bedford-Cambridge section (prioritising local commuting rather than medium distance / regional).
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,657
Also let’s remember this is not one single Travel to Work area, or sphere of influence. There are three: Oxford, Milton Keynes and Cambridge.

MK and Cambridge are basically unrelated in this axis and project. Not commutable or really compatible, and that is fine. MK and Oxford relate much more realistically. And that train will do gang busters.

Anyone doing MK - Cambridge might be better via London. The Cambridge TTW daily sphere will end at Bedford in practice, and then we will see more distinct incremental paired demand, like Oxford. But that isn’t the daily journey.

It’s fine that this doesn’t do all things to all people. The two hubs are at either end and demand will reflect that.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
My car (even the old one!) definitely has a better ambience than even the newish park and ride buses (I used a little bluetooth monitor to measure 11degC and 100% humidity in one such, last winter), and certainly the older diesel ones.
The Whippet electric buses are good, with fantastic aircon in last summer's heatwaves.

Both crash and rock enjoyably along the cratered surface of Madingley Road.
As a cyclist I agree that the state of the roads in Cambridge is dreadful, and there is an interesting question on how much electric buses are contributing to that.

I'm aware that my tone around this project is sometimes negative. That arises from what feels like the incredibly slow speed with which the project makes progress (the reopening of the entire route has been mooted for my whole adult life, and so far, decades in, we have only got as far as an upgrade to the line between Bicester and Oxford, and that's it!), as well as from my disappointment about the motivations for the Bedford-Cambridge section (prioritising local commuting rather than medium distance / regional).
I share your frustrations about how long it is taking. But on their own, the medium distance and regional links have never been enough to make a strong case for the Bedford-Cambridge section, and that's one of the reasons for the historical delays. The commuting from Cambourne and especially Tempsford facilitates the medium distance and regional links.

Also let’s remember this is not one single Travel to Work area, or sphere of influence. There are three: Oxford, Milton Keynes and Cambridge.

MK and Cambridge are basically unrelated in this axis and project. Not commutable or really compatible, and that is fine. MK and Oxford relate much more realistically. And that train will do gang busters.

Anyone doing MK - Cambridge might be better via London. The Cambridge TTW daily sphere will end at Bedford in practice, and then we will see more distinct incremental paired demand, like Oxford. But that isn’t the daily journey.

It’s fine that this doesn’t do all things to all people. The two hubs are at either end and demand will reflect that.
Having two hubs at either end does make East West Rail an unusual project, and I'll happily admit to looking at it mainly from the Cambridge end.

East West Rail have been quite specific on getting Stewartby into Cambridge Travel to Work range.

My feeling is that Cambridge-Milton Keynes journeys will use East West Rail, but with Ridgmont as a de facto Milton Keynes Parkway.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
The Oxford-Cambridge corridor is going to get a forest see here:


Millions of trees to help get Britain growing through billion-pound investment in green jobs and nature restoration, creating thousands of jobs
From:Department for Environment, Food & Rural AffairsPublished5 November 2025

s300_Autumn_Landscape.jpg

  • Second new national forest will be in the Oxford-Cambridge corridor.
  • A competition will be launched for a third new national forest in the Midlands or North of England in early 2026

However, no specific location is identified.

The exact location of the Ox-Cam national forest award is subject to design work and discussion with partners. The forest will embed nature recovery into development, with green spaces designed alongside new homes, jobs, and infrastructure.
 

Technologist

Member
Joined
29 May 2018
Messages
467
The Oxford-Cambridge corridor is going to get a forest see here:




However, no specific location is identified.
It always makes my heart sink when I see "creating thousands of jobs" in any government announcement. Jobs are a cost and it leads us to a "broken windows" theory of public investment (break windows, fix windows, jobs created).
 

The Pelican

Member
Joined
3 Oct 2025
Messages
425
Location
London
An actually ambitious Oxford-Cambridge arc forest would be to build a wildlife corridor (not nessicarily covered in trees, as most of Southern england has been deforested since at least Celtic times) joining University Parks in Oxford to Coe Fen in Cambridge, both pieces of green land near the centre of each city already connected by greenery to the countryside. It looks like the Chiltern National Landscape already covers the route from Oxford to Luton. They used to say that you could walk between the two cities entireley over land owned by the St John's colleges at each, so letting people walk between them over a national park could be a good idea!
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
There was a new announcement about the Oxford Cambridge Forest earlier this week see here:


A new national forest in the Oxford-Cambridge Corridor has moved a step closer today (Monday 12 January) with the announcement that the search for official delivery partners has begun.

The Department for Environment, Food and Rural Affairs has opened an Expression of Interest process with interested parties needing to demonstrate they have the capacity, experience, and knowledge to deliver the outcomes required for a new national forest in the Oxford-Cambridge Growth Corridor – along with expertise in large-scale woodland creation, community engagement, and cross-sector partnerships.
 

Top