There has been some speculation in the Elizabeth Line threads about services to OOC and rather than answer there I thought it best to start a new thread. In 2013 on the London Reconnections web site there was an article which speculated on the possible need to expand the track layout between Old Oak Common and Paddington to 8 tracks. It included the then proposed layout for the Elizabeth Line and a more speculative suggestion for the line once OOC was complete.

I think the current layout is similar to the proposal from 2009 with a major difference between Ladbrook Grove and Great Western Road which causes a conflict between EL trains and any slow GWR service on the relief lines. I think the original plan was that the Elizabeth Line services would have exclusive use of the relief lines in this area. I see that might still happen with the GWR services moving to the fast lines.
There has been little information about any actual plans regarding services at OOC from TfL who seem to be hoping that HS2 will pay for everything so best not to mention it in case they get asked for some cash.
With the delay to the completion of the HS2 station at Euston improvements to the relief lines might be needed more than ever, to handle all the people wanting to get to Central London. This raises a number of questions:
1/ Is it even possible to fit 8 tracks under the bridge at Golbourne Road?
2/ Is there still anyone in the Kensington and Chelsea council pushing for a new station on the Elizabeth Line in either of the locations mentioned in the article?
3/ ETCS L2 will be installed all the way to Paddington by the time OOC opens, so is there any need for 4 Elizabeth line tracks?
4/ Would the EL tracks between OOC and Paddington be better served by the use of CBTC on that section of track?
Does anyone know if any of the above questions have been answered yet and if not what do you think the answer might be?
The key issue is that the Crossrail service beneath London is headway-driven, whereas the service west of the Royal Oak portal is timetable-driven. The section from Royal Oak to OOC forms the boundary between the two, where services are regulated. A more intensive service over this two-track section will make the whole route prone to disruption. It will almost certainly need to be quadrupled. Four-tracking from Kensal will also allow WCML and GWML services to be sorted, and this provides a buffer against disruptions on the alternative routes west.

I think the current layout is similar to the proposal from 2009 with a major difference between Ladbrook Grove and Great Western Road which causes a conflict between EL trains and any slow GWR service on the relief lines. I think the original plan was that the Elizabeth Line services would have exclusive use of the relief lines in this area. I see that might still happen with the GWR services moving to the fast lines.
There has been little information about any actual plans regarding services at OOC from TfL who seem to be hoping that HS2 will pay for everything so best not to mention it in case they get asked for some cash.
With the delay to the completion of the HS2 station at Euston improvements to the relief lines might be needed more than ever, to handle all the people wanting to get to Central London. This raises a number of questions:
1/ Is it even possible to fit 8 tracks under the bridge at Golbourne Road?
2/ Is there still anyone in the Kensington and Chelsea council pushing for a new station on the Elizabeth Line in either of the locations mentioned in the article?
3/ ETCS L2 will be installed all the way to Paddington by the time OOC opens, so is there any need for 4 Elizabeth line tracks?
4/ Would the EL tracks between OOC and Paddington be better served by the use of CBTC on that section of track?
Does anyone know if any of the above questions have been answered yet and if not what do you think the answer might be?